PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/23/05 EST. NO.01 TIME 11:15 AM R.E. NAME: KOHLER, WES 01-410204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/23/05 EST. NO.01 TIME 11:15 AM R.E. NAME: KOHLER, WES 01-410204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-410204 TIME 11:15 AM ESTIMATE NO. 01 BID OPENING 07/21/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: KOHLER, WES DATE OF THIS ESTIMATE 05/23/05 LOCATION PROGRESS ESTIMATE 01-LAK-29-27.4/28.0 ----------------- GRANITE CONSTRUCTION COMPANY IN LAKE COUNTY ABOUT 12 KM NORTH OF P O BOX 50085 LOWER LAKE FROM 0.8 KM SOUTH OF WATSONVILLE CA 950775085 ROUTE 281 TO 0.2 KM NORTH OF ROUTE 281 FED. AID NO. ACST-P029(96)E ,PH-P029(96)E REALIGN VERTICAL CURVE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 15.0000 5,100.00 230.000 3,450.00 230.000 3,450.00 02 PREPARE STORM WATER POLLUTION LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750.00 PREVENTION PLAN 03 WATER POLLUTION CONTROL LS 7,500.0000 7,500.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 3,500.0000 3,500.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.900 4,500.00 0.900 4,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 89,400.0000 89,400.00 0.000 0.00 S) 07 TRAFFIC PLASTIC DRUM EA 150.0000 2,250.00 0.000 0.00 S) 08 TYPE III BARRICADE EA 75.0000 225.00 0.000 0.00 S) 09 TEMPORARY PAVEMENT MARKING (PAINT) M2 55.0000 6,050.00 0.000 0.00 S) 10 TEMPORARY TRAFFIC STRIPE (PAINT) M 2.0000 16,400.00 0.000 0.00 S) 11 TEMPORARY PAVEMENT MARKER EA 4.0000 2,360.00 0.000 0.00 S) 12 PORTABLE CHANGEABLE MESSAGE SIGN EA 7,500.0000 30,000.00 0.000 0.00 S) 13 TEMPORARY RAILING (TYPE K) M 25.0000 27,500.00 0.000 0.00 S) 14 TEMPORARY CRASH CUSHION MODULE EA 200.0000 11,200.00 0.000 0.00 S) 15 REMOVE ROADSIDE SIGN EA 150.0000 150.00 0.000 0.00 16 REMOVE CULVERT M 90.0000 4,320.00 0.000 0.00 17 REMOVE INLET EA 250.0000 250.00 0.000 0.00 18 REMOVE HEADWALL EA 500.0000 1,500.00 0.000 0.00 19 RESET MAILBOX EA 350.0000 350.00 0.000 0.00 20 RESET ROADSIDE SIGN EA 250.0000 10,250.00 4.000 1,000.00 4.000 1,000.00 21 RELOCATE FENCE M 32.0000 8,640.00 0.000 0.00 22 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.0000 25,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-410204 TIME 11:15 AM ESTIMATE NO. 01 BID OPENING 07/21/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: KOHLER, WES DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CLEARING AND GRUBBING LS 17,000.0000 17,000.00 0.000 0.00 24 ROADWAY EXCAVATION M3 12.0000 193,200.00 0.000 0.00 25 STRAW (EROSION CONTROL) TONN 425.0000 2,975.00 0.000 0.00 S) 26 FIBER (EROSION CONTROL) KG 0.5000 1,680.00 0.000 0.00 S) 27 FIBER ROLLS M 12.0000 5,160.00 0.000 0.00 S) 28 COMPOST (EROSION CONTROL) M3 450.0000 2,250.00 0.000 0.00 S) 29 PURE LIVE SEED (EROSION CONTROL) KG 43.0000 6,880.00 0.000 0.00 S) 30 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 1.5000 315.00 0.000 0.00 S) 31 STABILIZING EMULSION (EROSION CONTROL) KG 2.0000 480.00 0.000 0.00 S) 32 CLASS 2 AGGREGATE BASE M3 48.0000 318,240.00 0.000 0.00 33 REPLACE ASPHALT CONCRETE SURFACING M3 340.0000 6,800.00 0.000 0.00 34 ASPHALT CONCRETE (TYPE A) TONN 71.0000 372,750.00 0.000 0.00 35 ASPHALT CONCRETE (OPEN GRADED) TONN 83.0000 48,970.00 0.000 0.00 36 PAVEMENT REINFORCING FABRIC M2 15.0000 6,600.00 0.000 0.00 37 SHOULDER RUMBLE STRIP STA 250.0000 2,500.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 38 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 1,200.00 0.000 0.00 F) 39 MINOR CONCRETE (HEADWALL) M3 1,850.0000 10,730.00 0.000 0.00 F) 40 ROADSIDE SIGN - ONE POST EA 1,200.0000 1,200.00 0.000 0.00 41 600 MM ALTERNATIVE PIPE CULVERT M 350.0000 6,300.00 0.000 0.00 42 1050 MM ALTERNATIVE PIPE CULVERT M 475.0000 15,200.00 0.000 0.00 43 450 MM REINFORCED CONCRETE PIPE M 300.0000 900.00 0.000 0.00 44 GRATED LINE DRAIN M 300.0000 4,500.00 0.000 0.00 45 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 100.0000 15,000.00 0.000 0.00 46 ROCK SLOPE PROTECTION FABRIC M2 2.0000 720.00 0.000 0.00 47 MISCELLANEOUS IRON AND STEEL KG 3.0000 900.00 0.000 0.00 F) 48 DELINEATOR (CLASS 1) EA 40.0000 1,000.00 0.000 0.00 49 MARKER (CULVERT) EA 75.0000 150.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-410204 TIME 11:15 AM ESTIMATE NO. 01 BID OPENING 07/21/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: KOHLER, WES DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 HIGHWAY POST MARKER EA 75.0000 300.00 0.000 0.00 51 THERMOPLASTIC PAVEMENT MARKING M2 55.0000 3,740.00 0.000 0.00 S) 52 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.7500 7,350.00 0.000 0.00 S) 53 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 1,340.00 0.000 0.00 S) 54 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 240.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 55 PAVEMENT MARKER EA 11.0000 3,740.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 56 MODIFY LIGHTING & FLASHING BEACON LS 42,580.0000 42,580.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 05/23/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-410204 TIME 11:15 AM ESTIMATE NO. 01 BID OPENING 07/21/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: KOHLER, WES DATE OF THIS ESTIMATE 05/23/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 12,700.00 12,700.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 12,700.00 12,700.00 57 MOBILIZATION LS 150,000.0000 150,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 1,514,835.00 TOTAL WORK COMPLETED 12,700.00 12,700.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 12,700.00 12,700.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/01/04 90 05/09/05 09/16/04 05/20/05 4 167 0 0 1% 4% PROGRESS IS SATISFACTORY KOHLER, WES RESIDENT ENGINEER PROGRAM CAS145 DATE 05/23/05