PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/23/07 EST. NO.02 TIME 11:55 AM R.E. NAME: BLINE, JEFF 02-2C0604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/23/07 EST. NO.02 TIME 11:55 AM R.E. NAME: BLINE, JEFF 02-2C0604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C0604 TIME 11:55 AM ESTIMATE NO. 02 BID OPENING 05/15/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: BLINE, JEFF DATE OF THIS ESTIMATE 08/23/07 LOCATION RERUN PROGRESS ESTIMATE 02-TEH-36-28.8/30.0 ----------------------- JURIN CONSTRUCTION INC IN TEHAMA COUNTY ABOUT 16 KM WEST P O BOX 1434 OF RED BLUFF FROM 1.1 KM EAST OF WILLOW CREEK CA 95573 EAST LEG CANNON ROAD TO 2.1 KM WEST OF DIBBLE CREEK ROAD FED. AID NO. ACST-P036(82)E ,PH-P036(82)E CURVE IMPROVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 185,000.0000 185,000.00 0.750 138,750.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 10,000.0000 10,000.00 0.500 5,000.00 0.750 7,500.00 03 TEMPORARY FIBER ROLL M 15.0000 42,000.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500.00 05 CONSTRUCTION AREA SIGNS LS 7,000.0000 7,000.00 0.900 6,300.00 S) 06 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.850 25,500.00 1.000 30,000.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN EA 4,800.0000 19,200.00 2.000 9,600.00 S) 08 TEMPORARY FLASHING BEACON EA 3,500.0000 7,000.00 1.000 3,500.00 1.000 3,500.00 S) 09 OBLITERATE SURFACING M2 2.0000 9,320.00 4,660.000 9,320.00 4,660.000 9,320.00 10 REMOVE MARKER EA 20.0000 140.00 0.000 0.00 11 REMOVE ROADSIDE SIGN EA 150.0000 2,250.00 0.000 0.00 12 REMOVE CULVERT M 200.0000 4,800.00 23.300 4,660.00 23.300 4,660.00 13 REMOVE DOWNDRAIN M 200.0000 1,400.00 0.000 0.00 14 REMOVE DELINEATOR EA 50.0000 700.00 0.000 0.00 15 RELOCATE MAILBOX EA 200.0000 400.00 1.000 200.00 1.000 200.00 16 REPLACE PANEL EA 500.0000 500.00 0.000 0.00 17 CLEARING AND GRUBBING LS 20,000.0000 20,000.00 1.000 20,000.00 18 DEVELOP WATER SUPPLY LS 5,000.0000 5,000.00 1.000 5,000.00 19 DUST PALLIATIVE (STABILIZING EMULSION) TONN 1,000.0000 4,000.00 0.000 0.00 20 ROADWAY EXCAVATION M3 10.0000 464,000.00 31,400.000 314,000.00 46,400.000 464,000.00 21 DITCH EXCAVATION M3 12.0000 5,280.00 330.000 3,960.00 330.000 3,960.00 22 IMPORTED MATERIAL (SHOULDER BACKING) M3 65.0000 22,750.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C0604 TIME 11:55 AM ESTIMATE NO. 02 BID OPENING 05/15/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: BLINE, JEFF DATE OF THIS ESTIMATE 08/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 EROSION CONTROL (BLANKET) M2 2.0000 44,800.00 0.000 0.00 S) 24 STRAW (EROSION CONTROL) TONN 240.0000 4,560.00 0.000 0.00 S) 25 FIBER (EROSION CONTROL) KG 1.0000 1,710.00 0.000 0.00 S) 26 COMPOST (EROSION CONTROL) M3 207.0000 2,691.00 0.000 0.00 S) 27 PURE LIVE SEED (EROSION CONTROL) KG 53.0000 17,755.00 0.000 0.00 S) 28 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 0.6000 342.00 0.000 0.00 S) 29 STABILIZING EMULSION (EROSION CONTROL) KG 3.0000 1,995.00 0.000 0.00 S) 30 CLASS 2 AGGREGATE BASE M3 65.0000 340,600.00 0.000 0.00 31 ASPHALT CONCRETE (TYPE A) TONN 95.0000 518,700.00 0.000 0.00 32 PLACE ASPHALT CONCRETE DIKE M 25.0000 23,500.00 0.000 0.00 33 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 200.0000 3,800.00 0.000 0.00 AREA) 34 CLASS 1 CONCRETE (MINOR STRUCTURE) M3 1,300.0000 29,640.00 22.800 29,640.00 F) 35 MINOR CONCRETE (MINOR STRUCTURE) M3 1,300.0000 2,860.00 2.200 2,860.00 2.200 2,860.00 F) 36 ROADSIDE SIGN - ONE POST EA 300.0000 900.00 0.000 0.00 37 600 MM ALTERNATIVE PIPE CULVERT M 390.0000 93,600.00 173.000 67,470.00 215.000 83,850.00 38 1050 MM ALTERNATIVE PIPE CULVERT M 700.0000 14,700.00 21.000 14,700.00 21.000 14,700.00 39 600 MM STEEL FLARED END SECTION EA 500.0000 2,500.00 4.000 2,000.00 4.000 2,000.00 40 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 100.0000 43,000.00 79.600 7,960.00 375.600 37,560.00 41 COBBLE AND GRAVEL RIPRAP M3 120.0000 39,600.00 250.000 30,000.00 250.000 30,000.00 (75 MM, METHOD B) 42 ROCK SLOPE PROTECTION M3 120.0000 21,600.00 135.000 16,200.00 135.000 16,200.00 (BACKING NO. 2, METHOD B) 43 ROCK SLOPE PROTECTION FABRIC M2 3.0000 2,550.00 279.300 837.90 734.700 2,204.10 44 MISCELLANEOUS IRON AND STEEL KG 4.0000 1,296.00 0.000 0.00 SF) 45 DELINEATOR (CLASS 1) EA 50.0000 1,550.00 0.000 0.00 S) 46 MILEPOST MARKER EA 47.0000 94.00 0.000 0.00 S) 47 MARKER (CULVERT) EA 40.0000 640.00 0.000 0.00 S) 48 GUARD RAILING DELINEATOR EA 75.0000 150.00 0.000 0.00 S) 49 METAL BEAM GUARD RAILING M 90.0000 32,400.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C0604 TIME 11:55 AM ESTIMATE NO. 02 BID OPENING 05/15/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: BLINE, JEFF DATE OF THIS ESTIMATE 08/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CABLE RAILING M 200.0000 3,200.00 0.000 0.00 S) 51 THERMOPLASTIC TRAFFIC STRIPE M 1.8500 8,528.50 0.000 0.00 S) (SPRAYABLE) 52 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 4,200.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 08/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C0604 TIME 11:55 AM ESTIMATE NO. 02 BID OPENING 05/15/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: BLINE, JEFF DATE OF THIS ESTIMATE 08/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 510,667.90 924,304.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 510,667.90 924,304.10 53 MOBILIZATION LS 50,000.0000 50,000.00 0.200 10,000.00 0.950 47,500.00 ORIGINAL CONTRACT AMOUNT 2,156,701.50 TOTAL WORK COMPLETED 520,667.90 971,804.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 520,667.90 971,804.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/07 85 06/25/07 07/03/07 11/02/07 34 0 0 0 45% 40% PROGRESS IS SATISFACTORY PER RE REQUEST BLINE, JEFF RESIDENT ENGINEER PROGRAM CAS145 DATE 08/23/07