PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/30/26 EST. NO. 003 TIME 09:37 AM R.E. NAME: FARLEY DAMION 02-2K2104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 3,550.00 E.W. @ L.S.(+) 100626 N 001 0002 450.00 A.C. @ L.S.(+) 100626 N 002 4,000.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 4,000.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/30/26 EST. NO. 003 TIME 09:37 AM R.E. NAME: FARLEY DAMION 02-2K2104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/30/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2K2104 TIME 09:37 AM ESTIMATE NO. 003 BID OPENING 05/20/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: FARLEY DAMION DATE OF THIS ESTIMATE 10/30/26 LOCATION PROGRESS ESTIMATE 02-TEH-36-R89.0/91.5 ----------------- 02-TEH-172-5.4/8.9 DIG IT CONSTRUCTION, INC. TEHAMA COUNTY NEAR MINERAL ON ROUTE 36 803 LORRAINE DRIVE FROM 1.3 MILES EAST OF NORTH JUNCTION CHESTER CA 96020 ROUTE 89 TO 0.1 MILE WEST OF MILL CREEK BRIDGE AND ON ROUTE 172 FROM 0.7 MILE WEST FED. AID NO. N O N E PLACE HMA OVERLAY AND REPLACE ASPHALT CONC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 450.0000 9,000.00 3.000 1,350.00 20.000 9,000 003 CONSTRUCTION AREA SIGNS LS 10,500.0000 10,500.00 0.260 2,730.00 1.000 10,500 004 TRAFFIC CONTROL SYSTEM LS 210,000.0000 210,000.00 0.150 31,500.00 1.000 210,000 005 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 60.0000 2,880.00 48.000 2,880 006 PORTABLE RADAR SPEED FEEDBACK SIGN LS 4,500.0000 4,500.00 0.150 675.00 1.000 4,500 SYSTEMS (LS) 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,500.0000 5,500.00 0.150 825.00 1.000 5,500 008 AUTOMATED FLAGGER ASSISTANCE DEVICE LS 3,500.0000 3,500.00 0.150 525.00 1.000 3,500 009 JOB SITE MANAGEMENT LS 5,600.0000 5,600.00 0.150 840.00 1.000 5,600 010 WATER POLLUTION CONTROL PROGRAM LS 2,450.0000 2,450.00 1.000 2,450 011 SHOULDER BACKING TON 40.0000 85,600.00 2,331.840 93,273 012 REPLACE ASPHALT CONCRETE SURFACING CY 700.0000 105,000.00 147.760 103,432 013 HOT MIX ASPHALT (TYPE A) TON 152.0000 1,000,160.00 6,317.890 960,319 014 TACK COAT TON 750.0000 21,750.00 21.970 16,477 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 25,320.00 6,329.000 25,316 016 REMOVE PAVEMENT MARKER EA 0.7500 817.50 319.000 239 017 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 55.0000 3,850.00 70.000 3,850 018 6" METHYL METHACRYLATE PAINT TRAFFIC LF 2.4000 186,240.00 93,313.000 223,951.20 93,313.000 223,951 STRIPE 019 METHYL METHACRYLATE PAINT TRAFFIC STRIPE SQFT 20.0000 1,400.00 69.000 1,380 CROSSWALK AND PAVEMENT MARKING 020 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.150 150.00 1.000 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 021 MODIFYING TRAFFIC MONITORING STATIONS LS 26,750.0000 26,750.00 1.000 26,750 PROGRAM CAS145 PAGE 2 DATE 10/30/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-2K2104 TIME 09:37 AM ESTIMATE NO. 003 BID OPENING 05/20/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: FARLEY DAMION DATE OF THIS ESTIMATE 10/30/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 262,546.20 1,711,418.83 ADJUSTMENT OF COMPENSATION 450.00 450.00 EXTRA WORK 3,550.00 3,550.00 SUBTOTAL AMOUNT EARNED 266,546.20 1,715,418.83 ORIGINAL CONTRACT AMOUNT 1,713,317.50 TOTAL WORK COMPLETED 266,546.20 1,715,418.83 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 266,546.20 1,715,418.83 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/23/26 20 08/10/26 08/10/26 10/26/26 20 19 3 0 97% 87% PROGRESS IS SATISFACTORY FARLEY DAMION RESIDENT ENGINEER