PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/25 EST. NO. 013 TIME 01:31 PM R.E. NAME: MOSALLAI, MOJTABA 01-0H5904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0003 2,129.24 E.W. @ F.A.(+) 110424 N 0036.0 0004 13,807.93 110524 N 0037.0 0005 2,036.02 110624 N 0038.0 17,973.19 TOTAL THIS ESTIMATE 139,237.56 TOTAL PREVIOUS ESTIMATE 157,210.75 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/25 EST. NO. 013 TIME 01:31 PM R.E. NAME: MOSALLAI, MOJTABA 01-0H5904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM-2410 PER FAILURE -1,191,608.16 004 RELEASE CEM-2410 1,191,608.16 005 FHWA 1391 WITHHOLD -10,000.00 008 RTN FHWA 1391 10,000.00 009 0.00 0.00 LABOR COMPLIANCE VIOLATION PER 11/23 LTR DEDUCT -10,000.00 002 PER 12/23 LTR DEDUCT -1,000.00 002 PER 1/24 LTR DEDUCT -2,000.00 003 PER 2/24 LTR DEDUCT -4,000.00 003 RELEASE 12/23 DEDUCT 1,000.00 003 PER 5/24 LTR DEDUCT -1,000.00 004 DEDUCT LTTR 6/24 -2,000.00 006 RTN PER 11/23 LTR 10,000.00 006 RTN PER 1/24 LTR 2,000.00 006 PER 7/24 LTR DEDUCT -4,000.00 007 PER 8/24 LTR DEDUCT -10,000.00 008 RTN PER 2/24 LTR 4,000.00 009 PER 10/24 LTR DEDUCT -10,000.00 010 RELEASE 5/24 DEDUCT 1,000.00 010 RELEASE 6/24 DEDUCT 2,000.00 010 RELEASE 7/24 DEDUCT 4,000.00 010 PER 1/25 LTR DEDUCT -5,000.00 013 -5,000.00 -25,000.00 TOTAL DEDUCTIONS -5,000.00 -25,000.00 PROGRAM CAS145 PAGE 1 DATE 01/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H5904 TIME 01:31 PM ESTIMATE NO. 013 BID OPENING 06/29/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/25 R.E. NAME: MOSALLAI, MOJTABA DATE OF THIS ESTIMATE 01/24/25 LOCATION PROGRESS ESTIMATE 01-MEN-1-87.8/105.6 ----------------- GRANITE CONSTRUCTION COMPANY MENDOCINO COUNTY NEAR ROCKPORT FROM NORTH 580 W BEACH STREET OF SOUTH FORK COTTONEVA CREEK BRIDGE TO WATSONVILLE CA 95076 JUNCTION OF ROUTE 101. FED. AID NO. ACST-S001(663)E PLACE HMA, REMOVE & INSTALL GUARDRAIL. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 25,000.0000 25,000.00 1.000 25,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 15,000.0000 15,000.00 1.000 15,000 003 TIME-RELATED OVERHEAD (LS) LS 925,000.0000 925,000.00 1.000 925,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 30,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 375,000.0000 375,000.00 1.000 375,000 007 CONSTRUCTION AREA SIGNS LS 6,720.0000 6,720.00 1.000 6,720 008 TRAFFIC CONTROL SYSTEM LS 1,425,000.0000 1,425,000.00 1.000 1,425,000 009 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5.0000 425.00 0.000 0 010 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.1200 39,120.00 162,624.000 19,514 011 PORTABLE RADAR SPEED FEEDBACK SIGN LS 84,000.0000 84,000.00 1.000 84,000 SYSTEMS (LS) 012 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 88,000.0000 88,000.00 1.000 88,000 013 JOB SITE MANAGEMENT LS 127,000.0000 127,000.00 1.000 127,000 014 PREPARE WATER POLLUTION CONTROL PROGRAM LS 27,500.0000 27,500.00 1.000 27,500 015 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 10.0000 9,700.00 0.000 0 MATRIX) 016 TEMPORARY COVER SQYD 10.0000 9,700.00 0.000 0 017 TEMPORARY CHECK DAM LF 20.0000 15,400.00 0.000 0 018 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 13,750.00 55.000 13,750 019 TEMPORARY FIBER ROLL LF 13.0000 39,000.00 125.000 1,625 020 TEMPORARY GRAVEL BAG BERM LF 10.0000 66,000.00 0.000 0 021 STREET SWEEPING LS 435,000.0000 435,000.00 1.000 435,000 022 TEMPORARY CONCRETE WASHOUT LS 15,000.0000 15,000.00 1.000 15,000 PROGRAM CAS145 PAGE 2 DATE 01/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H5904 TIME 01:31 PM ESTIMATE NO. 013 BID OPENING 06/29/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/25 R.E. NAME: MOSALLAI, MOJTABA DATE OF THIS ESTIMATE 01/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.2800 9,100.00 32,500.000 9,100 024 TEMPORARY HIGH-VISIBILITY FENCE LF 50.0000 7,500.00 150.000 7,500 025 CLEARING AND GRUBBING (LS) LS 175,000.0000 175,000.00 1.000 175,000 026 ROADWAY EXCAVATION CY 600.0000 504,000.00 832.200 499,320 027 SHOULDER BACKING TON 25.0000 277,500.00 5,546.660 138,666 028 FINISHING ROADWAY LS 132,000.0000 132,000.00 1.000 132,000 029 CRACK TREATMENT LNMI 17,500.0000 28,000.00 1.600 28,000 030 SEGMENT CORRECTION EA 1,515.0000 242,400.00 160.000 242,400 031 REPLACE ASPHALT CONCRETE SURFACING CY 3,200.0000 60,800.00 23.600 75,520 032 HOT MIX ASPHALT (TYPE A) TON 123.0000 3,333,300.00 23,855.180 2,934,187 033 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 170.0000 4,488,000.00 23,236.750 3,950,247 034 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT TON 1.0000 27.00 6.680 6 INTERLAYER) 035 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING SQYD 6.0000 18,540.00 3,105.000 18,630 FABRIC) 036 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING SQYD 8.2200 177,552.00 18,994.670 156,136 GRID) 037 DATA CORE LS 17,500.0000 17,500.00 1.000 17,500 038 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 7.0000 2,800.00 1,874.000 13,118 039 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 7.0000 525.00 448.000 3,136 040 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 7.0000 43,120.00 3,350.000 23,450 041 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 150.0000 12,300.00 6.000 900 AREA) 042 TACK COAT TON 800.0000 152,000.00 131.580 105,264 043 REMOVE ASPHALT CONCRETE DIKE LF 5.0000 33,000.00 6,600.000 33,000 044 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.5000 657,500.00 228,915.180 572,287 045 RAIL ELEMENT WALL SQFT 32.0000 25,600.00 772.000 24,704 046 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 300.0000 7,500.00 25.000 7,500 (.079" THICK) 047 10" FLUME DOWNDRAIN LF 300.0000 45,000.00 138.000 41,400 048 12" ENTRANCE TAPER EA 2,500.0000 2,500.00 1.000 2,500 049 10" FLUME ANCHOR ASSEMBLY EA 1,250.0000 33,750.00 25.000 31,250 PROGRAM CAS145 PAGE 3 DATE 01/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H5904 TIME 01:31 PM ESTIMATE NO. 013 BID OPENING 06/29/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/25 R.E. NAME: MOSALLAI, MOJTABA DATE OF THIS ESTIMATE 01/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE DOWNDRAIN (EA) EA 1,250.0000 16,250.00 12.000 15,000 051 ADJUST INLET EA 7,250.0000 21,750.00 3.000 21,750 052 REMOVE PAVEMENT MARKER EA 2.0000 13,860.00 6,508.000 13,016 053 GUARD RAILING DELINEATOR EA 15.2500 1,494.50 54.000 823 054 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.5000 28,470.00 4,283.000 27,839 055 PAVEMENT MARKER EA 10.0000 25,500.00 2,549.000 25,490 (RETROREFLECTIVE-RECESSED) 056 MILEPOST MARKER EA 55.0000 1,595.00 29.000 1,595 057 OBJECT MARKER (TYPE L-1) EA 55.0000 110.00 2.000 110 058 REMOVE ROADSIDE SIGN EA 50.0000 1,450.00 29.000 1,450 059 REMOVE SIGN POST EA 50.0000 5,500.00 110.000 5,500 060 RESET ROADSIDE SIGN (TWO POST) EA 150.0000 900.00 6.000 900 061 RESET ROADSIDE SIGN (METAL POST) EA 100.0000 14,000.00 140.000 14,000 062 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.5000 3,075.00 143.420 2,940 (0.063"-UNFRAMED) 063 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 320.00 16.000 320 (0.080"-UNFRAMED) 064 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 28.5000 5,985.00 204.500 5,828 (0.080"-FRAMED) 065 ROADSIDE SIGN - ONE POST EA 498.0000 54,780.00 102.000 50,796 066 ROADSIDE SIGN - TWO POST EA 990.0000 7,920.00 8.000 7,920 067 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 60.0000 4,500.00 75.000 4,500 068 MIDWEST GUARDRAIL SYSTEM (SPECIAL) LF 100.0000 25,000.00 250.000 25,000 069 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 48.0000 64,800.00 1,158.500 55,608 070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 85.0000 110,500.00 1,213.570 103,153 071 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 1,500.0000 4,500.00 3.000 4,500 072 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,000.0000 72,000.00 18.000 72,000 073 ASYMMETRICAL REPLACEMENT ASSEMBLY EA 1,250.0000 11,250.00 9.000 11,250 074 REMOVE GUARDRAIL LF 4.0000 10,160.00 2,312.500 9,250 075 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 20.0000 1,700.00 83.000 1,660 WET NIGHT VISIBILITY) 076 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.3000 419,900.00 315,861.000 410,619 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 4 DATE 01/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H5904 TIME 01:31 PM ESTIMATE NO. 013 BID OPENING 06/29/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/25 R.E. NAME: MOSALLAI, MOJTABA DATE OF THIS ESTIMATE 01/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.5000 5,950.00 1,794.000 4,485 (ENHANCED WET NIGHT VISIBILITY) 078 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 10.0000 12,800.00 537.000 5,370 (WATER BLASTING) 079 6" TRAFFIC STRIPE TAPE LF 10.0000 6,400.00 0.000 0 080 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 16.0000 10,240.00 0.000 0 (WARRANTY) 081 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 082 MODIFYING TRAFFIC MONITORING STATIONS LS 110,000.0000 110,000.00 1.000 110,000 PROGRAM CAS145 PAGE 5 DATE 01/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H5904 TIME 01:31 PM ESTIMATE NO. 013 BID OPENING 06/29/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/25 R.E. NAME: MOSALLAI, MOJTABA DATE OF THIS ESTIMATE 01/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 13,838,507.95 ADJUSTMENT OF COMPENSATION 0.00 104,644.92 EXTRA WORK 17,973.19 52,565.83 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 17,973.19 13,995,718.70 083 MOBILIZATION LS 1,650,000.0000 1,650,000.00 1.000 1,650,000 ORIGINAL CONTRACT AMOUNT 16,985,788.50 TOTAL WORK COMPLETED 17,973.19 15,645,718.70 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -5,000.00 -25,000.00 TOTAL 12,973.19 15,620,718.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/01/23 130 10/10/23 10/10/23 01/27/25 129 187 4 0 91% 96% PROGRESS IS SATISFACTORY MOSALLAI, MOJTABA RESIDENT ENGINEER