PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/24/19 EST. NO. 002 TIME 11:07 AM R.E. NAME: HADIPOUR, ROOZBEH 01-0H6304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/24/19 EST. NO. 002 TIME 11:07 AM R.E. NAME: HADIPOUR, ROOZBEH 01-0H6304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/24/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H6304 TIME 11:07 AM ESTIMATE NO. 002 BID OPENING 04/09/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 09/24/19 LOCATION PROGRESS ESTIMATE 01-MEN-1 ----------------- TRUESDELL CORPORATION OF IN MENDOCINO COUNTY ROUTE 1 AND ON CALIFORNIA, INC. ROUTE 128 AT VARIOUS LOCATIONS 1310 W. 23RD STREET; TEMPE AZ 85282 FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 14,000.0000 14,000.00 1.000 14,000 002 CONSTRUCTION AREA SIGNS LS 24,000.0000 24,000.00 0.160 3,840.00 0.560 13,440 003 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.230 23,000.00 0.400 40,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,000.0000 11,000.00 0.050 550.00 0.450 4,950 005 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.230 920.00 0.400 1,600 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 15,000.0000 15,000.00 0.750 11,250 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 3,730.00 1,780.000 1,780.00 1,780.000 1,780 STRIPE (HAZARDOUS WASTE) 008 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 32,000.0000 32,000.00 0.250 8,000.00 0.400 12,800 009 BAT AND BIRD EXCLUSION DEVICE LS 25,000.0000 25,000.00 0.150 3,750 010 HOT MIX ASPHALT (TYPE A) TON 450.0000 117,000.00 0.000 0 011 TACK COAT TON 2,000.0000 1,400.00 0.000 0 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 27.0000 30,780.00 0.000 0 013 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 10,000.0000 18,000.00 0.000 0 (F) 014 CLEAN EXPANSION JOINT LF 33.0000 30,690.00 0.000 0 015 JOINT SEAL (MR 1/2") LF 26.5000 10,494.00 0.000 0 016 BONDED JOINT SEAL (MR 1") LF 52.0000 8,788.00 0.000 0 017 BONDED JOINT SEAL (MR 1 1/2") LF 128.0000 3,968.00 0.000 0 018 JOINT SEAL (MR 1") LF 54.0000 10,908.00 0.000 0 019 JOINT SEAL (MR 1 1/2") LF 72.5000 9,570.00 0.000 0 020 BAR REINFORCING STEEL (EPOXY COATED) LB 3.0000 1,620.00 0.000 0 (F) (BRIDGE) 021 GALVANIC ANODE EA 40.0000 25,520.00 34.000 1,360.00 34.000 1,360 022 PUBLIC SAFETY PLAN LS 8,000.0000 8,000.00 0.500 4,000 PROGRAM CAS145 PAGE 2 DATE 09/24/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H6304 TIME 11:07 AM ESTIMATE NO. 002 BID OPENING 04/09/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 09/24/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RAPID SETTING CONCRETE (PATCH) CF 30.0000 23,940.00 12.000 360.00 12.000 360 024 REMOVE UNSOUND CONCRETE CF 30.0000 23,940.00 12.000 360.00 12.000 360 025 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5500 38,780.50 32,950.000 18,122.50 32,950.000 18,122 026 FURNISH POLYESTER CONCRETE OVERLAY CF 80.0000 509,120.00 2,901.000 232,080.00 2,901.000 232,080 027 PLACE POLYESTER CONCRETE OVERLAY SQFT 5.5000 349,926.50 32,815.000 180,482.50 32,815.000 180,482 (F) 028 TREAT BRIDGE DECK SQFT 0.7000 4,820.90 0.000 0 (F) 029 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 150.0000 11,550.00 0.000 0 030 BRIDGE REMOVAL (PORTION) LS 15,000.0000 15,000.00 0.000 0 031 REMOVE PAVEMENT MARKER EA 1.0000 205.00 103.000 103.00 103.000 103 032 PAVEMENT MARKER (RETROREFLECTIVE) EA 26.5000 5,432.50 0.000 0 033 THERMOPLASTIC PAVEMENT MARKING SQFT 30.0000 10,200.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 034 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 1,440.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 035 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.8500 4,930.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 036 PAINT TRAFFIC STRIPE (1-COAT) LF 1.4000 6,538.00 0.000 0 037 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.3000 31,845.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 038 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 6,855.00 2,660.000 3,990.00 2,660.000 3,990 039 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 945.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/24/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0H6304 TIME 11:07 AM ESTIMATE NO. 002 BID OPENING 04/09/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 09/24/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 474,948.00 544,428.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 474,948.00 544,428.00 040 MOBILIZATION LS 167,781.1000 167,781.10 0.950 159,392.05 0.950 159,392 ORIGINAL CONTRACT AMOUNT 1,718,718.00 TOTAL WORK COMPLETED 634,340.05 703,820.05 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 634,340.05 703,820.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/13/19 90 07/08/19 07/08/19 11/21/19 44 10 0 0 41% 49% PROGRESS IS SATISFACTORY HADIPOUR, ROOZBEH RESIDENT ENGINEER PROGRAM CAS145 DATE 09/24/19