PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/10 EST. NO.01 TIME 10:48 AM R.E. NAME: PASCAL, ANTHONY 02-1E1104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/10 EST. NO.01 TIME 10:48 AM R.E. NAME: PASCAL, ANTHONY 02-1E1104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-1E1104 TIME 10:48 AM ESTIMATE NO. 01 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/22/10 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 03/22/10 LOCATION PROGRESS ESTIMATE 02-SHA-5-R28.9/R29.3 ----------------- J F SHEA CONSTRUCTION INC IN SHASTA COUNTY NEAR SHASTA LAKE P O BOX 494519 FROM 0.4 MILE SOUTH TO TURNTABLE REDDING CA 96049 BAY OVERCROSSING FED. AID NO. ACHS-058(339)E ,IM-058(339)E REALIGN ROADWAY WITH HMA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 2,300.0000 2,300.00 0.000 0.00 03 PREPARE STORM WATER POLLUTION LS 2,800.0000 2,800.00 0.750 2,100.00 0.750 2,100.00 PREVENTION PLAN 04 TEMPORARY FIBER ROLL LF 5.0000 2,500.00 200.000 1,000.00 200.000 1,000.00 05 TEMPORARY CHECK DAM LF 5.0000 3,000.00 51.000 255.00 51.000 255.00 06 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 1,500.00 11.000 3,300.00 11.000 3,300.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,700.0000 2,700.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,500.00 09 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.220 4,400.00 0.220 4,400.00 10 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.2700 25,654.00 7,930.000 10,071.10 7,930.000 10,071.10 11 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 14.0000 1,820.00 126.000 1,764.00 126.000 1,764.00 12 CHANNELIZER (SURFACE MOUNTED) EA 50.0000 9,500.00 127.000 6,350.00 127.000 6,350.00 13 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,000.0000 4,000.00 0.220 880.00 0.220 880.00 14 PORTABLE RADAR TRAILER EA 1,500.0000 3,000.00 2.000 3,000.00 2.000 3,000.00 15 TEMPORARY RAILING (TYPE K) LF 9.0000 44,640.00 2,532.000 22,788.00 2,532.000 22,788.00 16 TEMPORARY CRASH CUSHION MODULE EA 250.0000 7,000.00 14.000 3,500.00 14.000 3,500.00 17 REMOVE MARKER EA 150.0000 450.00 0.000 0.00 18 REMOVE BARRIER MARKER EA 30.0000 510.00 0.000 0.00 19 REMOVE PAINTED TRAFFIC STRIPE LF 1.4000 4,970.00 0.000 0.00 20 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.6000 6,500.00 2,915.000 7,579.00 2,915.000 7,579.00 21 REMOVE PAVEMENT MARKER EA 12.0000 1,440.00 51.000 612.00 51.000 612.00 22 REMOVE ROADSIDE SIGN EA 110.0000 1,870.00 2.000 220.00 2.000 220.00 PROGRAM CAS145 PAGE 2 DATE 03/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-1E1104 TIME 10:48 AM ESTIMATE NO. 01 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/22/10 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 03/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE EDGE DRAIN SYSTEM LF 5.0000 9,800.00 0.000 0.00 24 REMOVE CULVERT LF 35.0000 2,555.00 0.000 0.00 25 REMOVE INLET EA 320.0000 1,920.00 0.000 0.00 26 RECONSTRUCT INLET EA 2,000.0000 2,000.00 0.000 0.00 27 RELOCATE PORTABLE CONCRETE BARRIER LF 15.0000 2,400.00 0.000 0.00 (TYPE 60K) 28 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 23.0000 15,870.00 522.220 12,011.06 522.220 12,011.06 29 REMOVE CONCRETE BARRIER LF 63.0000 26,460.00 0.000 0.00 30 CLEARING AND GRUBBING LS 25,000.0000 25,000.00 0.800 20,000.00 0.800 20,000.00 31 DEVELOP WATER SUPPLY LS 11,000.0000 11,000.00 0.000 0.00 32 ROADWAY EXCAVATION CY 8.3000 183,430.00 12,720.000 105,576.00 12,720.000 105,576.00 33 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 1.000 1,800.00 1.000 1,800.00 34 CONCRETE BACKFILL CY 150.0000 2,100.00 0.000 0.00 35 IMPORTED MATERIAL (SHOULDER BACKING) TON 60.0000 8,400.00 0.000 0.00 36 CLASS 2 AGGREGATE BASE CY 41.0000 250,920.00 0.000 0.00 37 HOT MIX ASPHALT (TYPE A) TON 83.0000 594,280.00 54.000 4,482.00 54.000 4,482.00 38 HOT MIX ASPHALT (OPEN GRADED) TON 96.0000 87,360.00 0.000 0.00 39 SHOULDER RUMBLE STRIP STA 176.0000 3,696.00 0.000 0.00 (HMA,GROUND-IN INDENTATIONS) 40 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 4.0000 4,440.00 0.000 0.00 41 PLACE HOT MIX ASPHALT SQYD 5.0000 5,950.00 0.000 0.00 (MISCELLANEOUS AREA) 42 TACK COAT TON 650.0000 1,820.00 0.172 111.80 0.172 111.80 43 MINOR CONCRETE (MINOR STRUCTURE) CY 1,200.0000 9,720.00 0.000 0.00 F) 44 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 33.0000 1,485.00 0.000 0.00 (0.080"-UNFRAMED) 45 METAL (BARRIER MOUNTED SIGN) LB 11.0000 3,850.00 0.000 0.00 46 ROADSIDE SIGN - ONE POST EA 600.0000 1,800.00 0.000 0.00 47 24" ALTERNATIVE PIPE CULVERT LF 66.0000 22,440.00 0.000 0.00 48 18" CORRUGATED STEEL PIPE (.079" THICK) LF 60.0000 7,800.00 0.000 0.00 49 24" CORRUGATED STEEL PIPE (.079" THICK) LF 150.0000 13,950.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 03/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-1E1104 TIME 10:48 AM ESTIMATE NO. 01 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/22/10 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 03/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 18" SLOTTED CORRUGATED STEEL PIPE LF 77.0000 13,090.00 0.000 0.00 (.079" THICK) 51 3" PLASTIC PIPE (EDGE DRAIN) LF 75.0000 2,775.00 0.000 0.00 52 36" CORRUGATED STEEL PIPE INLET LF 225.0000 3,825.00 0.000 0.00 (.079" THICK) 53 ROCK SLOPE PROTECTION CY 200.0000 4,600.00 0.000 0.00 (BACKING NO. 2, METHOD B) 54 ROCK SLOPE PROTECTION FABRIC SQYD 2.0000 176.00 0.000 0.00 55 MISCELLANEOUS IRON AND STEEL LB 2.0000 3,584.00 0.000 0.00 F) 56 DELINEATOR (CLASS 2) EA 60.0000 660.00 0.000 0.00 57 MILEPOST MARKER EA 100.0000 100.00 0.000 0.00 58 MARKER (CULVERT) EA 60.0000 420.00 0.000 0.00 59 CULVERT MARKER (BARRIER MOUNTED) EA 80.0000 400.00 0.000 0.00 60 CONCRETE BARRIER (TYPE 60) LF 275.0000 2,750.00 0.000 0.00 61 CONCRETE BARRIER (TYPE 60C) LF 120.0000 50,400.00 0.000 0.00 62 THERMOPLASTIC TRAFFIC STRIPE LF 0.3300 5,214.00 2,754.000 908.82 2,754.000 908.82 (SPRAYABLE) 63 PAVEMENT MARKER EA 11.0000 3,080.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) 64 TRAFFIC MONITORING STATION LS 3,000.0000 3,000.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 03/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-1E1104 TIME 10:48 AM ESTIMATE NO. 01 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/22/10 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 03/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 216,208.78 216,208.78 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 216,208.78 216,208.78 ORIGINAL CONTRACT AMOUNT 1,546,224.00 TOTAL WORK COMPLETED 216,208.78 216,208.78 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 216,208.78 216,208.78 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/12/10 45 03/01/10 03/08/10 05/11/10 11 0 0 0 14% 24% PROGRESS IS SATISFACTORY PASCAL, ANTHONY RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/10