PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/23/18 EST. NO. 003 TIME 11:58 AM R.E. NAME: KING, ROBERT 01-0E8404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 79,000.00 E.W. @ L.S.(+) 051718 N 001 0 79,000.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 79,000.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/23/18 EST. NO. 003 TIME 11:58 AM R.E. NAME: KING, ROBERT 01-0E8404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E8404 TIME 11:58 AM ESTIMATE NO. 003 BID OPENING 10/17/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: KING, ROBERT DATE OF THIS ESTIMATE 05/23/18 LOCATION PROGRESS ESTIMATE 01-HUM-283-0.1/0.1 ----------------- MURPHY IHDUSTRIAL COATINGS, IN HUMBOLDT COUNTY IN AND NEAR INC. SCOTIA AND RIO DELL AT EEL RIVER OH 2704 GUNDRY AVE. 4-15 SIGNAL HILL CA 90755 FED. AID NO. ACST-P283(3)E CLEAN & PAINT BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,500.0000 2,500.00 0.148 370.00 0.325 812 003 CONSTRUCTION AREA SIGNS LS 8,200.0000 8,200.00 0.030 246.00 0.765 6,273 004 TRAFFIC CONTROL SYSTEM LS 34,000.0000 34,000.00 0.133 4,522.00 0.293 9,962 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 0.133 665.00 0.293 1,465 006 JOB SITE MANAGEMENT LS 10,125.0000 10,125.00 0.067 678.38 0.325 3,290 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 750.0000 750.00 0.037 27.75 0.831 623 008 TEMPORARY MULCH SQYD 1.2500 425.00 0.000 0 009 WORK AREA MONITORING (BRIDGE) LS 1.2500 1.25 0.000 0 010 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 50,620.0000 50,620.00 0.096 4,859.52 0.462 23,386 011 BAT EXCLUSION DEVICES LS 6,200.0000 6,200.00 0.000 0 012 BIRD EXCLUSION DEVICES LS 5,700.0000 5,700.00 0.750 4,275.00 0.750 4,275 013 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 941,100.0000 941,100.00 0.232 218,335.20 0.500 470,550 (BRUSH-OFF BLAST) 014 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 470,550.0000 470,550.00 0.132 62,112.60 0.400 188,220 015 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 15.0000 76,800.00 663.000 9,945.00 663.000 9,945 016 CLEAN AND PAINT LUMINAIRES (EXISTING) LS 10,000.0000 10,000.00 0.000 0 017 CLEAN AND PAINT BRIDGE RAILING LS 470,550.0000 470,550.00 0.000 0 (EXISTING) 018 REMOVE ASPHALT CONCRETE SURFACING SQFT 25.0000 6,950.00 0.000 0 019 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.4000 12,477.60 0.000 0 020 TREAT BRIDGE DECK SQFT 0.9500 29,634.30 0.000 0 (F) 021 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 90.0000 31,230.00 0.000 0 022 REMOVE PAVEMENT MARKER EA 5.0000 550.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E8404 TIME 11:58 AM ESTIMATE NO. 003 BID OPENING 10/17/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: KING, ROBERT DATE OF THIS ESTIMATE 05/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 18.0000 1,980.00 0.000 0 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.2000 10,538.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 10,059.00 0.000 0 026 TRAFFIC MONITORING STATION SYSTEM LS 48,000.0000 48,000.00 0.000 0 027 MODIFYING EXISTING ELECTRICAL SYSTEM LS 33,000.0000 33,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0E8404 TIME 11:58 AM ESTIMATE NO. 003 BID OPENING 10/17/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: KING, ROBERT DATE OF THIS ESTIMATE 05/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 306,036.45 723,802.82 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 79,000.00 79,000.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 385,036.45 802,802.82 028 MOBILIZATION LS 125,629.8700 125,629.87 0.200 25,125.97 0.950 119,348 ORIGINAL CONTRACT AMOUNT 2,407,570.02 TOTAL WORK COMPLETED 410,162.42 922,151.20 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 410,162.42 922,151.20 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/28/17 135 01/23/18 01/23/18 10/01/18 42 40 -20 0 36% 37% PROGRESS IS SATISFACTORY KING, ROBERT RESIDENT ENGINEER PROGRAM CAS145 DATE 05/23/18