PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/20/08 EST. NO.01 TIME 11:14 AM R.E. NAME: BAKER, SCOTT 01-443504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/20/08 EST. NO.01 TIME 11:14 AM R.E. NAME: BAKER, SCOTT 01-443504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-443504 TIME 11:14 AM ESTIMATE NO. 01 BID OPENING 10/10/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: BAKER, SCOTT DATE OF THIS ESTIMATE 03/20/08 LOCATION RERUN PROGRESS ESTIMATE 01-VAR ----------------------- BUGLER CONSTRUCTION IN LAKE AND MENDOCINO COUNTIES AT 47000 WARM SPRINGS BLVD NO 10 VARIOUS LOCATIONS FREMONT CA 94539 FED. AID NO. N O N E REPAIR BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.090 180.00 0.090 180.00 02 PREPARE WATER POLLUTION CONTROL LS 1,900.0000 1,900.00 0.750 1,425.00 0.750 1,425.00 PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 11,000.0000 11,000.00 0.750 8,250.00 0.750 8,250.00 S) 05 TRAFFIC CONTROL SYSTEM LS 46,000.0000 46,000.00 0.090 4,140.00 0.090 4,140.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,000.0000 4,000.00 0.090 360.00 0.090 360.00 S) 07 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 7.0000 8,330.00 0.000 0.00 S) STRIPE 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 8.0000 9,520.00 0.000 0.00 S) 09 REMOVE POLYESTER CONCRETE OVERLAY SQFT 1.0000 19,520.00 19,520.000 19,520.00 19,520.000 19,520.00 10 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.8000 15,616.00 0.000 0.00 11 CLEAN BRIDGE DECK SQFT 0.4000 10,052.00 0.000 0.00 12 BRIDGE REMOVAL (PORTION), LOCATION A LS 20,000.0000 20,000.00 0.000 0.00 13 BRIDGE REMOVAL (PORTION), LOCATION B LS 20,000.0000 20,000.00 0.000 0.00 14 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 15 STRUCTURAL CONCRETE, BRIDGE CY 1,200.0000 30,000.00 0.000 0.00 F) 16 CLEAN EXPANSION JOINT LF 30.0000 4,170.00 44.000 1,320.00 44.000 1,320.00 17 FURNISH POLYESTER CONCRETE OVERLAY CF 95.0000 138,700.00 0.000 0.00 18 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.0000 78,080.00 0.000 0.00 F) 19 JOINT SEAL (MR 1") LF 60.0000 5,100.00 20.500 1,230.00 20.500 1,230.00 S) 20 JOINT SEAL ASSEMBLY (MR 4") LF 115.0000 31,510.00 20.500 2,357.50 20.500 2,357.50 S) 21 JOINT SEAL (MR 2") LF 110.0000 5,720.00 0.000 0.00 S) 22 BAR REINFORCING STEEL (BRIDGE) LB 2.0000 4,300.00 0.000 0.00 SF) PROGRAM CAS145 PAGE 2 DATE 03/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-443504 TIME 11:14 AM ESTIMATE NO. 01 BID OPENING 10/10/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: BAKER, SCOTT DATE OF THIS ESTIMATE 03/20/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TREAT BRIDGE DECK SQFT 0.5000 12,565.00 0.000 0.00 F) 24 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 75.0000 21,000.00 0.000 0.00 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 14,460.00 0.000 0.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 15.0000 1,650.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 03/20/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-443504 TIME 11:14 AM ESTIMATE NO. 01 BID OPENING 10/10/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: BAKER, SCOTT DATE OF THIS ESTIMATE 03/20/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 40,782.50 40,782.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 40,782.50 40,782.50 27 MOBILIZATION LS 50,000.0000 50,000.00 0.500 25,000.00 0.500 25,000.00 ORIGINAL CONTRACT AMOUNT 568,693.00 TOTAL WORK COMPLETED 65,782.50 65,782.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 65,782.50 65,782.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/13/07 45 00/00/00 11/28/07 05/19/08 5 72 0 0 12% 11% PROGRESS IS SATISFACTORY *** SUSPENDED ON 12/27/07. BAKER, SCOTT RESIDENT ENGINEER PROGRAM CAS145 DATE 03/20/08