PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/06/08 EST. NO.06 TIME 02:17 PM R.E. NAME: BADE, TIM 02-2C2604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/06/08 EST. NO.06 TIME 02:17 PM R.E. NAME: BADE, TIM 02-2C2604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR 08/08 -5,000.00 03 PER 10/08 LETTER -2,000.00 05 RTN 09/08 DEDUCT -5,000.00 05 RETURN 9/08 DEDUCT 10,000.00 06 10,000.00 -2,000.00 TOTAL DEDUCTIONS 10,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 11/06/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C2604 TIME 02:17 PM ESTIMATE NO. 06 BID OPENING 08/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: BADE, TIM DATE OF THIS ESTIMATE 11/06/08 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 02-SHA-299-14.2/ .0 ------------------------------ TRUESDELL CORPORATION OF IN SHASTA, SISKIYOU AND TEHAMA CALIFORNIA INC COUNTIES AT VARIOUS LOCATIONS 1310 W 23RD STREET TEMPE AZ 85282 FED. AID NO. N O N E REHABILITATE BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.500 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.750 1,125.00 PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 04 CONSTRUCTION AREA SIGNS LS 7,125.0000 7,125.00 0.700 4,987.50 S) 05 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.600 24,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,900.0000 5,800.00 1.200 3,480.00 S) 07 REMOVE METAL BEAM GUARD RAILING M 38.0000 4,560.00 0.000 0.00 S) 08 REMOVE ASPHALT CONCRETE DIKE M 58.0000 9,860.00 10.500 609.00 09 REMOVE ASPHALT CONCRETE SURFACING M2 9.0000 43,434.00 4,659.000 41,931.00 10 RECONSTRUCT METAL BEAM GUARD RAILING M 100.0000 23,000.00 0.000 0.00 S) (WOOD POST) 11 ADJUST OVERSIDE DRAIN EA 550.0000 550.00 0.000 0.00 12 ADJUST FRAME AND GRATE TO GRADE EA 550.0000 550.00 0.000 0.00 13 ADJUST METAL BEAM GUARD RAILING M 15.0000 690.00 0.000 0.00 S) 14 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 12.0000 21,600.00 906.960 10,883.52 S) 15 PREPARE CONCRETE BRIDGE DECK SURFACE M2 2.5000 14,005.00 3,727.000 9,317.50 16 BRIDGE REMOVAL (PORTION) LS 7,800.0000 7,800.00 1.000 7,800.00 17 ASPHALT CONCRETE TONN 190.0000 83,600.00 195.630 37,169.70 18 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 45.0000 5,850.00 0.000 0.00 19 SHOULDER RUMBLE STRIP M 110.0000 8,800.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 20 MINOR CONCRETE (MINOR STRUCTURE) M3 7,000.0000 24,500.00 3.770 26,390.00 21 FURNISH POLYESTER CONCRETE OVERLAY M3 2,880.0000 469,440.00 71.140 204,883.20 22 PLACE POLYESTER CONCRETE OVERLAY M2 28.0000 156,856.00 3,727.000 104,356.00 F) PROGRAM CAS145 PAGE 2 DATE 11/06/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C2604 TIME 02:17 PM ESTIMATE NO. 06 BID OPENING 08/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: BADE, TIM DATE OF THIS ESTIMATE 11/06/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 METAL BEAM GUARD RAILING (WOOD POST) M 120.0000 5,040.00 0.000 0.00 S) 24 DOUBLE METAL BEAM GUARD RAILING M 125.0000 4,750.00 0.000 0.00 S) (WOOD POST) 25 TRANSITION RAILING (TYPE WB) EA 4,250.0000 42,500.00 0.000 0.00 S) 26 SPECIAL MBGR TRANSITION EA 500.0000 2,000.00 0.000 0.00 S) 27 TERMINAL SYSTEM (TYPE SRT) EA 2,850.0000 5,700.00 0.000 0.00 S) 28 CRASH CUSHION (TYPE CAT) EA 7,000.0000 7,000.00 0.000 0.00 S) 29 THERMOPLASTIC TRAFFIC STRIPE M 8.0000 17,360.00 0.000 0.00 S) (SPRAYABLE) 30 PAVEMENT MARKER EA 150.0000 12,150.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 3 DATE 11/06/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2C2604 TIME 02:17 PM ESTIMATE NO. 06 BID OPENING 08/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: BADE, TIM DATE OF THIS ESTIMATE 11/06/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 478,932.42 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 172,272.86 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 651,205.28 31 MOBILIZATION LS 69,078.0000 69,078.00 1.000 69,078.00 ORIGINAL CONTRACT AMOUNT 1,098,098.00 TOTAL WORK COMPLETED 0.00 720,283.28 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -2,000.00 TOTAL 10,000.00 718,283.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/05/07 55 07/14/08 10/22/07 11/15/08 69 180 23 0 53% 88% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PER RE REQUEST BADE, TIM RESIDENT ENGINEER PROGRAM CAS145 DATE 11/06/08