PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/23/18 EST. NO. 001 TIME 12:50 PM R.E. NAME: RASHID, AMAL 01-0G3504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/23/18 EST. NO. 001 TIME 12:50 PM R.E. NAME: RASHID, AMAL 01-0G3504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0G3504 TIME 12:50 PM ESTIMATE NO. 001 BID OPENING 02/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: RASHID, AMAL DATE OF THIS ESTIMATE 05/23/18 LOCATION PROGRESS ESTIMATE 01-HUM-101-68.2/93.0 ----------------- MYERS AND SONS CONSTRUCTION, IN HUMBOLDT COUNTY ON ROUTE 101 AT LP VARIOUS LOCATIONS 4600 NORTHGATE BLVD SUITE 100 SACRAMENTO CA 95834 FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY & ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,350.0000 1,350.00 0.250 337.50 0.250 337 002 CONSTRUCTION AREA SIGNS LS 9,600.0000 9,600.00 0.500 4,800.00 0.500 4,800 003 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.000 0 004 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 5,000.0000 5,000.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 14,000.0000 14,000.00 0.000 0 006 JOB SITE MANAGEMENT LS 6,000.0000 6,000.00 0.000 0 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 5.0000 21,500.00 0.000 0 STRIPE (HAZARDOUS WASTE) 009 HOT MIX ASPHALT (TYPE A) TON 310.5000 223,560.00 0.000 0 010 TACK COAT TON 700.0000 2,380.00 0.000 0 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 9.4000 46,342.00 0.000 0 012 CLEAN EXPANSION JOINT LF 12.0000 5,484.00 0.000 0 013 JOINT SEAL (MR 1/2") LF 22.0000 7,832.00 0.000 0 014 JOINT SEAL (MR 1") LF 60.0000 6,060.00 0.000 0 015 PUBLIC SAFETY PLAN LS 6,200.0000 6,200.00 0.000 0 016 RAPID SETTING CONCRETE (PATCH) CF 95.0000 20,710.00 0.000 0 017 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.7500 29,030.75 0.000 0 018 REMOVE UNSOUND CONCRETE CF 65.0000 14,170.00 0.000 0 019 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.8000 84,073.60 0.000 0 020 FURNISH POLYESTER CONCRETE OVERLAY CF 86.0000 753,360.00 0.000 0 021 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 262,779.00 0.000 0 (F) 022 TREAT BRIDGE DECK SQFT 0.6000 10,499.40 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0G3504 TIME 12:50 PM ESTIMATE NO. 001 BID OPENING 02/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: RASHID, AMAL DATE OF THIS ESTIMATE 05/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 83.0000 16,185.00 0.000 0 024 REMOVE PAVEMENT MARKER EA 6.0000 1,080.00 0.000 0 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 30.0000 5,400.00 0.000 0 026 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 13,660.00 0.000 0 027 8" THERMOPLASTIC TRAFFIC STRIPE LF 40.0000 2,200.00 0.000 0 028 6" THERMOPLASTIC TRAFFIC STRIPE LF 50.0000 2,000.00 0.000 0 (BROKEN 8-4) 029 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.5000 9,905.00 0.000 0 (BROKEN 36-12) 030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.5000 16,030.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0G3504 TIME 12:50 PM ESTIMATE NO. 001 BID OPENING 02/08/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: RASHID, AMAL DATE OF THIS ESTIMATE 05/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 5,137.50 5,137.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,137.50 5,137.50 031 MOBILIZATION LS 143,000.0000 143,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 1,830,390.75 TOTAL WORK COMPLETED 5,137.50 5,137.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 5,137.50 5,137.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/29/18 53 04/16/18 04/16/18 08/01/18 2 23 0 0 0% 4% PROGRESS IS SATISFACTORY RASHID, AMAL RESIDENT ENGINEER PROGRAM CAS145 DATE 05/23/18