PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/26 EST. NO. 002 TIME 01:50 PM R.E. NAME: HADIPOUR, ROOZBEH 01-0L2204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/26 EST. NO. 002 TIME 01:50 PM R.E. NAME: HADIPOUR, ROOZBEH 01-0L2204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION DEDUCT LTTR 10/2026 -2,000.00 002 -2,000.00 -2,000.00 TOTAL DEDUCTIONS -2,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0L2204 TIME 01:50 PM ESTIMATE NO. 002 BID OPENING 05/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 10/21/26 LOCATION PROGRESS ESTIMATE 01-LAK-29-17.6/18.0 ----------------- GHILOTTI CONSTRUCTION COMPANY, LAKE COUNTY FROM 0.2 MILE SOUTH OF C INC. STREET-ROAD 141S TO 0.1 MILE NORTH OF C 246 GHILOTTI AVENUE STREET-ROAD 141S SANTA ROSA CA 95407 FED. AID NO. HSST-S029(99) EARTHWORK, ROADWAY STRUCTURE SECTION, AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,025.0000 35,875.00 19.000 19,475.00 35.000 35,875 003 DEVELOP WATER SUPPLY LS 5,800.0000 5,800.00 0.540 3,132.00 1.000 5,800 004 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.750 3,975 005 TRAFFIC CONTROL SYSTEM LS 71,000.0000 71,000.00 0.540 38,340.00 1.000 71,000 006 STATIONARY IMPACT ATTENUATOR VEHICLE LS 5,600.0000 5,600.00 0.000 0 (LS) 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 7,000.00 1,765.900 1,765.90 8,725.200 8,725 008 PORTABLE RADAR SPEED FEEDBACK SIGN LS 3,400.0000 3,400.00 0.540 1,836.00 1.000 3,400 SYSTEMS (LS) 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,500.0000 4,500.00 0.540 2,430.00 1.000 4,500 010 AUTOMATED FLAGGER ASSISTANCE DEVICE LS 4,100.0000 4,100.00 0.540 2,214.00 0.940 3,854 011 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.540 1,620.00 1.000 3,000 012 STORMWATER POLLUTION PREVENTION PLAN LS 1,650.0000 1,650.00 0.540 891.00 1.000 1,650 013 PRE-STORM EVENT INSPECTION REPORT EA 230.0000 460.00 0.000 0 014 DURING- AND POST-STORM EVENT INSPECTION EA 230.0000 690.00 0.000 0 REPORT 015 STORMWATER ANNUAL REPORT EA 3,000.0000 3,000.00 0.000 0 016 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 840.0000 5,040.00 0.000 0 CONTROL) 017 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 6.5000 3,640.00 0.000 0 MATRIX) 018 TEMPORARY COVER SQYD 5.2500 5,880.00 0.000 0 019 TEMPORARY CHECK DAM LF 23.2500 465.00 0.000 0 020 TEMPORARY DRAINAGE INLET PROTECTION EA 286.0000 286.00 0.000 0 021 TEMPORARY FIBER ROLL LF 5.4000 21,600.00 0.000 0 022 STREET SWEEPING LS 2,000.0000 2,000.00 0.540 1,080.00 1.000 2,000 PROGRAM CAS145 PAGE 2 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0L2204 TIME 01:50 PM ESTIMATE NO. 002 BID OPENING 05/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.6000 102.00 0.000 0 024 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 7,500.0000 7,500.00 0.540 4,050.00 1.000 7,500 025 CLEARING AND GRUBBING (LS) LS 23,000.0000 23,000.00 1.000 23,000 026 ROADWAY EXCAVATION CY 137.0000 93,160.00 680.000 93,160 027 IMPORTED BORROW (CY) CY 79.0000 109,020.00 -339.970 -26,857.63 652.550 51,551 028 FIBER REINFORCED MATRIX (SQFT) SQFT 0.2800 35,840.00 90,231.430 25,264.80 90,231.430 25,264 029 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.6700 85,760.00 82,824.500 55,492.42 82,824.500 55,492 030 FIBER ROLLS LF 8.7700 32,185.90 3,555.000 31,177.35 3,555.000 31,177 031 COMPOST (CY) CY 68.6100 39,107.70 417.960 28,676.24 417.960 28,676 032 INCORPORATE MATERIALS SQFT 0.0500 2,775.00 43,650.000 2,182.50 43,650.000 2,182 033 CLASS 2 AGGREGATE BASE (CY) CY 165.0000 97,350.00 590.000 97,350 034 CRACK TREATMENT LNMI 47,457.0000 18,982.80 0.590 27,999.63 0.590 27,999 035 REPLACE ASPHALT CONCRETE SURFACING CY 1,600.0000 32,000.00 15.710 25,136 036 HOT MIX ASPHALT (TYPE A) TON 202.0000 349,460.00 900.000 181,800.00 1,796.020 362,796 037 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 265.0000 254,400.00 896.000 237,440.00 896.000 237,440 WITH 10% RAP 038 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT TON 1.0000 1.60 1.600 1.60 1.600 1 INTERLAYER) 039 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING SQYD 7.1000 9,443.00 1,322.670 9,390.96 1,322.670 9,390 FABRIC) 040 DATA CORE LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 041 TACK COAT TON 4,209.6806 13,050.01 0.000 0 042 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 24,600.00 2,050.000 24,600.00 2,050.000 24,600 043 30" CORRUGATED STEEL PIPE (.064" THICK) LF 1,100.0000 6,600.00 6.000 6,600 044 30" STEEL FLARED END SECTION EA 1,800.0000 3,600.00 2.000 3,600 045 REMOVE FLARED END SECTION (EA) EA 750.0000 750.00 1.000 750 046 REMOVE DELINEATOR EA 15.0000 45.00 3.000 45.00 3.000 45 047 DELINEATOR (CLASS 1) EA 48.0000 240.00 5.000 240.00 5.000 240 048 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 2,200.00 0.000 0 049 MARKER (CULVERT) EA 75.0000 150.00 2.000 150.00 2.000 150 PROGRAM CAS145 PAGE 3 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0L2204 TIME 01:50 PM ESTIMATE NO. 002 BID OPENING 05/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 TREATMENT BEST MANAGEMENT PRACTICE EA 85.0000 680.00 8.000 680.00 8.000 680 MARKER 051 REMOVE MARKER EA 20.0000 40.00 2.000 40.00 2.000 40 052 REMOVE ROADSIDE SIGN EA 50.0000 200.00 3.000 150.00 4.000 200 053 RESET ROADSIDE SIGN EA 300.0000 1,200.00 2.000 600.00 2.000 600 054 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 40.3000 1,209.00 26.850 1,082.06 26.850 1,082 (0.063"-UNFRAMED) 055 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 31.7500 222.25 6.750 214.31 6.750 214 (0.080"-UNFRAMED) 056 ROADSIDE SIGN - ONE POST EA 530.0000 2,650.00 5.000 2,650.00 5.000 2,650 057 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 40.0000 40.00 1.000 40.00 1.000 40 POST 058 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 25.0000 5,750.00 0.000 0 WET NIGHT VISIBILITY) 059 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 315.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 060 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 105.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 061 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 15,220.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 062 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 2,040.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 063 REMOVE PAINTED TRAFFIC STRIPE LF 2.0000 7,000.00 3,496.600 6,993 064 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 1,360.00 36.000 72.00 563.000 1,126 065 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 600.00 57.000 570.00 57.000 570 066 12" RUMBLE STRIP (ASPHALT CONCRETE STA 145.0000 5,220.00 37.200 5,394.00 37.200 5,394 PAVEMENT-SINUSOIDAL) PROGRAM CAS145 PAGE 4 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0L2204 TIME 01:50 PM ESTIMATE NO. 002 BID OPENING 05/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 690,929.14 1,283,972.76 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 690,929.14 1,283,972.76 067 MOBILIZATION LS 112,000.0000 112,000.00 0.050 5,600.00 1.000 112,000 ORIGINAL CONTRACT AMOUNT 1,593,960.26 TOTAL WORK COMPLETED 696,529.14 1,395,972.76 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -2,000.00 -2,000.00 TOTAL 694,529.14 1,393,972.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/25/26 35 08/27/26 08/27/26 11/01/26 35 5 0 0 86% 100% PROGRESS IS SATISFACTORY HADIPOUR, ROOZBEH RESIDENT ENGINEER