PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/25/26 EST. NO. 003 TIME 12:06 PM R.E. NAME: DUNNE, RYAN 01-0P6404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 5,648.25 E.W. @ F.A.(+) 052926 N 0001GR 002 0002 115,184.20 A.C. @ U.P.(+) 070126 N CT2 003 0001 36,413.91 A.C. @ L.S.(+) 070126 N CT01 157,246.36 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 157,246.36 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/25/26 EST. NO. 003 TIME 12:06 PM R.E. NAME: DUNNE, RYAN 01-0P6404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0P6404 TIME 12:06 PM ESTIMATE NO. 003 BID OPENING 01/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/01/26 R.E. NAME: DUNNE, RYAN DATE OF THIS ESTIMATE 09/25/26 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 01-HUM-101-R131.7/R134.6 ---------------------------------- G R SUNDBERG, INC. HUMBOLDT COUNTY ABOUT 10 MILES SOUTH OF 5211 BOYD ROAD KLAMATH FROM 2.7 MILES NORTH OF BOYES ARCATA CA 95521 CREEK VIADUCT TO 2.7 MILES SOUTH OF NORTH PRAIRIE CREEK PARK UNDERCROSSING FED. AID NO. N O N E COLD PLANE, PLACE RHMA-G, AND DELINEATION. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 570.0000 17,100.00 9.000 5,130.00 24.000 13,680 003 CONSTRUCTION AREA SIGNS LS 6,405.0000 6,405.00 0.500 3,202.50 1.000 6,405 004 TRAFFIC CONTROL SYSTEM LS 63,406.0000 63,406.00 0.500 31,703.00 1.000 63,406 005 STATIONARY IMPACT ATTENUATOR VEHICLE LS 43,470.0000 43,470.00 0.500 21,735.00 1.000 43,470 (LS) 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.4200 38,262.00 92,686.000 38,928 007 PORTABLE RADAR SPEED FEEDBACK SIGN LS 2,730.0000 2,730.00 0.500 1,365.00 1.000 2,730 SYSTEMS (LS) 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,675.0000 3,675.00 0.500 1,837.50 1.000 3,675 009 JOB SITE MANAGEMENT LS 98,751.0000 98,751.00 0.500 49,375.50 1.000 98,751 010 WATER POLLUTION CONTROL PROGRAM LS 1,680.0000 1,680.00 0.500 840.00 1.000 1,680 011 TEMPORARY GRAVEL BAG BERM LF 10.6500 15,336.00 0.000 0 012 SHOULDER BACKING TON 124.5000 9,711.00 0.000 0 013 IMPORTED BORROW (CY) CY 82.0000 5,576.00 0.000 0 014 SEGMENT CORRECTION EA 2,993.2000 44,898.00 15.000 44,898 015 HOT MIX ASPHALT (TYPE A) TON 178.0000 96,120.00 126.770 22,565.06 127.000 22,606 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 197.6800 1,755,398.40 264.000 52,187.52 7,510.000 1,484,576 017 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 3.7300 26,818.70 0.000 0 018 TACK COAT TON 1,326.0000 43,758.00 4.080 5,410.08 33.000 43,758 019 REMOVE ASPHALT CONCRETE DIKE LF 2.7700 19,916.30 0.000 0 020 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 11.8000 81,892.00 12,730.000 150,214 021 PAVEMENT MARKER EA 9.2500 17,760.00 1,945.000 17,991.25 1,945.000 17,991 (RETROREFLECTIVE-RECESSED) 022 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 14.2500 3,562.50 25.000 356.25 25.000 356 WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 2 DATE 09/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0P6404 TIME 12:06 PM ESTIMATE NO. 003 BID OPENING 01/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/01/26 R.E. NAME: DUNNE, RYAN DATE OF THIS ESTIMATE 09/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 216.00 510.000 229.50 510.000 229 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 13,815.00 31,300.000 14,085.00 31,300.000 14,085 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9700 88,658.00 94,014.000 91,193.58 94,014.000 91,193 (ENHANCED WET NIGHT VISIBILITY) 026 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2100 25,830.00 123,836.000 26,005 027 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 6.5000 1,625.00 244.000 1,586 028 12" RUMBLE STRIP (ASPHALT CONCRETE STA 40.0000 23,200.00 586.000 23,440.00 586.000 23,440 PAVEMENT) PROGRAM CAS145 PAGE 3 DATE 09/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-0P6404 TIME 12:06 PM ESTIMATE NO. 003 BID OPENING 01/27/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/01/26 R.E. NAME: DUNNE, RYAN DATE OF THIS ESTIMATE 09/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 342,646.74 2,195,665.06 ADJUSTMENT OF COMPENSATION 151,598.11 151,598.11 EXTRA WORK 5,648.25 5,648.25 SUBTOTAL AMOUNT EARNED 499,893.10 2,352,911.42 ORIGINAL CONTRACT AMOUNT 2,551,569.90 TOTAL WORK COMPLETED 499,893.10 2,352,911.42 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 499,893.10 2,352,911.42 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/13/26 30 05/12/26 05/12/26 07/01/26 24 14 0 0 100% 100% DUNNE, RYAN RESIDENT ENGINEER