PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/23/15 EST. NO. 001 TIME 10:55 AM R.E. NAME: LEES, CHUCK 01-474904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/23/15 EST. NO. 001 TIME 10:55 AM R.E. NAME: LEES, CHUCK 01-474904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 3/15 -1,000.00 001 -1,000.00 -1,000.00 TOTAL DEDUCTIONS -1,000.00 -1,000.00 PROGRAM CAS145 PAGE 1 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 LOCATION PROGRESS ESTIMATE 01-MEN-1-70.5/ .0 ----------------- GRANITE CONSTRUCTION COMPANY IN MENDOCINO COUNTY NEAR WESTPORT 1324 S. STATE STREET FROM 0.8 MI NORTH OF TEN MILE RIVER UKIAH CA 95482 BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE FED. AID NO. ER-43M6(4)E REPAIR STORM DAMAGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,300.0000 2,300.00 1.000 2,300.00 1.000 2,300 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,200.0000 372,000.00 25.000 30,000.00 25.000 30,000 003 CONSTRUCTION AREA SIGNS LS 4,200.0000 4,200.00 0.750 3,150.00 0.750 3,150 004 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 0.080 4,800.00 0.080 4,800 005 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 10.0000 990.00 0.000 0 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 4,610.00 0.000 0 007 CHANNELIZER (SURFACE MOUNTED) EA 2.0000 16.00 0.000 0 008 TEMPORARY SIGNAL AND LIGHTING LS 210,000.0000 210,000.00 0.750 157,500.00 0.750 157,500 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 0.080 1,200.00 0.080 1,200 010 TEMPORARY RAILING (TYPE K) LF 25.0000 24,000.00 0.000 0 011 TEMPORARY CRASH CUSHION MODULE EA 150.0000 1,650.00 0.000 0 012 ALTERNATIVE TEMPORARY CRASH CUSHION EA 2,000.0000 4,000.00 0.000 0 013 JOB SITE MANAGEMENT LS 15,000.0000 15,000.00 0.080 1,200.00 0.080 1,200 014 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000 PLAN 015 RAIN EVENT ACTION PLAN EA 500.0000 37,000.00 0.000 0 016 STORM WATER SAMPLING AND ANALYSIS DAY EA 600.0000 27,000.00 0.000 0 017 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 018 TEMPORARY EROSION CONTROL BLANKET SQYD 4.8500 13,240.50 0.000 0 019 MOVE-IN/MOVE-OUT EA 1,250.0000 11,250.00 1.000 1,250.00 1.000 1,250 (TEMPORARY EROSION CONTROL) 020 TEMPORARY HYDRAULIC MULCH SQYD 0.5500 1,545.50 1,111.000 611.05 1,111.000 611 021 TEMPORARY COVER SQYD 4.0000 11,240.00 0.000 0 022 TEMPORARY DRAINAGE INLET PROTECTION EA 175.0000 175.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY FIBER ROLL LF 3.0500 18,208.50 325.000 991.25 325.000 991 024 TEMPORARY GRAVEL BAG BERM LF 9.5000 1,140.00 15.000 142.50 15.000 142 025 TEMPORARY LARGE SEDIMENT BARRIER LF 18.8000 19,176.00 0.000 0 026 TEMPORARY CONSTRUCTION ENTRANCE EA 2,500.0000 7,500.00 0.000 0 027 STREET SWEEPING LS 18,000.0000 18,000.00 0.080 1,440.00 0.080 1,440 028 TEMPORARY CONCRETE WASHOUT LS 2,700.0000 2,700.00 0.000 0 029 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 1,040.0000 18,720.00 0.000 0 030 WATER QUALITY MONITORING REPORT EA 570.0000 10,260.00 0.000 0 031 TEMPORARY FENCE (TYPE ESA) LF 2.2000 4,884.00 3,200.000 7,040.00 3,200.000 7,040 032 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 4,480.00 0.000 0 STRIPE (HAZARDOUS WASTE) 033 ABANDON CULVERT (LF) LF 20.0000 600.00 0.000 0 034 REMOVE FENCE (TYPE WM) LF 4.0000 9,680.00 960.000 3,840.00 960.000 3,840 035 REMOVE GATE EA 300.0000 300.00 0.000 0 036 REMOVE MARKER EA 1.0000 1.00 1.000 1.00 1.000 1 037 REMOVE METAL BEAM GUARD RAILING LF 7.0000 2,520.00 0.000 0 038 REMOVE PAVEMENT MARKER EA 2.0000 188.00 0.000 0 039 REMOVE ROADSIDE SIGN (WOOD POST) EA 125.0000 875.00 0.000 0 040 REMOVE CULVERT (EA) EA 620.0000 620.00 0.000 0 041 REMOVE BASE AND SURFACING CY 5.0000 700.00 0.000 0 042 RESET ALTERNATIVE TEMPORARY CRASH EA 550.0000 1,100.00 0.000 0 CUSHION 043 RELOCATE ROADSIDE SIGN EA 200.0000 800.00 0.000 0 044 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 10.0000 3,200.00 0.000 0 045 RESET TEMPORARY RAILING (TYPE K) LF 4.0000 3,440.00 0.000 0 046 CLEARING AND GRUBBING (LS) LS 40,000.0000 40,000.00 0.250 10,000.00 0.250 10,000 047 ROADWAY EXCAVATION CY 35.0000 191,450.00 2,465.000 86,275.00 2,465.000 86,275 048 SHOULDER BACKING TON 48.0000 4,560.00 0.000 0 049 STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 30.0000 20,100.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 STRUCTURE BACKFILL (SOLDIER PILE WALL) CY 35.0000 12,845.00 0.000 0 (F) 051 CONCRETE BACKFILL (SOLDIER PILE WALL) CY 250.0000 131,500.00 0.000 0 (F) 052 LEAN CONCRETE BACKFILL CY 350.0000 86,800.00 0.000 0 (F) 053 IMPORTED BORROW (CY) CY 20.0000 42,400.00 0.000 0 054 GEOSYNTHETIC REINFORCED EMBANKMENT CY 25.0000 40,250.00 0.000 0 055 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,500.0000 7,500.00 0.000 0 056 EROSION CONTROL (BONDED FIBER MATRIX) SQFT 0.6000 9,000.00 0.000 0 (SQFT) 057 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.9500 14,250.00 0.000 0 058 HYDROMULCH SQFT 0.0500 1,850.00 9,000.000 450.00 9,000.000 450 059 FIBER ROLLS LF 4.2500 4,250.00 0.000 0 060 STRAW SQFT 0.0600 1,680.00 9,000.000 540.00 9,000.000 540 061 HYDROSEED SQFT 0.1400 5,180.00 9,000.000 1,260.00 9,000.000 1,260 062 COMPOST SQFT 0.6200 22,940.00 9,000.000 5,580.00 9,000.000 5,580 063 INCORPORATE MATERIALS SQFT 0.4200 3,780.00 0.000 0 064 CLASS 2 AGGREGATE BASE (CY) CY 50.0000 133,000.00 968.000 48,400.00 968.000 48,400 065 HOT MIX ASPHALT (TYPE A) TON 130.0000 335,400.00 403.600 52,468.00 403.600 52,468 066 HOT MIX ASPHALT (OPEN GRADED) TON 130.0000 37,700.00 0.000 0 067 CENTERLINE RUMBLE STRIP STA 400.0000 4,400.00 0.000 0 068 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 10.5000 1,680.00 0.000 0 069 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 10.5000 4,410.00 0.000 0 070 PLACE HOT MIX ASPHALT SQYD 100.0000 300.00 0.000 0 (MISCELLANEOUS AREA) 071 TACK COAT TON 1,200.0000 2,400.00 0.000 0 072 GROUND ANCHOR (SUBHORIZONTAL) EA 4,500.0000 540,000.00 0.000 0 073 36" DRILLED HOLE LF 85.0000 228,650.00 0.000 0 074 STEEL SOLDIER PILE(W14X74) LF 97.0000 649,609.00 0.000 0 075 STRUCTURAL CONCRETE,PILASTER CY 1,400.0000 145,600.00 0.000 0 (F) 076 STRUCTURAL CONCRETE, BARRIER SLAB CY 950.0000 290,700.00 0.000 0 (F) PROGRAM CAS145 PAGE 4 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 BAR REINFORCING STEEL (EPOXY COATED) LB 5.0000 45,795.00 0.000 0 (F) 078 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 702.00 0.000 0 (0.063"-UNFRAMED) 079 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 416.00 0.000 0 (0.080"-UNFRAMED) 080 METAL (ROADSIDE SIGN) LB 10.0000 250.00 0.000 0 081 METAL (RAIL MOUNTED SIGN) LB 15.0000 2,400.00 0.000 0 082 ROADSIDE SIGN - ONE POST EA 247.0000 2,223.00 0.000 0 083 TREATED TIMBER LAGGING MFBM 2,600.0000 174,200.00 0.000 0 (F) 084 CLEAN AND PAINT STEEL SOLDIER PILING LS 100,000.0000 100,000.00 0.000 0 085 8"PLASTIC PIPE LF 4.0000 120.00 0.000 0 086 48" REINFORCED CONCRETE PIPE LF 500.0000 15,000.00 0.000 0 087 8"PERFORATED PLASTIC PIPE UNDERDRAIN LF 4.0000 1,840.00 0.000 0 (DEEP) 088 CLASS 1 PERMEABLE MATERIAL(TYPE B) CY 65.0000 17,420.00 0.000 0 089 CLASS 1 PERMEABLE MATERIAL (BLANKET) CY 85.0000 16,320.00 0.000 0 090 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 180.0000 2,520.00 0.000 0 091 12" ENTRANCE TAPER EA 350.0000 350.00 0.000 0 092 12" DOWNDRAIN SLIP JOINT EA 300.0000 300.00 0.000 0 093 12" ANCHOR ASSEMBLY EA 130.0000 130.00 0.000 0 094 48" CONCRETE FLARED END SECTION EA 3,400.0000 3,400.00 0.000 0 095 DELINEATOR (CLASS 1) EA 50.0000 2,600.00 0.000 0 096 MILEPOST MARKER EA 50.0000 50.00 0.000 0 097 MARKER (CULVERT) EA 50.0000 100.00 0.000 0 098 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 27.0000 15,120.00 0.000 0 099 VEGETATION CONTROL (MINOR CONCRETE) SQYD 75.0000 21,000.00 0.000 0 100 TRANSITION RAILING (TYPE WB-31) EA 4,550.0000 9,100.00 0.000 0 101 END CAP (TYPE TC) EA 250.0000 500.00 0.000 0 102 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,075.0000 6,150.00 0.000 0 103 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,575.0000 5,150.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 CALIFORNIA ST-10 BRIDGE RAIL(MODIFIED) LF 265.0000 191,860.00 0.000 0 (F) WITH BICYCLE RAILING 105 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 7,320.00 0.000 0 106 THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 470.00 0.000 0 107 PAINT PAVEMENT MARKING (2-COAT) SQFT 7.5000 1,200.00 0.000 0 108 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 800.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 03/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-474904 TIME 10:55 AM ESTIMATE NO. 001 BID OPENING 06/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/15 R.E. NAME: LEES, CHUCK DATE OF THIS ESTIMATE 03/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 423,438.80 423,438.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 423,438.80 423,438.80 109 MOBILIZATION LS 500,000.0000 500,000.00 0.750 375,000.00 0.750 375,000 ORIGINAL CONTRACT AMOUNT 5,110,299.50 TOTAL WORK COMPLETED 798,438.80 798,438.80 MATERIALS ON HAND ON SITE 391,647.47 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -1,000.00 -1,000.00 TOTAL 797,438.80 1,189,086.27 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/06/14 250 03/02/15 09/30/14 02/25/16 18 97 0 0 16% 7% PROGRESS IS SATISFACTORY LEES, CHUCK RESIDENT ENGINEER PROGRAM CAS145 DATE 03/23/15