PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/20 EST. NO. 005 TIME 11:53 AM R.E. NAME: NATHANIEL STEEN 01-0E0004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 3,211.21 E.W. @ F.A.(+) 070620 N 0002.0 002 0001 1,400.00 E.W. @ F.A.(+) 062320 N 0001.0 4,611.21 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 4,611.21 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/20 EST. NO. 005 TIME 11:53 AM R.E. NAME: NATHANIEL STEEN 01-0E0004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 LOCATION PROGRESS ESTIMATE 01-HUM-101-84.4/84.8 ----------------- GOLDEN STATE BRIDGE, INC. IN HUMBOLDT COUNTY NEAR ARCATA FROM 3701 MALLARD DRIVE; JACOBY CREEK BRIDGE TO GANNON BENICIA CA 94510 SLOUGH BRIDGE FED. AID NO. N O N E REPLACE JACOBY CREEK BRIDGE LT, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.800 3,200 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 10,000.0000 10,000.00 0.250 2,500.00 0.500 5,000 003 TIME-RELATED OVERHEAD (LS) LS 949,000.0000 949,000.00 0.148 140,452.00 0.232 220,168 004 CONSTRUCTION AREA SIGNS LS 6,600.0000 6,600.00 0.148 976.80 0.232 1,531 005 TRAFFIC CONTROL SYSTEM LS 175,000.0000 175,000.00 0.048 8,400.00 0.232 40,600 006 FLASHING ARROW SIGN EA 2,500.0000 5,000.00 1.000 2,500 007 TYPE III BARRICADE EA 90.0000 720.00 0.000 0 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 2.0000 18,420.00 5,208.000 10,416.00 8,430.000 16,860 009 CHANNELIZER (SURFACE MOUNTED) EA 55.0000 8,800.00 0.000 0 010 TEMPORARY PORTABLE RADAR FEEDBACK EA 5,000.0000 10,000.00 1.750 8,750 SIGN 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 24,750.0000 24,750.00 0.184 4,554 012 TEMPORARY RAILING (TYPE K) LF 28.0000 103,600.00 800.000 22,400 013 RELOCATE TEMPORARY RAILING (TYPE K) LF 18.0000 68,400.00 640.000 11,520.00 640.000 11,520 014 ALTERNATIVE TEMPORARY CRASH CUSHION EA 5,000.0000 25,000.00 3.000 15,000 SYSTEM 015 RELOCATE ALTERNATIVE TEMPORARY CRASH EA 3,000.0000 36,000.00 2.000 6,000.00 2.000 6,000 CUSHION SYSTEM 016 TEMPORARY TRAFFIC SCREEN LF 8.0000 6,240.00 0.000 0 017 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 0.184 4,600 018 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.500 1,500 PLAN 019 RAIN EVENT ACTION PLAN EA 500.0000 39,500.00 1.000 500 020 STORM WATER SAMPLING AND ANALYSIS DAY EA 550.0000 71,500.00 0.000 0 021 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 1.000 2,000.00 1.000 2,000 022 MOVE-IN/MOVE-OUT EA 1,000.0000 2,000.00 0.000 0 (TEMPORARY EROSION CONTROL) PROGRAM CAS145 PAGE 2 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY HYDRAULIC MULCH SQYD 1.3500 10,314.00 0.000 0 (BONDED FIBER MATRIX) 024 TEMPORARY FIBER ROLL LF 4.5000 10,170.00 2,406.000 10,827 025 STREET SWEEPING LS 12,000.0000 12,000.00 0.184 2,208 026 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.100 500 027 ASBESTOS COMPLIANCE PLAN LS 8,000.0000 8,000.00 1.000 8,000 028 TREATED WOOD WASTE LB 0.1500 3,105.00 0.000 0 029 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 030 NATURAL RESOURCE PROTECTION PLAN LS 6,500.0000 6,500.00 1.000 6,500 031 INVASIVE SPECIES CONTROL LS 4,000.0000 4,000.00 1.000 4,000 032 BAT EXCLUSION LS 12,500.0000 12,500.00 0.250 3,125 033 CONTRACTOR SUPPLIED HYDROACOUSTIC LS 25,000.0000 25,000.00 0.350 8,750 MONITOR 034 TEMPORARY HIGH-VISIBILITY FENCE LF 8.0000 27,600.00 3,197.000 25,576 035 ROADWAY EXCAVATION CY 50.0000 123,000.00 0.000 0 036 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 037 STRUCTURE EXCAVATION (TYPE A) CY 549.0000 211,914.00 96.500 52,978.50 193.000 105,957 (F) 038 STRUCTURE EXCAVATION (TYPE Z-2) CY 359.0000 7,898.00 23.850 8,562 (AERIALLY DEPOSITED LEAD) 039 STRUCTURE BACKFILL (BRIDGE) CY 175.0000 16,275.00 0.000 0 (F) 040 IMPORTED BORROW (CY) CY 90.0000 249,300.00 2,770.000 249,300 041 SOIL AMENDMENT CY 800.0000 240.00 0.000 0 042 PACKET FERTILIZER EA 2.0000 48.00 0.000 0 043 SLOW-RELEASE FERTILIZER LB 300.0000 240.00 0.000 0 044 PLANT (GROUP U) EA 340.0000 4,080.00 0.000 0 045 PLANT ESTABLISHMENT WORK LS 16,500.0000 16,500.00 0.000 0 046 WOOD MULCH CY 700.0000 420.00 0.000 0 047 FIBER REINFORCED MATRIX SQFT 0.2600 10,816.00 0.000 0 048 CLASS 2 AGGREGATE BASE (CY) CY 95.0000 214,700.00 75.000 7,125 049 REPLACE ASPHALT CONCRETE SURFACING CY 3,000.0000 21,000.00 7.000 21,000 PROGRAM CAS145 PAGE 3 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 HOT MIX ASPHALT (TYPE A) TON 205.0000 358,750.00 0.000 0 051 HOT MIX ASPHALT (LEVELING) TON 205.0000 147,600.00 0.000 0 052 HOT MIX ASPHALT-OPEN GRADED TON 310.0000 74,400.00 0.000 0 (OPEN GRADED FRICTION COURSE) 053 HOT MIX ASPHALT-OPEN GRADED TON 1,000.0000 85,000.00 0.000 0 (COLORIZED OGFC) 054 TACK COAT TON 1,000.0000 2,400.00 0.000 0 055 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 25.0000 25,750.00 0.000 0 056 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 057 FURNISH 36" CAST-IN-STEEL SHELL LF 335.0000 608,360.00 1,846.000 618,410 CONCRETE PILING 058 DRIVE 36" CAST-IN-STEEL SHELL CONCRETE EA 17,500.0000 420,000.00 6.000 105,000.00 12.000 210,000 PILE 059 PRESTRESSING STEEL (TRANSVERSE LS 25,000.0000 25,000.00 0.000 0 TIE ROD) 060 SEAL COURSE CONCRETE CY 800.0000 94,400.00 79.930 63,944.00 79.930 63,944 061 STRUCTURAL CONCRETE, BRIDGE CY 2,300.0000 531,300.00 45.720 105,156.00 45.720 105,156 (F) 062 STRUCTURAL CONCRETE, BRIDGE CY 1,800.0000 124,200.00 0.000 0 (F) (POLYMER FIBER) 063 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 3,000.0000 279,000.00 46.500 139,500.00 46.500 139,500 (F) 064 STRUCTURAL CONCRETE, BRIDGE (RSC) CF 125.0000 10,875.00 0.000 0 PATCH 065 STRUCTURAL CONCRETE, BARRIER SLAB CY 2,500.0000 187,500.00 37.500 93,750.00 37.500 93,750 (F) (RSC) 066 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,650.0000 186,450.00 0.000 0 (F) (TYPE N MODIFIED) 067 DRILL AND BOND DOWEL LF 65.0000 91,260.00 404.250 26,276.25 669.580 43,522 068 FURNISH PRECAST PRESTRESSED CONCRETE BOX EA 35,000.0000 315,000.00 8.000 280,000 GIRDER (70'-80') 069 ERECT PRECAST PRESTRESSED CONCRETE BOX EA 11,000.0000 99,000.00 0.000 0 GIRDER 070 JOINT SEAL (MR 1/2") LF 55.0000 9,185.00 0.000 0 071 JOINT SEAL (MR 1 1/2") LF 65.0000 5,720.00 0.000 0 072 BAR REINFORCING STEEL (BRIDGE) LB 1.7500 134,925.00 38,550.000 67,462.50 38,550.000 67,462 (F) 073 BAR REINFORCING STEEL (EPOXY COATED) LB 2.5000 231,525.00 7,940.000 19,850.00 19,940.000 49,850 (F) (BRIDGE) 074 STRUCTURAL STEEL (BRIDGE) LB 25.0000 15,200.00 304.000 7,600.00 304.000 7,600 (F) 075 REMOVE ASPHALT CONCRETE SURFACING SQFT 3.0000 20,649.00 2,745.170 8,235.51 3,349.500 10,048 076 REMOVE UNSOUND CONCRETE CF 90.0000 7,830.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.6500 4,473.95 3,349.500 2,177.18 3,349.500 2,177 078 BRIDGE REMOVAL LS 110,000.0000 110,000.00 0.000 0 079 BRIDGE SUPERSTRUCTURE MOVE LS 75,000.0000 75,000.00 0.000 0 080 BRIDGE REMOVAL (PORTION), LOCATION A LS 18,000.0000 18,000.00 0.500 9,000 081 BRIDGE REMOVAL (PORTION), LOCATION B LS 18,000.0000 18,000.00 0.500 9,000 082 PLUG DECK DRAIN EA 300.0000 900.00 5.000 1,500.00 5.000 1,500 083 OBLITERATE SURFACING SQYD 3.0000 8,190.00 0.000 0 084 REMOVE PAVEMENT MARKER EA 1.5000 126.00 64.000 96 085 PAVEMENT MARKER (RETROREFLECTIVE) EA 21.0000 2,520.00 0.000 0 086 MILEPOST MARKER EA 60.0000 120.00 0.000 0 087 OBJECT MARKER (TYPE P) EA 65.0000 390.00 0.000 0 088 MIDWEST GUARDRAIL SYSTEM LF 32.0000 32,000.00 300.000 9,600.00 300.000 9,600 089 TRANSITION RAILING (TYPE WB-31) EA 3,700.0000 25,900.00 2.000 7,400.00 2.000 7,400 090 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,450.0000 20,700.00 2.000 6,900.00 2.000 6,900 091 CALIFORNIA ST-70 BRIDGE RAIL LF 265.0000 154,230.00 186.000 49,290.00 186.000 49,290 (F) 092 REMOVE GUARDRAIL LF 5.0000 4,000.00 247.000 1,235 093 THERMOPLASTIC TRAFFIC STRIPE LF 2.2500 13,477.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 094 REMOVE PAINTED TRAFFIC STRIPE LF 1.0000 6,450.00 4,200.000 4,200.00 4,200.000 4,200 095 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 8,300.00 978.000 1,956.00 4,200.000 8,400 096 6" RUMBLE STRIP STA 150.0000 2,550.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 097 12" RUMBLE STRIP STA 150.0000 2,550.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 098 4" CONDUIT (BRIDGE) LS 13,000.0000 13,000.00 0.000 0 099 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 100 SHOULDER BACKING TON 100.0000 26,000.00 0.000 0 101 PRECAST CONCRETE BAT HOUSE EA 4,500.0000 27,000.00 0.000 0 102 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 103 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 90,000.0000 90,000.00 0.100 9,000 PROGRAM CAS145 PAGE 5 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 105 CLEARING AND GRUBBING (LS) LS 75,000.0000 75,000.00 1.000 75,000.00 1.000 75,000 PROGRAM CAS145 PAGE 6 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E0004 TIME 11:53 AM ESTIMATE NO. 005 BID OPENING 01/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NATHANIEL STEEN DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,030,040.74 2,710,155.23 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 4,611.21 4,611.21 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,034,651.95 2,714,766.44 106 MOBILIZATION LS 784,000.0000 784,000.00 0.950 744,800 ORIGINAL CONTRACT AMOUNT 8,213,306.45 TOTAL WORK COMPLETED 1,034,651.95 3,459,566.44 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,034,651.95 3,459,566.44 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/13/20 155 07/01/20 04/09/20 02/17/21 32 69 0 0 42% 21% PROGRESS IS SATISFACTORY NATHANIEL STEEN RESIDENT ENGINEER PROGRAM CAS145 DATE 08/21/20