PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/09/10 EST. NO.09 TIME 01:56 PM R.E. NAME: MULLEN, RICHARD 01-472404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/09/10 EST. NO.09 TIME 01:56 PM R.E. NAME: MULLEN, RICHARD 01-472404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING FNL CEM4401 -10,000.00 07 RECEIVED CEM4401 10,000.00 08 0.00 0.00 EQUAL EMPLOYMENT OPPORTUNITY MISSING CEM2402F -10,000.00 07 RECEIVED CEM2402F 10,000.00 08 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 11/09/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-472404 TIME 01:56 PM ESTIMATE NO. 09 BID OPENING 10/27/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/17/10 R.E. NAME: MULLEN, RICHARD DATE OF THIS ESTIMATE 11/09/10 LOCATION FINAL ESTIMATE 01-HUM-96-23.0/23.8 -------------- R BROWN CONSTRUCTION COMPANY IN HUMBOLDT COUNTY NEAR WEITCHPEC INC FROM 0.1 MILE TO 0.9 MILE EAST OF P O BOX 406 ROUTE 169 WILLOW CREEK CA 95573 FED. AID NO. ER-4318(4)E INSTALL GALLERY DRAINAGE WALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 750.00 0.000 0.00 02 TEMPORARY FENCE (TYPE ESA) LF 5.0000 3,400.00 680.000 3,400.00 03 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 1.000 2,000.00 04 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 1.000 2,000.00 PREVENTION PLAN 05 TEMPORARY FIBER ROLL LF 3.5000 1,260.00 360.000 1,260.00 06 TEMPORARY SILT FENCE LF 5.0000 200.00 40.000 200.00 07 TEMPORARY CONSTRUCTION ENTRANCE EA 500.0000 1,000.00 2.000 1,000.00 08 TEMPORARY COVER SQFT 0.5000 720.00 1,440.000 720.00 09 TEMPORARY CHECK DAM LF 4.0000 380.00 95.000 380.00 10 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 1,000.00 2.000 400.00 11 STREET SWEEPING LS 1,000.0000 1,000.00 1.000 1,000.00 12 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 13 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 1.000 3,000.00 14 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 1.000 50,000.00 15 PORTABLE CHANGEABLE MESSAGE SIGN LS 9,000.0000 9,000.00 1.000 9,000.00 16 ABANDON CULVERT LF 20.0000 520.00 26.000 520.00 17 REMOVE MARKER EA 50.0000 350.00 7.000 350.00 18 REMOVE CULVERT LF 7.7000 2,002.00 260.000 2,002.00 19 REMOVE INLET EA 250.0000 750.00 3.000 750.00 20 REMOVE HEADWALL EA 250.0000 750.00 3.000 750.00 21 REMOVE DOWNDRAIN LF 23.0000 483.00 21.000 483.00 22 RECONSTRUCT METAL BEAM GUARD RAILING LF 23.5000 10,575.00 450.000 10,575.00 PROGRAM CAS145 PAGE 2 DATE 11/09/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-472404 TIME 01:56 PM ESTIMATE NO. 09 BID OPENING 10/27/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/17/10 R.E. NAME: MULLEN, RICHARD DATE OF THIS ESTIMATE 11/09/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 RELOCATE ROADSIDE SIGN-ONE POST EA 250.0000 500.00 2.000 500.00 24 RELOCATE ROADSIDE SIGN-TWO POST EA 300.0000 300.00 1.000 300.00 25 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 26 ROADWAY EXCAVATION CY 12.5000 14,625.00 300.000 3,750.00 27 LEAD COMPLIANCE PLAN LS 2,150.0000 2,150.00 1.000 2,150.00 28 SAND BACKFILL CY 162.0000 486.00 3.000 486.00 29 DITCH EXCAVATION CY 30.0000 3,300.00 110.000 3,300.00 30 EROSION CONTROL (TYPE D) SQYD 4.5000 4,050.00 1,800.000 8,100.00 31 CLASS 2 AGGREGATE BASE CY 66.2500 52,337.50 0.000 0.00 32 HOT MIX ASPHALT (TYPE A) TON 125.0000 118,750.00 550.000 68,750.00 33 DATA CORE LS 3,000.0000 3,000.00 1.000 3,000.00 34 TACK COAT TON 800.0000 3,200.00 4.000 3,200.00 35 MINOR CONCRETE (MINOR STRUCTURE) CY 1,200.0000 3,960.00 7.830 9,396.00 F) 36 24" CORRUGATED STEEL PIPE (.138" THICK) LF 287.5000 74,750.00 198.000 56,925.00 37 30" CORRUGATED STEEL PIPE (.109" THICK) LF 81.0000 2,916.00 36.000 2,916.00 38 18" CORRUGATED STEEL PIPE (.138" THICK) LF 125.0000 500.00 4.000 500.00 39 6" CORRUGATED STEEL PIPE LF 11.5000 897.00 100.000 1,150.00 (WATER LINE CONDUIT) 40 8" PERFORATED STEEL PIPE UNDERDRAIN LF 35.4500 54,947.50 1,162.500 41,210.63 41 24" CORRUGATED STEEL PIPE DOWNDRAIN LF 41.2500 2,722.50 66.000 2,722.50 (.109" THICK) 42 ANCHOR ASSEMBLY EA 3,000.0000 3,000.00 1.000 3,000.00 43 24" WELDED STEEL PIPE (.250" THICK) LF 358.0000 39,380.00 116.000 41,528.00 44 24" STEEL FLARED END SECTION EA 400.0000 400.00 0.000 0.00 45 36" PRECAST CONCRETE PIPE INLET LF 105.0000 3,150.00 0.000 0.00 46 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 88.2500 5,383.25 45.000 3,971.25 47 ROCK SLOPE PROTECTION FABRIC SQFT 0.5000 865.00 1,386.000 693.00 48 MISCELLANEOUS IRON AND STEEL LB 1.2500 722.50 2,764.480 3,455.60 F) 49 MILEPOST MARKER EA 100.0000 200.00 2.000 200.00 PROGRAM CAS145 PAGE 3 DATE 11/09/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-472404 TIME 01:56 PM ESTIMATE NO. 09 BID OPENING 10/27/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/17/10 R.E. NAME: MULLEN, RICHARD DATE OF THIS ESTIMATE 11/09/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 UNDERDRAIN MARKER EA 100.0000 600.00 6.000 600.00 51 MARKER (CULVERT) EA 100.0000 1,400.00 14.000 1,400.00 52 VEGETATION CONTROL (MINOR CONCRETE) SQYD 50.0000 12,000.00 240.000 12,000.00 53 TRANSITION RAILING (TYPE WB) EA 3,500.0000 3,500.00 0.000 0.00 54 TERMINAL SYSTEM (TYPE SRT) EA 2,500.0000 2,500.00 1.000 2,500.00 55 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 2,500.00 1.000 2,500.00 56 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.3500 6,439.50 3,578.000 4,830.30 57 PAVEMENT MARKER EA 25.5000 3,570.00 105.000 2,677.50 (RETROREFLECTIVE-RECESSED) 58 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 1.000 500.00 SYSTEM ELEMENTS DURING CONSTRUCTION 59 WATER LINE VALVE BOX EA 400.0000 800.00 2.000 800.00 PROGRAM CAS145 PAGE 4 DATE 11/09/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-472404 TIME 01:56 PM ESTIMATE NO. 09 BID OPENING 10/27/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/17/10 R.E. NAME: MULLEN, RICHARD DATE OF THIS ESTIMATE 11/09/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 384,801.78 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 216,681.03 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 601,482.81 60 MOBILIZATION LS 52,000.0000 52,000.00 1.000 52,000.00 ORIGINAL CONTRACT AMOUNT 579,441.75 TOTAL WORK COMPLETED 0.00 653,482.81 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 653,482.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/30/09 70 06/14/10 12/15/09 09/17/10 56 134 0 0 100% 100% MULLEN, RICHARD RESIDENT ENGINEER PROGRAM CAS145 DATE 11/09/10