PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/27/21 EST. NO. 010 TIME 10:37 AM R.E. NAME: JOAQUIN RODRIGUEZ 01-0E7704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/27/21 EST. NO. 010 TIME 10:37 AM R.E. NAME: JOAQUIN RODRIGUEZ 01-0E7704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/27/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E7704 TIME 10:37 AM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/21 R.E. NAME: JOAQUIN RODRIGUEZ DATE OF THIS ESTIMATE 07/27/21 LOCATION PROGRESS ESTIMATE 01-HUM-101-R17.9/87.8 ----------------- FREYSSINET INC IN HUMBOLDT COUNTY AT SOUTH FORK 44880 FALCON PLACE, SUITE 100 EEL RIVER BR & SEP #04-0065 & AT STERLING VA 20166 ARCATA OVERHEAD #040-0079R FED. AID NO. ACNH-Q101(360)E STRENGTHEN 2 BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,670.0000 1,670.00 0.750 1,252 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,590.0000 5,590.00 0.060 335.40 0.730 4,080 003 TIME-RELATED OVERHEAD (WDAY) WDAY 4,900.0000 1,396,500.00 21.000 102,900.00 206.000 1,009,400 004 CONSTRUCTION AREA SIGNS LS 18,800.0000 18,800.00 0.025 470.00 0.803 15,096 005 TRAFFIC CONTROL SYSTEM LS 65,000.0000 65,000.00 0.100 6,500.00 1.000 65,000 006 FLASHING ARROW SIGN EA 5,470.0000 21,880.00 3.000 16,410 007 TEMPORARY TRAFFIC STRIPE (TAPE) LF 2.5000 16,500.00 2,550.000 6,375 008 CHANNELIZER (SURFACE MOUNTED) EA 27.5000 8,800.00 345.000 9,487 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 29,900.0000 29,900.00 0.900 26,910 010 TEMPORARY RAILING (TYPE K) LF 81.0000 89,100.00 1,000.000 81,000 011 ALTERNATIVE TEMPORARY CRASH CUSHION EA 19,400.0000 38,800.00 1.000 19,400 012 JOB SITE MANAGEMENT LS 25,500.0000 25,500.00 0.050 1,275.00 0.675 17,212 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,160.0000 1,160.00 0.750 870 014 MOVE-IN/MOVE-OUT EA 3,210.0000 6,420.00 1.000 3,210 (TEMPORARY EROSION CONTROL) 015 TEMPORARY CONCRETE WASHOUT LS 6,420.0000 6,420.00 0.300 1,926 016 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.7000 19,116.00 5,168.000 13,953 STRIPE (HAZARDOUS WASTE) 017 WORK AREA MONITORING (BRIDGE) LS 123,000.0000 123,000.00 0.150 18,450 018 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) DAY 1,140.0000 114,000.00 10.000 11,400.00 80.000 91,200 019 BAT EXCLUSION DEVICES LS 9,530.0000 9,530.00 1.000 9,530 020 INVASIVE SPECIES CONTROL LS 14,400.0000 14,400.00 0.500 7,200 021 BIRD EXCLUSION DEVICES LS 20,600.0000 20,600.00 0.050 1,030.00 0.950 19,570 022 CLEARING AND GRUBBING (LS) LS 2,440.0000 2,440.00 1.000 2,440 PROGRAM CAS145 PAGE 2 DATE 07/27/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E7704 TIME 10:37 AM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/21 R.E. NAME: JOAQUIN RODRIGUEZ DATE OF THIS ESTIMATE 07/27/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FIBER REINFORCED MATRIX SQFT 0.6000 5,820.00 0.000 0 024 TEMPORARY SUPPORT LS 172,000.0000 172,000.00 0.050 8,600 025 STRUCTURAL CONCRETE (RSC) CY 4,200.0000 134,400.00 5.000 21,000.00 11.600 48,720 (F) 026 STRUCTURAL CONCRETE, BRIDGE CY 987.0000 72,051.00 5.000 4,935.00 5.000 4,935 (F) 027 DRILL AND BOND DOWEL LF 100.0000 16,000.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 028 ELASTOMERIC BEARING PAD EA 545.0000 16,350.00 0.000 0 029 PTFE SPHERICAL BEARING EA 21,300.0000 213,000.00 0.000 0 030 BAR REINFORCING STEEL (BRIDGE) LB 3.0000 53,700.00 1,000.000 3,000.00 1,000.000 3,000 (F) 031 STRUCTURAL STEEL (BRIDGE) LB 9.3000 3,287,271.00 5,340.000 49,662.00 12,120.000 112,716 (F) 032 CLEAN AND PAINT STRUCTURAL STEEL LS 106,000.0000 106,000.00 0.025 2,650 033 CLEAN AND PAINT STRUCTURAL STEEL LS 176,000.0000 176,000.00 0.060 10,560.00 0.135 23,760 (EXISTING BRIDGE) 034 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 20.0000 88,400.00 137.000 2,740.00 274.000 5,480 035 CORE CONCRETE (10") LF 257.0000 12,850.00 0.000 0 036 BRIDGE REMOVAL (PORTION), LOCATION A LS 142,000.0000 142,000.00 0.065 9,230.00 0.280 39,760 037 BRIDGE REMOVAL (PORTION), LOCATION B LS 7,180.0000 7,180.00 0.000 0 038 MISCELLANEOUS METAL LB 20.5000 123,000.00 0.000 0 (F) (RESTRAINER - CABLE TYPE) 039 PRESTRESSING STEEL GIRDERS LS 1,087,000.0000 1,087,000.00 0.100 108,700 040 MISCELLANEOUS METAL (BRIDGE) LB 9.9000 219,334.50 0.000 0 (F) 041 REMOVE PAVEMENT MARKER EA 2.6000 728.00 240.000 624 042 PAVEMENT MARKER (RETROREFLECTIVE) EA 14.0000 3,920.00 0.000 0 043 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 8,610.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 044 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 18,648.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 045 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.9000 10,621.00 5,000.000 9,500 046 CONTRAST STRIPE PAINT (1-COAT) LF 0.7000 2,520.00 0.000 0 047 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 048 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/27/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E7704 TIME 10:37 AM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/21 R.E. NAME: JOAQUIN RODRIGUEZ DATE OF THIS ESTIMATE 07/27/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 050 BAT ROOST LS 37,700.0000 37,700.00 1.000 37,700 051 PORTABLE RADAR SPEED FEEDBACK SIGN LS 72,700.0000 72,700.00 0.900 65,430 SYSTEMS PROGRAM CAS145 PAGE 4 DATE 07/27/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E7704 TIME 10:37 AM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/21 R.E. NAME: JOAQUIN RODRIGUEZ DATE OF THIS ESTIMATE 07/27/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 225,037.40 1,911,549.20 ADJUSTMENT OF COMPENSATION 0.00 54,850.08 EXTRA WORK 0.00 4,414.67 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 225,037.40 1,970,813.95 052 MOBILIZATION LS 900,000.0000 900,000.00 0.950 855,000 ORIGINAL CONTRACT AMOUNT 9,022,929.50 TOTAL WORK COMPLETED 225,037.40 2,825,813.95 MATERIALS ON HAND ON SITE 375,372.57 DEDUCTIONS 0.00 0.00 TOTAL 225,037.40 3,201,186.52 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/19/20 365 04/14/20 04/14/20 01/21/22 163 154 5 0 31% 44% PROGRESS IS SATISFACTORY JOAQUIN RODRIGUEZ RESIDENT ENGINEER PROGRAM CAS145 DATE 07/27/21