PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/23 EST. NO. 002 TIME 08:20 AM R.E. NAME: HADIPOUR, ROOZBEH 01-434804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/23 EST. NO. 002 TIME 08:20 AM R.E. NAME: HADIPOUR, ROOZBEH 01-434804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 LOCATION RERUN PROGRESS ESTIMATE 01-MEN-1-61.9/62.2 ----------------------- MCM CONSTRUCTION, INC. IN MENDOCINO COUNTY IN FORT BRAGG PO BOX 620; FROM ELM STREE TO PUDDING CREEK RD NORTH HIGHLANDS CA 95660 -421 FED. AID NO. ACST-S001(658)E WIDEN BRIDGE AND UPGRADE BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 8,000.0000 8,000.00 0.000 0 002 TIME-RELATED OVERHEAD (LS) LS 350,000.0000 350,000.00 0.000 0 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 12,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.700 7,000 006 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.000 0 007 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 10.0000 240.00 0.000 0 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 2,090.00 0.000 0 009 CHANNELIZER (SURFACE MOUNTED) EA 120.0000 3,360.00 0.000 0 010 PORTABLE SIGNAL SYSTEMS (EA) EA 32,500.0000 65,000.00 0.000 0 011 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 5,000.0000 5,000.00 0.000 0 012 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 12,000.0000 12,000.00 0.000 0 013 TEMPORARY RAILING (TYPE K) LF 55.0000 56,100.00 0.000 0 014 ALTERNATIVE TEMPORARY CRASH CUSHION EA 5,000.0000 30,000.00 0.000 0 015 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.000 0 016 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.750 2,250 PLAN 017 RAIN EVENT ACTION PLAN EA 500.0000 3,500.00 0.000 0 018 STORM WATER SAMPLING AND ANALYSIS DAY EA 925.0000 9,250.00 0.000 0 019 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 020 MOVE-IN/MOVE-OUT EA 1,000.0000 4,000.00 0.000 0 (TEMPORARY EROSION CONTROL) 021 TEMPORARY HYDRAULIC MULCH SQYD 3.5000 4,620.00 0.000 0 (BONDED FIBER MATRIX) 022 TEMPORARY COVER SQYD 6.0000 7,920.00 293.500 1,761.00 293.500 1,761 PROGRAM CAS145 PAGE 2 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY CHECK DAM LF 12.0000 2,160.00 0.000 0 024 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 4,550.00 1.000 350 025 TEMPORARY FIBER ROLL LF 6.0000 2,460.00 3,900.000 23,400 026 TEMPORARY GRAVEL BAG BERM LF 20.0000 8,800.00 0.000 0 027 TEMPORARY SILT FENCE LF 6.0000 7,800.00 460.000 2,760 028 TEMPORARY CONSTRUCTION ENTRANCE EA 7,500.0000 30,000.00 1.000 7,500 029 STREET SWEEPING LS 25,000.0000 25,000.00 0.000 0 030 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.000 0 031 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 1,400.0000 7,000.00 0.000 0 032 WATER QUALITY MONITORING REPORT EA 1,000.0000 5,000.00 0.000 0 033 WATER QUALITY ANNUAL REPORT EA 1,100.0000 2,200.00 0.000 0 034 BAT AND BIRD EXCLUSION DEVICE LS 40,000.0000 40,000.00 0.500 20,000 035 TREATED WOOD WASTE LB 0.2500 2,625.00 0.000 0 036 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 35,000.0000 35,000.00 0.000 0 037 HYDROACOUSTIC MONITORING LS 25,000.0000 25,000.00 0.000 0 038 TEMPORARY HIGH-VISIBILITY FENCE LF 10.0000 4,600.00 460.000 4,600 039 CLEARING AND GRUBBING (LS) LS 35,000.0000 35,000.00 1.000 35,000 040 ROADWAY EXCAVATION CY 155.0000 26,350.00 13.030 2,019.65 13.030 2,019 041 ROADWAY EXCAVATION (TYPE Z-2) CY 320.0000 118,400.00 4.150 1,328.00 4.150 1,328 (AERIALLY DEPOSITED LEAD) 042 ROADWAY EXCAVATION (TYPE COM) CY 155.0000 7,130.00 26.900 4,169.50 26.900 4,169 (AERIALLY DEPOSITED LEAD) 043 SHOULDER BACKING TON 1,000.0000 2,500.00 0.000 0 044 STRUCTURE EXCAVATION (BRIDGE) CY 700.0000 114,100.00 119.580 83,706.00 119.580 83,706 (F) 045 STRUCTURE EXCAVATION (RETAINING WALL) CY 300.0000 26,100.00 87.000 26,100.00 87.000 26,100 (F) 046 STRUCTURE EXCAVATION (TYPE Z-2) CY 1,600.0000 11,200.00 3.500 5,600.00 3.500 5,600 (AERIALLY DEPOSITED LEAD) 047 STRUCTURE BACKFILL (BRIDGE) CY 325.0000 44,850.00 26.520 8,619.00 26.520 8,619 (F) 048 STRUCTURE BACKFILL (RETAINING WALL) CY 350.0000 23,100.00 0.000 0 (F) 049 DITCH EXCAVATION CY 80.0000 62,400.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 IMPORTED BORROW (CY) CY 105.0000 42,000.00 0.000 0 051 ROCK MULCH SQFT 110.0000 5,500.00 0.000 0 052 WOOD MULCH CY 250.0000 3,250.00 0.000 0 053 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,200.0000 4,400.00 0.000 0 054 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 2.0000 5,720.00 0.000 0 055 HYDROMULCH SQFT 0.2000 7,220.00 0.000 0 056 FIBER ROLLS LF 6.0000 16,080.00 0.000 0 057 HYDROSEED SQFT 0.3000 10,830.00 0.000 0 058 COMPOST (CY) CY 80.0000 10,400.00 0.000 0 059 INCORPORATE MATERIALS SQFT 2.0000 4,500.00 0.000 0 060 CLASS 2 AGGREGATE BASE (CY) CY 155.0000 65,100.00 0.000 0 061 HOT MIX ASPHALT (TYPE A) TON 333.0000 243,090.00 0.000 0 062 ASPHALTIC EMULSION TON 5,000.0000 1,500.00 0.000 0 (BONDED WEARING COURSE) 063 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 20.0000 11,200.00 0.000 0 (PAVING FABRIC) 064 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 120.0000 4,200.00 0.000 0 065 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 120.0000 7,440.00 0.000 0 066 PLACE HOT MIX ASPHALT SQYD 10,000.0000 8,000.00 0.000 0 (MISCELLANEOUS AREA) 067 TACK COAT TON 1,100.0000 3,740.00 0.000 0 068 REMOVE ASPHALT CONCRETE DIKE LF 55.0000 1,925.00 0.000 0 069 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 11.0000 51,590.00 0.000 0 070 RETAINING WALL (MASONRY WALL) SQFT 50.0000 31,450.00 75.000 3,750.00 75.000 3,750 (F) 071 FURNISH STEEL PILING (HP 12 X 84) LF 100.0000 56,400.00 0.000 0 072 DRIVE STEEL PILE (HP 12 X 84) EA 7,500.0000 60,000.00 0.000 0 073 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 2,000.0000 36,000.00 0.000 0 (F) 074 STRUCTURAL CONCRETE, BRIDGE CY 12,000.0000 540,000.00 0.000 0 (F) 075 STRUCTURAL CONCRETE, RETAINING WALL CY 1,400.0000 29,400.00 21.000 29,400.00 21.000 29,400 (F) 076 STRUCTURAL CONCRETE, DRAINAGE INLET CY 4,000.0000 44,000.00 3.050 12,200.00 3.050 12,200 (F) PROGRAM CAS145 PAGE 4 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 MINOR CONCRETE (MINOR STRUCTURE) CY 7,000.0000 35,000.00 0.000 0 (F) 078 DRILL AND BOND DOWEL LF 50.0000 60,600.00 13.330 666.50 13.330 666 079 CLEAN EXPANSION JOINT LF 50.0000 8,000.00 0.000 0 080 FURNISH PRECAST PRESTRESSED EA 30,500.0000 976,000.00 0.000 0 CONCRETE DECK UNIT (30'-40') 081 ERECT PRECAST PRESTRESSED CONCRETE DECK EA 16,100.0000 515,200.00 0.000 0 UNIT 082 JOINT SEAL (MR 1/2") LF 65.0000 8,060.00 0.000 0 083 JOINT SEAL (MR 1") LF 75.0000 9,300.00 0.000 0 084 BAR REINFORCING STEEL (RETAINING WALL) LB 5.0000 12,000.00 2,400.000 12,000.00 2,400.000 12,000 (F) 085 BAR REINFORCING STEEL (EPOXY COATED) LB 2.0000 26,852.00 1,501.300 3,002.60 1,501.300 3,002 (F) (BRIDGE) 086 BAR REINFORCING STEEL LB 12.0000 58,824.00 88.570 1,062.84 88.570 1,062 (F) (STAINLESS STEEL) (BRIDGE) 087 PUBLIC SAFETY PLAN LS 12,000.0000 12,000.00 0.000 0 088 CORE AND PRESSURE GROUT DOWEL LF 200.0000 22,400.00 0.000 0 089 RAPID SETTING CONCRETE (PATCH) CF 80.0000 3,920.00 0.000 0 090 REMOVE UNSOUND CONCRETE CF 220.0000 10,780.00 0.000 0 091 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 4.0000 32,132.00 0.000 0 092 REFINISH CONCRETE SURFACE SQFT 75.0000 9,450.00 0.000 0 093 FURNISH POLYESTER CONCRETE OVERLAY CF 120.0000 80,400.00 0.000 0 094 PLACE POLYESTER CONCRETE OVERLAY SQFT 9.0000 72,297.00 0.000 0 (F) 095 CORE CONCRETE (3") LF 275.0000 63,250.00 0.000 0 096 CORE CONCRETE (1 1/2") LF 175.0000 10,850.00 0.000 0 097 BRIDGE REMOVAL (PORTION) LS 150,000.0000 150,000.00 0.000 0 098 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 099 CONCRETE BACKFILL (PIPE TRENCH) CY 300.0000 19,200.00 21.000 6,300.00 21.000 6,300 (F) 100 IMPORTED BIOFILTRATION SOIL CY 155.0000 4,495.00 0.000 0 101 18" PLASTIC PIPE LF 220.0000 85,800.00 360.000 79,200.00 360.000 79,200 102 18" HDPE (TYPE S) LF 250.0000 80,000.00 0.000 0 103 GEOCOMPOSITE DRAIN SQFT 75.0000 8,175.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 18" ALTERNATIVE FLARED END SECTION EA 1,000.0000 2,000.00 0.000 0 105 REMOVE CULVERT (LF) LF 50.0000 12,500.00 241.000 12,050.00 241.000 12,050 106 REMOVE INLET EA 1,500.0000 3,000.00 2.000 3,000.00 2.000 3,000 107 CULVERT SLURRY-CEMENT BACKFILL CY 2,000.0000 1,800.00 0.000 0 108 ROCK SLOPE PROTECTION CY 300.0000 3,900.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 109 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 30.0000 1,140.00 0.000 0 110 MINOR CONCRETE (MISCELLANEOUS CY 850.0000 42,500.00 0.000 0 CONSTRUCTION) 111 MINOR CONCRETE (CURB, SIDEWALK AND CY 1,000.0000 190,000.00 0.000 0 CURB RAMP) 112 PRE/POST CONSTRUCTION SURVEYS EA 10,000.0000 20,000.00 0.000 0 113 MISCELLANEOUS IRON AND STEEL LB 4.0000 7,788.00 0.000 0 (F) 114 WATER MAIN RELOCATION LS 780,000.0000 780,000.00 0.180 140,400.00 0.180 140,400 115 SANITARY SEWER FORCE MAIN RELOCATION LS 400,000.0000 400,000.00 0.000 0 116 STAIN GALVANIZED SURFACES (LS) LS 15,000.0000 15,000.00 0.000 0 117 REMOVE PAVEMENT MARKER EA 5.0000 300.00 0.000 0 118 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 2,030.00 0.000 0 119 RELOCATE ROADSIDE SIGN EA 500.0000 9,000.00 0.000 0 120 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 400.00 0.000 0 (0.080"-UNFRAMED) 121 ROADSIDE SIGN - ONE POST EA 500.0000 500.00 0.000 0 122 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 500.0000 500.00 0.000 0 METHOD) 123 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 55.0000 7,150.00 0.000 0 124 PEDESTRIAN RAILING LF 450.0000 305,100.00 0.000 0 (F) 125 CABLE RAILING LF 60.0000 14,640.00 0.000 0 (F) 126 TRANSITION RAILING (TYPE WB-31) EA 5,500.0000 22,000.00 0.000 0 127 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,000.0000 20,000.00 0.000 0 128 CALIFORNIA ST-75 BRIDGE RAIL LF 575.0000 423,200.00 0.000 0 (F) (MODIFIED) 129 REMOVE GUARDRAIL LF 10.0000 4,800.00 40.000 400.00 40.000 400 130 THERMOPLASTIC PAVEMENT MARKING SQFT 9.0000 17,010.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 6 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 580.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 132 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 7,095.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 133 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 134 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 1,230.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 135 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 7,480.00 0.000 0 136 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 5,820.00 0.000 0 137 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 13.0000 16,900.00 0.000 0 138 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 139 LIGHTING SYSTEM LS 145,000.0000 145,000.00 0.000 0 140 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 40,000.0000 40,000.00 0.000 0 141 MODIFYING FLASHING BEACON SYSTEMS LS 45,000.0000 45,000.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 04/25/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-434804 TIME 08:20 AM ESTIMATE NO. 002 BID OPENING 09/07/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/23 R.E. NAME: HADIPOUR, ROOZBEH DATE OF THIS ESTIMATE 04/25/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 436,735.09 539,595.09 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 436,735.09 539,595.09 142 MOBILIZATION LS 850,500.0000 850,500.00 0.500 425,250.00 0.500 425,250 ORIGINAL CONTRACT AMOUNT 8,529,488.00 TOTAL WORK COMPLETED 861,985.09 964,845.09 MATERIALS ON HAND ON SITE 157,699.37 231,213.01 DEDUCTIONS 0.00 0.00 TOTAL 1,019,684.46 1,196,058.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/16/22 90 03/13/23 03/13/23 08/28/23 0 28 0 0 11% 0% PROGRESS IS SATISFACTORY HADIPOUR, ROOZBEH RESIDENT ENGINEER