PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/06 EST. NO.08 TIME 11:39 AM R.E. NAME: SMOLENSKI, JIM 02-351504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 6,239.15 E.W. @ F.A.(+) 060206 N 0001 0 6,239.15 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 6,239.15 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/06 EST. NO.08 TIME 11:39 AM R.E. NAME: SMOLENSKI, JIM 02-351504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE 25% CPM DEDUCTION -7,774.75 02 25% SWPPP DEDUCTION -7,774.75 02 MISSING SWPP CERT -1,579.04 03 MISSING CMP -1,579.03 03 MISSING SWPPP INSP -8,953.59 04 MISSING CPM UPDATES -8,953.59 04 MISSING CPM -6,244.87 05 SWPPP CORRECTED 18,238.88 05 MISSING CPM -154,351.53 06 MISSING CPM -67,602.66 07 0.00 -246,574.93 LABOR COMPLIANCE VIOLATION SUBCONTRACTING VIO -188.14 02 PER LTR DATED 10/06 -10,000.00 06 0.00 -10,188.14 TOTAL DEDUCTIONS 0.00 -256,763.07 PROGRAM CAS145 PAGE 1 DATE 12/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-351504 TIME 11:39 AM ESTIMATE NO. 08 BID OPENING 01/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: SMOLENSKI, JIM DATE OF THIS ESTIMATE 12/22/06 LOCATION PROGRESS ESTIMATE 02-SHA-5713 ----------------- CAL ELECTRO INC IN SHASTA COUNTY ABOUT 16 KM SOUTH 5199 AIRPORT ROAD OF CASTELLA AT THE GIBSON REDDING CA 96002 MAINTENANCE FACILITY FED. AID NO. N O N E UPGRADE FACILITIES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 3,000.0000 3,000.00 0.750 2,250.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 6,000.0000 6,000.00 0.062 372.00 0.493 2,958.00 03 REMOVE FENCE M 15.0000 1,950.00 124.900 1,873.50 04 REMOVE CONCRETE SILT BASIN EA 2,400.0000 2,400.00 0.000 0.00 05 ADJUST MONITORING WELL TO FINISH GRADE EA 225.0000 1,350.00 0.000 0.00 06 ROADWAY EXCAVATION M3 30.0000 70,200.00 1,275.730 38,271.90 07 CLASS 2 AGGREGATE BASE M3 48.0000 65,280.00 849.090 40,756.32 08 ASPHALT CONCRETE (TYPE A) TONN 95.0000 167,200.00 455.970 43,317.15 09 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 26.0000 6,760.00 0.000 0.00 10 CLASS 2 CONCRETE (RETAINING WALL) M3 506.0000 22,770.00 25.000 12,650.00 F) 11 MINOR CONCRETE (MINOR STRUCTURE) M3 855.0000 24,795.00 5.900 5,044.50 F) 12 MINOR CONCRETE (BACKFILL) M3 700.0000 1,400.00 1.287 900.90 13 100 MM POLYVINYL CHLORIDE PIPE M 75.5000 1,963.00 25.800 1,947.90 (SCHEDULE 40) 14 300 MM PLASTIC PIPE M 71.0000 710.00 0.000 0.00 15 450 MM PLASTIC PIPE M 78.0000 9,360.00 56.000 4,368.00 16 300 MM CORRUGATED STEEL PIPE M 910.0000 3,003.00 0.000 0.00 (2.01 MM THICK) 17 600 MM CORRUGATED STEEL PIPE M 312.0000 5,928.00 18.200 5,678.40 (2.01 MM THICK) 18 600 MM CORRUGATED STEEL PIPE INLET M 460.0000 460.00 0.987 454.02 (2.01 MM THICK) 19 900 MM CORRUGATED STEEL PIPE INLET M 1,720.0000 10,320.00 4.297 7,390.84 (2.77 MM THICK) 20 INSTALL STATE FURNISHED OIL / WATER EA 5,940.0000 5,940.00 1.000 5,940.00 SEPARATOR 21 300 MM WELDED STEEL PIPE M 1,770.0000 4,071.00 0.780 1,380.60 (6.35 MM, PERFORATED) 22 300 MM WELDED STEEL PIPE (6.35 MM THICK) M 480.0000 1,200.00 1.780 854.40 PROGRAM CAS145 PAGE 2 DATE 12/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-351504 TIME 11:39 AM ESTIMATE NO. 08 BID OPENING 01/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: SMOLENSKI, JIM DATE OF THIS ESTIMATE 12/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 600 MM STEEL FLARED END SECTION EA 380.0000 380.00 1.000 380.00 24 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 46.0000 2,392.00 3.200 147.20 25 ROCK SLOPE PROTECTION FABRIC M2 18.0000 2,340.00 14.620 263.16 26 MINOR CONCRETE (CURB AND GUTTER) M3 575.0000 18,400.00 13.468 7,744.10 27 MINOR CONCRETE (GUTTER) M3 568.0000 3,976.00 6.090 3,459.12 28 MINOR CONCRETE (DRIVE SLAB) M3 442.4000 17,696.00 19.081 8,441.43 29 MISCELLANEOUS IRON AND STEEL KG 8.5500 6,472.35 113.000 966.15 F) 30 MISCELLANEOUS METAL KG 60.0000 13,380.00 0.000 0.00 F) 31 WELL DEVELOPMENT LS 33,860.0000 33,860.00 1.000 33,860.00 32 TESTING WELL HR 348.0000 2,088.00 5.616 1,954.37 33 DRILL PILOT HOLE M 260.0000 11,700.00 45.400 11,804.00 34 REAMING WATER WELL M 425.0000 19,125.00 45.400 19,295.00 35 BLANK WELL CASING M 114.0000 3,762.00 38.710 4,412.94 36 WELL SCREEN M 312.0000 3,744.00 6.100 1,903.20 37 CHAIN LINK FENCE (TYPE CL-1.8, M 140.0000 18,200.00 0.000 0.00 EXTENSION ARM) 38 BUILDING WORK LS 1550,000.0000 1,550,000.00 0.090 139,500.00 0.569 881,950.00 PROGRAM CAS145 PAGE 3 DATE 12/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-351504 TIME 11:39 AM ESTIMATE NO. 08 BID OPENING 01/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: SMOLENSKI, JIM DATE OF THIS ESTIMATE 12/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 139,872.00 1,152,617.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 6,239.15 6,239.15 SUBTOTAL AMOUNT EARNED 146,111.15 1,158,856.25 ORIGINAL CONTRACT AMOUNT 2,123,575.35 TOTAL WORK COMPLETED 146,111.15 1,158,856.25 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -256,763.07 TOTAL 146,111.15 902,093.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/21/06 245 05/01/06 03/08/06 05/17/07 144 55 0 0 54% 59% PROGRESS IS SATISFACTORY *** SUSPENDED ON 03/08/06. SMOLENSKI, JIM RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/06