PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/22 EST. NO. 007 TIME 03:09 PM R.E. NAME: STEVE TISELL 01-0E83U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 86,948.29 E.W. @ L.S.(+) 100522 N 1 0 86,948.29 TOTAL THIS ESTIMATE 120,997.28 TOTAL PREVIOUS ESTIMATE 207,945.57 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/22 EST. NO. 007 TIME 03:09 PM R.E. NAME: STEVE TISELL 01-0E83U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR 4/22 DEDUCT -9,000.00 002 PER 5/22 LTR DEDUCT -7,000.00 003 RELEASE 4/22 DEDUCT 9,000.00 003 RELEASE 5/22 DEDUCT 7,000.00 004 PER 7/22 LTR DEDUCT -2,000.00 005 PER LTR 9/22 DEDUCT -2,000.00 006 RELEASE 7/22 DEDUCT 2,000.00 006 0.00 -2,000.00 OVERBID ITEMS OVERBID ITEM NO. 064 -2,330.81 001 OVERBID ITEM NO. 064 -621.55 002 OVERBID ITEM NO. 064 -155.39 004 0.00 -3,107.75 TOTAL DEDUCTIONS 0.00 -5,107.75 PROGRAM CAS145 PAGE 1 DATE 10/21/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E83U4 TIME 03:09 PM ESTIMATE NO. 007 BID OPENING 09/08/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/22 R.E. NAME: STEVE TISELL DATE OF THIS ESTIMATE 10/21/22 LOCATION PROGRESS ESTIMATE 01-LAK-20 ----------------- WEST COAST CONTRACTORS IN LAKE AND MENDOCINO COUNTIES ON 61050 HIGHWAY 101; VARIOUS ROUTES AND AT VARIOUS COOS BAY OR 97420 LOCATIONS FED. AID NO. N O N E TRANSPORTATION MANAGEMENT SYSTEMS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,919.0000 1,919.00 1.000 1,919 002 TIME-RELATED OVERHEAD (LS) LS 25,000.0000 25,000.00 0.050 1,250.00 1.000 25,000 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 17,400.0000 17,400.00 0.050 870.00 1.000 17,400 006 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.050 7,500.00 1.000 150,000 007 PORTABLE RADAR SPEED FEEDBACK LS 14,396.0000 14,396.00 0.050 719.80 1.000 14,396 SIGN SYSTEM 008 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 1,413.0000 1,413.00 0.050 70.65 1.000 1,413 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 36,097.0000 36,097.00 0.050 1,804.85 1.000 36,097 010 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.050 2,500.00 1.000 50,000 011 PREPARE STORM WATER POLLUTION PREVENTION LS 1,650.0000 1,650.00 1.000 1,650 PLAN 012 RAIN EVENT ACTION PLAN EA 500.0000 9,000.00 6.000 3,000 013 STORM WATER SAMPLING AND ANALYSIS DAY EA 160.0000 5,120.00 0.000 0 014 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 015 MOVE-IN/MOVE-OUT EA 200.0000 1,800.00 8.000 1,600.00 9.000 1,800 (TEMPORARY EROSION CONTROL) 016 TEMPORARY HYDRAULIC MULCH SQYD 3.5000 7,455.00 2,130.000 7,455 (BONDED FIBER MATRIX) 017 TEMPORARY COVER SQYD 1.0000 2,130.00 2,130.000 2,130 018 TEMPORARY CHECK DAM LF 20.0000 900.00 40.000 800.00 40.000 800 019 TEMPORARY FIBER ROLL LF 4.5000 2,025.00 450.000 2,025 020 TEMPORARY CONSTRUCTION ENTRANCE EA 2,052.6000 18,473.40 9.000 18,473 021 STREET SWEEPING LS 7,677.9100 7,677.91 1.000 7,677 022 TEMPORARY CONCRETE WASHOUT LS 7,518.0000 7,518.00 1.000 7,518 PROGRAM CAS145 PAGE 2 DATE 10/21/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E83U4 TIME 03:09 PM ESTIMATE NO. 007 BID OPENING 09/08/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/22 R.E. NAME: STEVE TISELL DATE OF THIS ESTIMATE 10/21/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 500.0000 4,500.00 0.000 0 024 WATER QUALITY MONITORING REPORT EA 400.0000 400.00 0.000 0 025 WATER QUALITY ANNUAL REPORT EA 3,200.0000 3,200.00 0.000 0 026 TREATED WOOD WASTE LB 5.0000 2,000.00 400.000 2,000 027 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 19,944.0000 19,944.00 1.000 19,944 028 TEMPORARY HIGH-VISIBILITY FENCE LF 14.0000 1,120.00 80.000 1,120 029 CLEARING AND GRUBBING (LS) LS 28,855.0000 28,855.00 1.000 28,855 030 ROADWAY EXCAVATION CY 175.0000 73,500.00 0.100 17.50 420.000 73,500 031 STRUCTURE EXCAVATION (RETAINING WALL) CY 112.0000 105,504.00 942.000 105,504 (F) 032 STRUCTURE BACKFILL (RETAINING WALL) CY 125.0000 112,000.00 896.000 112,000 (F) 033 PERVIOUS BACKFILL MATERIAL (RETAINING CY 325.0000 20,475.00 63.000 20,475 (F) WALL) 034 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.9000 5,400.00 6,000.000 5,400 035 HYDROMULCH SQFT 0.5000 8,350.00 16,700.000 8,350 036 FIBER ROLLS LF 4.5000 9,315.00 2,070.000 9,315 037 COMPOST (CY) CY 175.0000 9,625.00 55.000 9,625 038 CLASS 2 AGGREGATE BASE (CY) CY 200.0000 48,000.00 240.000 48,000 039 HOT MIX ASPHALT (TYPE A) TON 795.0000 214,650.00 270.000 214,650 040 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 142.7500 58,527.50 372.000 53,103 (PAVING FABRIC) 041 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 42.3500 3,599.75 85.000 3,599 042 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 42.3500 3,599.75 85.000 3,599 043 TACK COAT TON 1.0000 0.40 0.000 0 044 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 30.0000 12,300.00 409.800 12,294 045 30" CAST-IN-DRILLED-HOLE CONCRETE LF 365.6300 23,400.32 64.000 23,400 PILE (SIGN FOUNDATION) 046 48" CAST-IN-DRILLED-HOLE CONCRETE LF 843.7800 45,564.12 54.000 45,564 PILE (SIGN FOUNDATION) 047 60" CAST-IN-DRILLED-HOLE CONCRETE LF 695.6500 47,999.85 69.000 47,999 PILE (SIGN FOUNDATION) 048 STRUCTURAL CONCRETE, RETAINING WALL CY 1,099.9700 237,593.52 205.200 225,713 (F) 049 BAR REINFORCING STEEL (RETAINING WALL) LB 3.0000 91,500.00 30,500.000 91,500 (F) PROGRAM CAS145 PAGE 3 DATE 10/21/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E83U4 TIME 03:09 PM ESTIMATE NO. 007 BID OPENING 09/08/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/22 R.E. NAME: STEVE TISELL DATE OF THIS ESTIMATE 10/21/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 FURNISH SIGN STRUCTURE (TRUSS) LB 10.0000 737,000.00 73,700.000 737,000 (F) 051 INSTALL SIGN STRUCTURE (TRUSS) LB 1.0000 73,700.00 73,700.000 73,700 (F) 052 8" PERFORATED STEEL PIPE UNDERDRAIN LF 40.0000 5,200.00 130.000 5,200 (.079" THICK) 053 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 70.0000 13,300.00 150.000 10,500.00 190.000 13,300 054 VEGETATION CONTROL (MINOR CONCRETE) SQYD 200.0000 4,400.00 22.000 4,400.00 22.000 4,400 055 CABLE RAILING LF 55.0000 7,150.00 130.000 7,150 (F) 056 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,500.0000 3,000.00 1.000 1,500.00 2.000 3,000 057 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,500.0000 5,500.00 1.000 5,500.00 1.000 5,500 058 REMOVE GUARDRAIL LF 15.0000 600.00 40.000 600 059 6" THERMOPLASTIC TRAFFIC STRIPE LF 10.0000 1,900.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 060 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,000.0000 10,000.00 0.140 1,400.00 1.000 10,000 SYSTEM ELEMENTS DURING CONSTRUCTION 061 TRAFFIC MONITORING STATION SYSTEM LS 157,390.0000 157,390.00 0.050 7,869.50 1.000 157,390 062 CHANGEABLE MESSAGE SIGN SYSTEM LS 312,350.0000 312,350.00 0.090 28,111.50 0.900 281,115 063 MODIFYING CHANGEABLE MESSAGE LS 22,535.0000 22,535.00 0.630 14,197.05 0.900 20,281 SIGN SYSTEMS PROGRAM CAS145 PAGE 4 DATE 10/21/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E83U4 TIME 03:09 PM ESTIMATE NO. 007 BID OPENING 09/08/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/22 R.E. NAME: STEVE TISELL DATE OF THIS ESTIMATE 10/21/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 90,610.85 2,832,903.44 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 86,948.29 207,945.57 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 177,559.14 3,040,849.01 064 MOBILIZATION LS 328,000.0000 328,000.00 1.000 328,000 ORIGINAL CONTRACT AMOUNT 3,248,922.52 TOTAL WORK COMPLETED 177,559.14 3,368,849.01 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -5,107.75 TOTAL 177,559.14 3,363,741.26 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 064 MOBILIZATION 324,892.25 328,000.00 3,107.75 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/02/21 100 02/14/22 12/20/21 10/24/22 96 114 0 0 97% 96% PROGRESS IS SATISFACTORY STEVE TISELL RESIDENT ENGINEER