PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/22/10 EST. NO.01 TIME 02:38 PM R.E. NAME: KLEIBER, KATHERINE 01-476404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/22/10 EST. NO.01 TIME 02:38 PM R.E. NAME: KLEIBER, KATHERINE 01-476404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-476404 TIME 02:38 PM ESTIMATE NO. 01 BID OPENING 03/09/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/18/10 R.E. NAME: KLEIBER, KATHERINE DATE OF THIS ESTIMATE 06/22/10 LOCATION PROGRESS ESTIMATE 01-MEN-162-19.7/30.0 ----------------- GRANITE CONSTRUCTION COMPANY IN MENDOCINO COUNTY NEAR COVELO P O BOX 50085 AT VARIOUS LOCATIONS WATSONVILLE CA 95077 FED. AID NO. ER-43J5(4)E REPAIR STORM DAMAGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 TEMPORARY FENCE (TYPE ESA) LF 2.8000 1,568.00 0.000 0.00 03 CONSTRUCTION SITE MANAGEMENT LS 1,200.0000 1,200.00 0.000 0.00 04 PREPARE WATER POLLUTION CONTROL LS 1,200.0000 1,200.00 0.000 0.00 PROGRAM 05 TEMPORARY FIBER ROLL LF 2.9000 2,320.00 0.000 0.00 06 TEMPORARY SILT FENCE LF 3.5000 4,515.00 0.000 0.00 07 TEMPORARY GRAVEL BAG BERM LF 6.0000 5,460.00 0.000 0.00 08 TEMPORARY CHECK DAM LF 7.0000 1,260.00 0.000 0.00 09 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 300.00 0.000 0.00 10 STREET SWEEPING LS 5,500.0000 5,500.00 0.000 0.00 11 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 0.000 0.00 12 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.000 0.00 13 TRAFFIC CONTROL SYSTEM LS 44,000.0000 44,000.00 0.000 0.00 14 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,500.0000 7,500.00 0.000 0.00 15 TEMPORARY RAILING (TYPE K) LF 45.0000 41,400.00 0.000 0.00 16 TEMPORARY CRASH CUSHION EA 500.0000 3,000.00 0.000 0.00 (TYPE ABSORB 350) 17 REMOVE CULVERT LF 8.0000 1,040.00 0.000 0.00 18 ROADWAY EXCAVATION CY 18.0000 40,860.00 0.000 0.00 19 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 0.500 900.00 0.500 900.00 20 ASBESTOS COMPLIANCE PLAN LS 3,020.0000 3,020.00 0.000 0.00 (NATURALLY OCCURING ASBESTOS) 21 DUST CONTROL PLAN LS 1,300.0000 1,300.00 0.330 429.00 0.330 429.00 (NATURALLY OCCURRING ASBESTOS) 22 SAMPLING AND ANALYSIS PLAN LS 6,800.0000 6,800.00 1.000 6,800.00 1.000 6,800.00 (NATURALLY OCCURRING ASBESTOS) PROGRAM CAS145 PAGE 2 DATE 06/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-476404 TIME 02:38 PM ESTIMATE NO. 01 BID OPENING 03/09/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/18/10 R.E. NAME: KLEIBER, KATHERINE DATE OF THIS ESTIMATE 06/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 GEOSYNTHETIC REINFORCEMENT SQYD 18.0000 37,800.00 0.000 0.00 24 EROSION CONTROL (TYPE D) SQYD 2.5000 3,425.00 0.000 0.00 25 CLASS 2 AGGREGATE SUBBASE CY 30.0000 11,700.00 0.000 0.00 26 CLASS 2 AGGREGATE BASE CY 28.0000 13,440.00 0.000 0.00 27 HOT MIX ASPHALT (TYPE A) TON 115.0000 69,000.00 0.000 0.00 28 MINOR CONCRETE (MINOR STRUCTURE) CY 1,550.0000 9,920.00 0.000 0.00 F) 29 8" PLASTIC PIPE LF 18.0000 2,700.00 0.000 0.00 30 18" CORRUGATED STEEL PIPE (.138" THICK) LF 155.0000 23,250.00 0.000 0.00 31 12" PERFORATED PLASTIC PIPE UNDERDRAIN LF 50.0000 36,500.00 0.000 0.00 32 8" PERFORATED PLASTIC PIPE UNDERDRAIN LF 60.0000 18,000.00 0.000 0.00 33 18" STEEL FLARED END SECTION EA 400.0000 800.00 0.000 0.00 34 ROCK SLOPE PROTECTION CY 750.0000 2,550.00 0.000 0.00 (FACING, METHOD B) 35 ROCK SLOPE PROTECTION FABRIC SQYD 4.0000 64.00 0.000 0.00 36 MISCELLANEOUS IRON AND STEEL LB 2.0000 1,912.00 0.000 0.00 F) 37 UNDERDRAIN MARKER EA 135.0000 270.00 0.000 0.00 38 MARKER (CULVERT) EA 135.0000 270.00 0.000 0.00 39 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 4,110.00 0.000 0.00 40 PAVEMENT MARKER EA 63.0000 3,528.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 3 DATE 06/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-476404 TIME 02:38 PM ESTIMATE NO. 01 BID OPENING 03/09/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/18/10 R.E. NAME: KLEIBER, KATHERINE DATE OF THIS ESTIMATE 06/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 8,129.00 8,129.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,129.00 8,129.00 41 MOBILIZATION LS 35,920.0000 35,920.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 452,452.00 TOTAL WORK COMPLETED 8,129.00 8,129.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 8,129.00 8,129.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/20/10 60 00/00/00 05/05/10 09/30/10 0 32 0 0 2% 0% PROGRESS IS SATISFACTORY *** SUSPENDED ON 05/05/10. KLEIBER, KATHERINE RESIDENT ENGINEER PROGRAM CAS145 DATE 06/22/10