PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/22/26 EST. NO. 002 TIME 10:08 AM R.E. NAME: FARLEY DAMION 02-2K2104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/22/26 EST. NO. 002 TIME 10:08 AM R.E. NAME: FARLEY DAMION 02-2K2104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2K2104 TIME 10:08 AM ESTIMATE NO. 002 BID OPENING 05/20/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: FARLEY DAMION DATE OF THIS ESTIMATE 09/22/26 LOCATION RERUN PROGRESS ESTIMATE 02-TEH-36-R89.0/91.5 ----------------------- 02-TEH-172-5.4/8.9 DIG IT CONSTRUCTION, INC. TEHAMA COUNTY NEAR MINERAL ON ROUTE 36 803 LORRAINE DRIVE FROM 1.3 MILES EAST OF NORTH JUNCTION CHESTER CA 96020 ROUTE 89 TO 0.1 MILE WEST OF MILL CREEK BRIDGE AND ON ROUTE 172 FROM 0.7 MILE WEST FED. AID NO. N O N E PLACE HMA OVERLAY AND REPLACE ASPHALT CONC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 450.0000 9,000.00 8.000 3,600.00 17.000 7,650 003 CONSTRUCTION AREA SIGNS LS 10,500.0000 10,500.00 0.160 1,680.00 0.740 7,770 004 TRAFFIC CONTROL SYSTEM LS 210,000.0000 210,000.00 0.400 84,000.00 0.850 178,500 005 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 60.0000 2,880.00 48.000 2,880.00 48.000 2,880 006 PORTABLE RADAR SPEED FEEDBACK SIGN LS 4,500.0000 4,500.00 0.400 1,800.00 0.850 3,825 SYSTEMS (LS) 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,500.0000 5,500.00 0.400 2,200.00 0.850 4,675 008 AUTOMATED FLAGGER ASSISTANCE DEVICE LS 3,500.0000 3,500.00 0.400 1,400.00 0.850 2,975 009 JOB SITE MANAGEMENT LS 5,600.0000 5,600.00 0.400 2,240.00 0.850 4,760 010 WATER POLLUTION CONTROL PROGRAM LS 2,450.0000 2,450.00 1.000 2,450 011 SHOULDER BACKING TON 40.0000 85,600.00 2,331.840 93,273.60 2,331.840 93,273 012 REPLACE ASPHALT CONCRETE SURFACING CY 700.0000 105,000.00 19.560 13,692.00 147.760 103,432 013 HOT MIX ASPHALT (TYPE A) TON 152.0000 1,000,160.00 6,317.890 960,319.28 6,317.890 960,319 014 TACK COAT TON 750.0000 21,750.00 21.970 16,477.50 21.970 16,477 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 25,320.00 6,329.000 25,316 016 REMOVE PAVEMENT MARKER EA 0.7500 817.50 319.000 239.25 319.000 239 017 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 55.0000 3,850.00 70.000 3,850.00 70.000 3,850 018 6" METHYL METHACRYLATE PAINT TRAFFIC LF 2.4000 186,240.00 0.000 0 STRIPE 019 METHYL METHACRYLATE PAINT TRAFFIC STRIPE SQFT 20.0000 1,400.00 69.000 1,380.00 69.000 1,380 CROSSWALK AND PAVEMENT MARKING 020 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.400 400.00 0.850 850 SYSTEM ELEMENTS DURING CONSTRUCTION 021 MODIFYING TRAFFIC MONITORING STATIONS LS 26,750.0000 26,750.00 1.000 26,750.00 1.000 26,750 PROGRAM CAS145 PAGE 2 DATE 09/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2K2104 TIME 10:08 AM ESTIMATE NO. 002 BID OPENING 05/20/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: FARLEY DAMION DATE OF THIS ESTIMATE 09/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,216,181.63 1,448,872.63 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 1,216,181.63 1,448,872.63 ORIGINAL CONTRACT AMOUNT 1,713,317.50 TOTAL WORK COMPLETED 1,216,181.63 1,448,872.63 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,216,181.63 1,448,872.63 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/23/26 20 08/10/26 08/10/26 09/04/26 20 0 0 0 84% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU RE REQUEST FARLEY DAMION RESIDENT ENGINEER