PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/21/10 EST. NO.04 TIME 09:03 AM R.E. NAME: QUINTRELL, HEIDI 01-482804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/21/10 EST. NO.04 TIME 09:03 AM R.E. NAME: QUINTRELL, HEIDI 01-482804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-482804 TIME 09:03 AM ESTIMATE NO. 04 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: QUINTRELL, HEIDI DATE OF THIS ESTIMATE 12/21/10 LOCATION PROGRESS ESTIMATE 01-VAR ----------------- PETERSON CHASE GENERAL IN DEL NORTE AND HUMBOLDT COUNTIES ENGINEERING CONSTRUCTION INC AT VARIOUS LOCATIONS 1792 KAISER AVE IRVINE CA 92614 FED. AID NO. N O N E REPAIR BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 750.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 1,800.0000 1,800.00 0.300 540.00 03 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 0.900 720.00 PROGRAM 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 250.0000 250.00 1.000 250.00 05 CONSTRUCTION AREA SIGNS LS 8,500.0000 8,500.00 1.000 8,500.00 06 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.300 9,000.00 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,600.0000 2,600.00 0.300 780.00 08 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.6500 6,204.00 3,350.000 5,527.50 STRIPE (HAZARDOUS WASTE) 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 2,104.00 2,675.000 2,140.00 10 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.8500 14,988.70 0.000 0.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.5000 9,350.00 0.000 0.00 12 REMOVE UNSOUND CONCRETE CF 50.0000 9,050.00 42.300 2,115.00 176.300 8,815.00 13 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5000 4,051.00 0.000 0.00 14 CLEAN BRIDGE DECK SQFT 0.2500 16,145.75 64,163.000 16,040.75 15 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.700 1,400.00 16 HOT MIX ASPHALT (TYPE A) TON 185.0000 23,125.00 0.000 0.00 17 CLEAN EXPANSION JOINT LF 20.0000 1,440.00 76.000 1,520.00 18 RAPID SETTING CONCRETE (PATCH) CF 50.0000 9,050.00 42.300 2,115.00 176.300 8,815.00 19 FURNISH POLYESTER CONCRETE OVERLAY CF 77.0000 143,374.00 0.000 0.00 20 PLACE POLYESTER CONCRETE OVERLAY SQFT 2.2500 18,229.50 0.000 0.00 F) 21 JOINT SEAL (MR 2") LF 60.0000 4,320.00 76.000 4,560.00 S) 22 TREAT BRIDGE DECK SQFT 0.2600 16,791.58 64,163.000 16,682.38 F) PROGRAM CAS145 PAGE 2 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-482804 TIME 09:03 AM ESTIMATE NO. 04 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: QUINTRELL, HEIDI DATE OF THIS ESTIMATE 12/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 46.0000 33,074.00 725.000 33,350.00 24 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 3,874.50 0.000 0.00 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 101.50 0.000 0.00 (BROKEN 36-12) 26 PAINT TRAFFIC STRIPE (1-COAT) LF 0.4500 625.50 0.000 0.00 27 PAVEMENT MARKER (NON-REFLECTIVE) EA 11.0000 550.00 0.000 0.00 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 840.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 12/21/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-482804 TIME 09:03 AM ESTIMATE NO. 04 BID OPENING 05/11/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/10 R.E. NAME: QUINTRELL, HEIDI DATE OF THIS ESTIMATE 12/21/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,230.00 118,640.63 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 11,187.41 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,230.00 129,828.04 29 MOBILIZATION LS 30,000.0000 30,000.00 0.950 28,500.00 ORIGINAL CONTRACT AMOUNT 393,989.03 TOTAL WORK COMPLETED 4,230.00 158,328.04 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,230.00 158,328.04 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/10 120 09/15/10 07/07/10 02/24/11 73 41 0 0 31% 61% PROGRESS IS SATISFACTORY QUINTRELL, HEIDI RESIDENT ENGINEER PROGRAM CAS145 DATE 12/21/10