PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/23/17 EST. NO. 003 TIME 03:55 PM R.E. NAME: GORONA, MARK 01-0B4304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/23/17 EST. NO. 003 TIME 03:55 PM R.E. NAME: GORONA, MARK 01-0B4304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 8/17 -10,000.00 003 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0B4304 TIME 03:55 PM ESTIMATE NO. 003 BID OPENING 11/15/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: GORONA, MARK DATE OF THIS ESTIMATE 08/23/17 LOCATION PROGRESS ESTIMATE 01-HUM-101-111.3/111.7 ----------------- WEST COAST CONTRACTORS, INC. IN HUMBOLDT COUNTY NEAR BIG LAGOON 61050 HIGHWAY 101 FROM 1.8 TO 2.2 MILES NORTH OF COOS BAY OR 97420 GEORGIA PACIFIC RD FED. AID NO. ACNH-ER19-D(300)4E BIG LAGOON SLIPOUT REPAIR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,760.0000 1,760.00 1.000 1,760 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 10,000.0000 10,000.00 0.124 1,240.00 0.574 5,740 003 TIME-RELATED OVERHEAD (LS) LS 10,000.0000 10,000.00 0.124 1,240.00 0.300 3,000 004 CONSTRUCTION AREA SIGNS LS 8,033.0000 8,033.00 0.049 393.62 0.515 4,137 005 TRAFFIC CONTROL SYSTEM LS 125,180.0400 125,180.04 0.124 15,522.32 0.300 37,554 006 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 10.1700 488.16 24.000 244 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.9700 1,477.50 255.000 502 008 CHANNELIZER (SURFACE MOUNTED) EA 44.4800 1,779.20 30.000 1,334 009 TEMPORARY SIGNAL SYSTEM LS 164,155.9600 164,155.96 0.012 1,969.87 0.712 116,879 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8,666.4300 17,332.86 0.500 4,333.22 1.500 12,999 011 TEMPORARY RAILING (TYPE K) LF 71.0700 105,183.60 1,440.000 102,340 012 TEMPORARY CRASH CUSHION SYSTEM EA 363.7400 6,183.58 5.000 1,818 013 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.124 1,240.00 0.300 3,000 014 PREPARE STORM WATER POLLUTION PREVENTION LS 2,541.7800 2,541.78 0.500 1,270 PLAN 015 RAIN EVENT ACTION PLAN EA 500.0000 26,000.00 0.000 0 016 STORM WATER SAMPLING AND ANALYSIS DAY EA 476.5900 52,424.90 0.000 0 017 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 018 MOVE-IN/MOVE-OUT EA 635.4500 2,541.80 0.000 0 (TEMPORARY EROSION CONTROL) 019 TEMPORARY COVER SQYD 1.7700 5,274.60 0.000 0 020 TEMPORARY CHECK DAM LF 8.9600 5,913.60 0.000 0 021 TEMPORARY DRAINAGE INLET PROTECTION EA 1,025.4400 2,050.88 0.000 0 022 TEMPORARY FIBER ROLL LF 3.8100 2,933.70 175.000 666 PROGRAM CAS145 PAGE 2 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0B4304 TIME 03:55 PM ESTIMATE NO. 003 BID OPENING 11/15/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: GORONA, MARK DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY GRAVEL BAG BERM LF 3.5200 880.00 0.000 0 024 TEMPORARY SILT FENCE LF 3.8100 2,743.20 745.000 2,838 025 TEMPORARY CONSTRUCTION ENTRANCE EA 2,050.8700 6,152.61 1.000 2,050 026 STREET SWEEPING LS 35,201.4200 35,201.42 0.000 0 027 TEMPORARY CONCRETE WASHOUT LS 6,041.9200 6,041.92 0.080 483.35 0.330 1,993 028 TEMPORARY FENCE (TYPE ESA) LF 12.9100 17,428.50 1,220.000 15,750 029 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.3500 5,193.50 1,774.000 4,168 STRIPE (HAZARDOUS WASTE) 030 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 40,997.9200 40,997.92 0.124 5,083.74 0.300 12,299 031 NATURAL RESOURCE PROTECTION PLAN LS 11,565.0600 11,565.06 0.060 693.90 0.650 7,517 032 DESTROY WELL EA 2,933.4500 26,401.05 8.000 23,467 033 REMOVE PAINTED TRAFFIC STRIPE LF 2.8000 308.00 0.000 0 034 REMOVE PAINTED PAVEMENT MARKING SQFT 25.4200 610.08 0.000 0 035 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.1600 3,348.00 0.000 0 036 REMOVE PAVEMENT MARKER EA 5.9400 582.12 120.000 712 037 REMOVE ASPHALT CONCRETE DIKE LF 0.5300 1,166.00 0.000 0 038 REMOVE CULVERT (LF) LF 314.0400 20,726.64 0.000 0 039 REMOVE PIPE (EA) EA 5,000.0000 5,000.00 0.000 0 040 REMOVE DOWNDRAIN (EA) EA 804.2500 804.25 0.000 0 041 RESET MILEPOST MARKER EA 41.0700 82.14 0.000 0 042 RESET ROADSIDE SIGN (ONE POST) EA 265.6000 265.60 0.000 0 043 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.9500 10,412.50 0.000 0 044 CLEARING AND GRUBBING (LS) LS 10,774.4900 10,774.49 0.850 9,158 045 DEVELOP WATER SUPPLY LS 9,973.7300 9,973.73 0.150 1,496.06 0.300 2,992 046 ROADWAY EXCAVATION CY 65.9100 85,683.00 31.000 2,043 047 SHOULDER BACKING TON 127.8100 7,029.55 0.000 0 048 STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 61.7700 42,621.30 414.000 25,572.78 578.000 35,703 (F) 049 STRUCTURE BACKFILL (SOLDIER PILE WALL) CY 584.2600 181,120.60 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0B4304 TIME 03:55 PM ESTIMATE NO. 003 BID OPENING 11/15/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: GORONA, MARK DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BACKFILL (SOLDIER PILE WALL) CY 328.5500 320,336.25 746.000 245,098.30 975.000 320,336 (F) 051 LEAN CONCRETE BACKFILL CY 328.5500 17,741.70 50.000 16,427 (F) 052 INVASIVE SPECIES REMOVAL LS 23,467.6100 23,467.61 0.500 11,733 053 CONTRACTOR SUPPLIED ARBORIST LS 7,244.0400 7,244.04 0.000 0 054 SOIL AMENDMENT (CF) CF 21.6000 388.80 0.000 0 055 ORGANIC FERTILIZER LB 381.2800 190.64 0.000 0 056 PLANT ESTABLISHMENT WORK LS 13,725.2700 13,725.27 0.000 0 057 WOOD MULCH CY 101.6800 19,319.20 0.000 0 058 DUFF (SQFT) SQFT 2.0500 4,817.50 0.000 0 059 ROLLED EROSION CONTROL PRODUCT SQFT 2.0500 54,940.00 0.000 0 (JUTE MESH) 060 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 1.1700 25,038.00 0.000 0 061 CLASS 2 AGGREGATE BASE (CY) CY 84.4800 60,149.76 0.000 0 062 HOT MIX ASPHALT (TYPE A) TON 158.4100 209,101.20 0.000 0 063 ASPHALT BINDER TON 2,175.0833 1,305.05 0.000 0 (GEOSYNTHETIC PAVEMENT INTERLAYER) 064 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 5.2800 2,376.00 0.000 0 (PAVING FABRIC) 065 CENTERLINE RUMBLE STRIP (SINUSOIDAL) STA 145.0000 2,755.00 0.000 0 066 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 10.6600 19,081.40 0.000 0 067 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 10.5600 4,329.60 0.000 0 068 TACK COAT TON 586.6917 704.03 0.000 0 069 GROUND ANCHOR (SUBHORIZONTAL) EA 5,526.6500 718,464.50 0.000 0 070 STEEL SOLDIER PILE (HP 14 X 73) LF 82.9300 59,709.60 720.000 59,709 071 STEEL SOLDIER PILE (W 14 X 90) LF 66.0900 341,222.67 4,550.000 300,709.50 5,350.000 353,581 072 30" DRILLED HOLE LF 97.3900 560,382.06 4,411.750 429,660.33 5,940.750 578,569 073 STRUCTURAL CONCRETE, BUTTRESS CY 502.6800 84,952.92 0.000 0 (F) 074 STRUCTURAL CONCRETE, BARRIER SLAB CY 1,602.6200 104,170.30 0.000 0 (F) 075 STRUCTURAL CONCRETE, WALER CY 2,121.9700 91,244.71 0.000 0 (F) 076 BAR REINFORCING STEEL (BUTTRESS) LB 1.1700 24,078.60 0.000 0 (F) PROGRAM CAS145 PAGE 4 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0B4304 TIME 03:55 PM ESTIMATE NO. 003 BID OPENING 11/15/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: GORONA, MARK DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 BAR REINFORCING STEEL (EPOXY COATED) LB 1.8900 23,001.30 0.000 0 (F) (WALER) 078 TIMBER LAGGING MFBM 4,651.1900 60,465.47 4.550 21,162.91 4.550 21,162 (F) 079 CLEAN AND PAINT STEEL SOLDIER PILING LS 27,414.8700 27,414.87 0.500 13,707 080 PREPARE AND STAIN CONCRETE SQFT 8.2100 11,617.15 0.000 0 081 24" CORRUGATED STEEL PIPE (.109" THICK) LF 346.8000 16,646.40 0.000 0 082 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 269.8800 39,402.48 0.000 0 083 6" NON-PERFORATED PLASTIC PIPE LF 64.5300 7,291.89 0.000 0 UNDERDRAIN 084 24" CORRUGATED STEEL PIPE DOWNDRAIN LF 134.9400 2,833.74 0.000 0 (.109" THICK) 085 24" ANCHOR ASSEMBLY EA 341.8600 683.72 0.000 0 086 ROCK SLOPE PROTECTION CY 160.0700 1,280.56 0.000 0 (LIGHT, METHOD B) (CY) 087 ROCK SLOPE PROTECTION CY 232.8783 535.62 0.000 0 (FACING, METHOD B) (CY) 088 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 8.4500 312.65 0.000 0 089 MARKER (CULVERT) EA 85.8500 257.55 0.000 0 090 OBJECT MARKER (TYPE P) EA 116.5500 233.10 0.000 0 091 CRASH CUSHION (TYPE TRACC) EA 2,933.4500 5,866.90 0.000 0 092 CALIFORNIA ST-10 BRIDGE RAIL (MODIFIED) LF 414.8600 49,368.34 0.000 0 (F) WITH BICYCLE RAILING 093 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5900 4,460.40 0.000 0 094 PAVEMENT MARKER EA 11.7300 1,876.80 0.000 0 (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 5 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0B4304 TIME 03:55 PM ESTIMATE NO. 003 BID OPENING 11/15/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: GORONA, MARK DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,055,899.90 1,789,172.35 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,055,899.90 1,789,172.35 095 MOBILIZATION LS 429,332.2600 429,332.26 0.200 85,866.45 0.950 407,865 ORIGINAL CONTRACT AMOUNT 4,554,485.95 TOTAL WORK COMPLETED 1,141,766.35 2,197,038.00 MATERIALS ON HAND ON SITE 19,435.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 1,131,766.35 2,206,473.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/30/17 170 03/27/17 03/27/17 02/14/19 51 51 0 0 47% 30% PROGRESS IS SATISFACTORY GORONA, MARK RESIDENT ENGINEER PROGRAM CAS145 DATE 08/23/17