PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/23/08 EST. NO.02 TIME 11:54 AM R.E. NAME: KRAFT, DAN 01-488204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/23/08 EST. NO.02 TIME 11:54 AM R.E. NAME: KRAFT, DAN 01-488204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LIQUIDATED DAMAGES ANT LD'S @ 2500/DAY -25,000.00 02 -25,000.00 -25,000.00 TOTAL DEDUCTIONS -25,000.00 -25,000.00 PROGRAM CAS145 PAGE 1 DATE 12/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-488204 TIME 11:54 AM ESTIMATE NO. 02 BID OPENING 10/16/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/19/08 R.E. NAME: KRAFT, DAN DATE OF THIS ESTIMATE 12/23/08 LOCATION RERUN PROGRESS ESTIMATE 01-LAK-29-7.4/7.6 ----------------------- ARGONAUT CONSTRUCTORS IN LAKE COUNTY NEAR MIDDLETOWN P O BOX 639 FROM 0.6 TO 0.8 MILE NORTH OF SANTA ROSA CA 95402 LUPIYOMA CREEK BRIDGE FED. AID NO. N O N E REPAIR SLIDE AND PLACE ROCK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.330 165.00 0.660 330.00 02 PREPARE WATER POLLUTION CONTROL LS 550.0000 550.00 0.750 412.50 PROGRAM 03 TEMPORARY GRAVEL BAG BERM LF 45.0000 675.00 18.000 810.00 04 TEMPORARY CHECK DAM LF 23.0000 1,150.00 25.000 575.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 215.0000 215.00 1.000 215.00 06 STREET SWEEPING LS 1,000.0000 1,000.00 0.330 330.00 0.660 660.00 07 CONSTRUCTION AREA SIGNS LS 2,875.0000 2,875.00 0.750 2,156.25 S) 08 TRAFFIC CONTROL SYSTEM LS 9,500.0000 9,500.00 0.550 5,225.00 0.840 7,980.00 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,300.0000 2,600.00 0.660 858.00 1.320 1,716.00 S) 10 RECONSTRUCT FENCE (TYPE BW) LF 20.0000 2,200.00 0.000 0.00 11 ROADWAY EXCAVATION CY 14.0000 32,060.00 3,617.000 50,638.00 3,767.000 52,738.00 12 DITCH EXCAVATION CY 26.0000 2,600.00 0.000 0.00 13 EROSION CONTROL (TYPE D) ACRE 7,000.0000 2,800.00 0.000 0.00 S) 14 CLASS 2 AGGREGATE BASE CY 200.0000 2,400.00 0.000 0.00 15 HOT MIX ASPHALT (TYPE A) TON 210.0000 6,090.00 0.000 0.00 16 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 9.0000 1,440.00 0.000 0.00 17 PLACE HOT MIX ASPHALT SQFT 14.0000 840.00 0.000 0.00 (MISCELLANEOUS AREA) 18 8" PLASTIC PIPE (OUTLET) LF 25.0000 7,250.00 0.000 0.00 19 8" PERFORATED PLASTIC PIPE LF 9.0000 1,440.00 0.000 0.00 20 FURNISH AND INSTALL DRAIN PIPE LF 1.5000 3,855.00 378.500 567.75 2,367.700 3,551.55 (HORIZONTAL DRAIN) 21 DRILL HOLE (HORIZONTAL DRAIN) LF 22.7000 57,658.00 391.000 8,875.70 2,387.000 54,184.90 22 CLASS 1 PERMEABLE MATERIAL CY 122.0000 2,806.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 12/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-488204 TIME 11:54 AM ESTIMATE NO. 02 BID OPENING 10/16/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/19/08 R.E. NAME: KRAFT, DAN DATE OF THIS ESTIMATE 12/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CUSHION FABRIC AND IMPERMEABLE SQYD 6.5000 2,145.00 0.000 0.00 MEMBRANE 24 ROCK SLOPE PROTECTION (1 TON, METHOD A) CY 66.0000 94,380.00 2,302.000 151,932.00 2,302.000 151,932.00 25 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 90.0000 7,200.00 0.000 0.00 26 ROCK SLOPE PROTECTION CY 98.0000 18,620.00 0.000 0.00 (BACKING NO. 1, METHOD B) 27 ROCK SLOPE PROTECTION FABRIC SQYD 2.4000 2,304.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 12/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-488204 TIME 11:54 AM ESTIMATE NO. 02 BID OPENING 10/16/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/19/08 R.E. NAME: KRAFT, DAN DATE OF THIS ESTIMATE 12/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 218,591.45 277,261.20 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 218,591.45 277,261.20 28 MOBILIZATION LS 29,000.0000 29,000.00 0.050 1,450.00 1.000 29,000.00 ORIGINAL CONTRACT AMOUNT 296,153.00 TOTAL WORK COMPLETED 220,041.45 306,261.20 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -25,000.00 -25,000.00 TOTAL 195,041.45 281,261.20 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/16/08 30 10/23/08 10/17/08 01/15/08 30 5 0 0 80% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU TAKING LD'S KRAFT, DAN RESIDENT ENGINEER PROGRAM CAS145 DATE 12/23/08