PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/09/16 EST. NO. 009 TIME 09:19 AM R.E. NAME: PERRIN, KATHARINE 01-362914 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0014-1 -326.99 E.W. @ F.A.(+) 090815 N 1021.0 DAO CORRECTING ENTRY 0017-1 -278.31 091315 N 1024.0 DAO CORRECTING ENTRY 0019-1 -293.92 092015 N 1028.0 DAO CORRECTING ENTRY 0020-1 -146.96 092115 N 1031.0 DAO CORRECTING ENTRY 018 0001 752.22 A.C. @ L.S.(+) 050216 N 18.001 -293.96 TOTAL THIS ESTIMATE 354,019.70 TOTAL PREVIOUS ESTIMATE 353,725.74 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/09/16 EST. NO. 009 TIME 09:19 AM R.E. NAME: PERRIN, KATHARINE 01-362914 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING FNL CEM4401 -10,000.00 006 REC'D FNL CEM4401 10,000.00 007 0.00 0.00 EQUAL EMPLOYMENT OPPORTUNITY MISSING CEM2402F -10,000.00 006 REC'D CEM2402F 10,000.00 009 10,000.00 0.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 9/15 -7,000.00 004 PER LTR DATED 10/15 -5,000.00 005 RTN DEDUCT 9/15 7,000.00 008 RTN DEDUCT 10/15 5,000.00 008 0.00 0.00 TOTAL DEDUCTIONS 10,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 05/09/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-362914 TIME 09:19 AM ESTIMATE NO. 009 BID OPENING 11/06/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/05/15 R.E. NAME: PERRIN, KATHARINE DATE OF THIS ESTIMATE 05/09/16 LOCATION SEMI-FINAL ESTIMATE 01-MEN-101-9.6/10.7 ------------------- 01-MEN-101-11.2/20.9 DESILVA GATES CONSTRUCTION LP NEAR HOPLAND FROM HOPLAND OVERHEAD 11555 DUBLIN BLVD. BRIDGE TO FELIZ CREEK BRIDGE AND DUBLIN CA 94568 FROM 0.1 MILE NORTH OF FIRST STREET TO ROBINSON CREEK BRIDGE FED. AID NO. NHP-Q101(256)E RUBBERIZED HMA OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 1.000 5,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,000.0000 360,000.00 187.000 374,000 004 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 1.000 5,000 005 TRAFFIC CONTROL SYSTEM LS 314,000.0000 314,000.00 1.000 314,000 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 1.000 10,000 007 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 1.000 1,000 009 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 5,800.00 23.000 4,600 010 ASBESTOS COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 011 REMOVE ASPHALT CONCRETE DIKE LF 1.0000 12,000.00 11,416.000 11,416 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.6000 512,000.00 325,799.000 521,278 013 SHOULDER BACKING TON 10.0000 75,400.00 3,926.420 39,264 014 CRACK TREATMENT LNMI 3,500.0000 115,500.00 0.000 0 015 REPLACE ASPHALT CONCRETE SURFACING CY 240.0000 184,800.00 766.000 183,840 016 MINOR HOT MIX ASPHALT TON 90.0000 27,900.00 314.640 28,317 017 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 116.0000 3,723,600.00 29,735.190 3,449,282 018 SHOULDER RUMBLE STRIP STA 10.0000 8,100.00 606.500 6,065 (HMA,GROUND-IN INDENTATIONS) 019 CENTERLINE RUMBLE STRIP STA 10.0000 7,300.00 740.380 7,403 (HMA, GROUND-IN INDENTATIONS) 020 DATA CORE LS 5,000.0000 5,000.00 1.000 5,000 021 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 2.0000 10,480.00 5,285.000 10,570 022 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 2.0000 13,480.00 6,558.400 13,116 PROGRAM CAS145 PAGE 2 DATE 05/09/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-362914 TIME 09:19 AM ESTIMATE NO. 009 BID OPENING 11/06/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/05/15 R.E. NAME: PERRIN, KATHARINE DATE OF THIS ESTIMATE 05/09/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 116.0000 1,925,600.00 17,656.600 2,048,165 (BONDED WEARING COURSE) 024 TACK COAT TON 1.0000 290.00 179.880 179 025 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 3,810.00 2,520.000 7,560 (ENHANCED WET NIGHT VISIBILITY) 026 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 61,500.00 222,553.000 66,765 (ENHANCED WET NIGHT VISIBILITY) 027 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 243.00 466.000 139 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 028 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 15,200.00 65,947.000 16,486 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 029 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 1,794.00 3,121.000 1,872 (ENHANCED WET NIGHT VISIBILITY) 030 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 25,200.00 9,466.000 28,398 031 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 032 ASPHALTIC EMULSION MEMBRANE TON 1.0000 270.00 262.460 262 (BONDED WEARING COURSE) PROGRAM CAS145 PAGE 3 DATE 05/09/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-362914 TIME 09:19 AM ESTIMATE NO. 009 BID OPENING 11/06/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/05/15 R.E. NAME: PERRIN, KATHARINE DATE OF THIS ESTIMATE 05/09/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 7,167,984.83 ADJUSTMENT OF COMPENSATION 752.22 -233,469.85 EXTRA WORK -1,046.18 587,195.59 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION -293.96 7,521,710.57 033 MOBILIZATION LS 826,000.0000 826,000.00 1.000 826,000 ORIGINAL CONTRACT AMOUNT 8,265,267.00 TOTAL WORK COMPLETED -293.96 8,347,710.57 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 0.00 TOTAL 9,706.04 8,347,710.57 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/08/15 180 07/08/15 01/26/15 12/05/15 115 101 6 0 100% 100% PERRIN, KATHARINE RESIDENT ENGINEER PROGRAM CAS145 DATE 05/09/16