PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/23/06 EST. NO.19 TIME 11:13 AM R.E. NAME: GREENE, DAVE 02-357904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/23/06 EST. NO.19 TIME 11:13 AM R.E. NAME: GREENE, DAVE 02-357904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SWPPP NON-COMPLIANCE -6,600.00 05 RET SWPPP RETENTION 6,600.00 09 NON-COMPL. SWPPP -10,000.00 15 RETURN SWPPP 5,000.00 18 0.00 -5,000.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 10/04 -10,000.00 03 MISSING PAYROLLS -10,000.00 04 RETURN DEDUCTIONS 20,000.00 07 PER LTR DATED 06/05 -2,000.00 10 REC'D MISS'G PAYROLL 1,000.00 11 PER LTR 10/05 -1,000.00 14 PER LTR 11/05 -10,000.00 15 0.00 -12,000.00 OVERBID ITEMS OVERBID ITEM NO. 003 -712.50 02 OVERBID ITEM NO. 019 -13,312.50 01 OVERBID ITEM NO. 019 -2,662.50 02 0.00 -16,687.50 TOTAL DEDUCTIONS 0.00 -33,687.50 PROGRAM CAS145 PAGE 1 DATE 03/23/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-357904 TIME 11:13 AM ESTIMATE NO. 19 BID OPENING 06/02/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: GREENE, DAVE DATE OF THIS ESTIMATE 03/23/06 LOCATION PROGRESS ESTIMATE 02-LAS-395-49.5/ .0 ----------------- D H WILLIAMS CONSTRUCTION IN LASSEN COUNTY ABOUT 12 KM NORTH INCORPORATED OF MILFORD AT THE HONEY LAKE SAFETY 4969 NORTH GLENN AVENUE ROADSIDE REST AREA FRESNO CA 93704 FED. AID NO. ACNH-P395(204)E ,G-P395(204)E REHABILITATE REST AREA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 DESTROY WATER WELL LS 3,450.0000 3,450.00 0.000 0.00 02 TEMPORARY FENCE (TYPE CL-1.8) M 31.3600 6,899.20 93.000 2,916.48 03 PREPARE STORM WATER POLLUTION LS 3,450.0000 3,450.00 0.750 2,587.50 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 17,250.0000 17,250.00 0.780 13,455.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,725.0000 1,725.00 0.400 690.00 06 CONSTRUCTION AREA SIGNS LS 5,750.0000 5,750.00 0.000 0.00 07 PORTABLE CHANGEABLE MESSAGE SIGN EA 9,200.0000 27,600.00 3.000 27,600.00 08 ABANDON CULVERT EA 1,150.0000 2,300.00 3.000 3,450.00 09 REMOVE FLARED END SECTION EA 287.5000 862.50 2.000 575.00 10 REMOVE INLET EA 862.5000 862.50 1.000 862.50 11 REMOVE BASE AND SURFACING M3 35.9400 17,251.20 480.000 17,251.20 12 RELOCATE DECORATIVE HYDRANT EA 345.0000 1,035.00 0.000 0.00 13 RELOCATE ROADSIDE SIGN-TWO POST EA 805.0000 805.00 0.000 0.00 14 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 23.0000 1,978.00 86.000 1,978.00 15 REMOVE CONCRETE (MOW STRIP) M 11.5000 2,760.00 169.300 1,946.95 16 REMOVE CONCRETE (CURB AND GUTTER) M 34.5000 7,935.00 230.600 7,955.70 17 REMOVE CONCRETE SIDEWALK M2 28.7500 18,687.50 242.950 6,984.81 18 RECONSTRUCT SIDEWALK JOINTS M 34.5000 1,207.50 0.000 0.00 19 CLEARING AND GRUBBING LS 23,000.0000 23,000.00 0.900 20,700.00 20 ROADWAY EXCAVATION M3 28.7500 195,500.00 7,382.000 212,232.50 21 DITCH EXCAVATION M3 38.3300 1,724.85 0.000 0.00 22 HIGHWAY PLANTING LS 33,647.8500 33,647.85 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/23/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-357904 TIME 11:13 AM ESTIMATE NO. 19 BID OPENING 06/02/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: GREENE, DAVE DATE OF THIS ESTIMATE 03/23/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STRAW (EROSION CONTROL) TONN 402.5000 1,408.75 4.630 1,863.58 24 SEED (EROSION CONTROL) KG 80.5000 3,300.50 56.000 4,508.00 25 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 1.1500 112.70 0.000 0.00 26 STABILIZING EMULSION (EROSION CONTROL) KG 1.4900 146.02 151.000 224.99 27 PLANT ESTABLISHMENT WORK LS 2,415.0000 2,415.00 0.000 0.00 28 FAUCET ASSEMBLY LS 10,810.0000 10,810.00 0.000 0.00 29 IRRIGATION SYSTEM LS 34,941.6000 34,941.60 0.000 0.00 30 150 MM CORRUGATED STEEL PIPE CONDUIT M 230.0000 4,600.00 18.300 4,209.00 (1.63 MM THICK) 31 CLASS 2 AGGREGATE BASE M3 32.2000 56,028.00 1,897.540 61,100.79 32 ASPHALT CONCRETE (TYPE A) TONN 86.2500 154,387.50 1,856.740 160,143.83 33 MINOR CONCRETE (MINOR STRUCTURE) M3 1,604.6512 6,900.00 3.330 5,343.49 34 ROADSIDE SIGN - ONE POST EA 575.0000 1,150.00 0.000 0.00 35 PAINT CONCRETE SURFACES (HOPSCOTCH) M2 373.7538 485.88 0.000 0.00 36 450 MM CORRUGATED STEEL PIPE M 230.0000 36,800.00 161.174 37,070.02 (2.77 MM THICK) 37 600 MM CORRUGATED STEEL PIPE M 575.0000 8,625.00 14.730 8,469.75 (1.63 MM THICK) 38 900 MM CORRUGATED STEEL PIPE M 862.5000 6,900.00 1.710 1,474.88 (1.63 MM THICK) VERTICAL WEIR 39 900 MM CORRUGATED STEEL PIPE M 805.0000 6,440.00 7.500 6,037.50 (4.27 MM THICK) 40 450 MM STEEL FLARED END SECTION EA 345.0000 1,380.00 3.000 1,035.00 41 900 MM STEEL FLARED END SECTION EA 1,150.0000 1,150.00 1.000 1,150.00 42 ROCK SLOPE PROTECTION M3 345.0000 2,760.00 38.330 13,223.85 (FACING, METHOD B) 43 ROCK SLOPE PROTECTION FABRIC M2 9.2000 294.40 54.240 499.01 44 MINOR CONCRETE (DRIP PAD) M3 411.7300 33,350.13 114.919 47,315.60 45 MINOR CONCRETE (CURB AND GUTTER) M 73.5300 13,970.70 196.740 14,466.29 46 MINOR CONCRETE (CONCRETE MOW STRIP) M 39.6100 9,902.50 0.000 0.00 47 MINOR CONCRETE (SIDEWALK) M3 712.1700 92,582.10 68.038 48,454.62 48 MISCELLANEOUS IRON AND STEEL KG 17.4200 5,748.60 324.000 5,644.08 49 WELL DEVELOPMENT LS 23,000.0000 23,000.00 0.034 782.00 PROGRAM CAS145 PAGE 3 DATE 03/23/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-357904 TIME 11:13 AM ESTIMATE NO. 19 BID OPENING 06/02/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: GREENE, DAVE DATE OF THIS ESTIMATE 03/23/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 TESTING WELL HR 345.0000 10,350.00 0.000 0.00 51 DRILL PILOT HOLE M 115.0000 3,565.00 31.000 3,565.00 52 REAMING WATER WELL M 115.0000 3,565.00 11.700 1,345.50 53 CONDUCTOR CASING M 258.7500 4,140.00 12.200 3,156.75 54 BLANK WELL CASING M 201.2500 3,823.75 14.300 2,877.88 55 WELL SCREEN M 287.5000 3,450.00 6.100 1,753.75 56 MOBILIZATION, DEMOBILIZATION, LS 143,750.0000 143,750.00 1.000 143,750.00 AND FINAL CLEANUP 57 THERMOPLASTIC PAVEMENT MARKING M2 66.7000 2,334.50 41.348 2,757.91 58 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.3000 2,369.00 1,103.760 2,538.65 59 150 MM THERMOPLASTIC TRAFFIC STRIPE M 4.6000 1,426.00 315.510 1,451.35 60 200 MM THERMOPLASTIC TRAFFIC STRIPE M 5.7500 2,185.00 375.000 2,156.25 61 LIGHTING LS 166,750.0000 166,750.00 0.782 130,398.50 62 BUILDING WORK LS 1480,525.0000 1,480,525.00 0.014 20,727.35 0.861 1,274,732.03 PROGRAM CAS145 PAGE 4 DATE 03/23/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-357904 TIME 11:13 AM ESTIMATE NO. 19 BID OPENING 06/02/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: GREENE, DAVE DATE OF THIS ESTIMATE 03/23/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 20,727.35 2,314,685.49 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 78,043.69 SUBTOTAL AMOUNT EARNED 20,727.35 2,392,729.18 ORIGINAL CONTRACT AMOUNT 2,723,503.73 TOTAL WORK COMPLETED 20,727.35 2,392,729.18 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -33,687.50 TOTAL 20,727.35 2,359,041.68 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 003 PREPARE STORM WATER POLLUTION 2,500.00 3,450.00 950.00 PREVENTION PLAN 019 CLEARING AND GRUBBING 5,250.00 23,000.00 17,750.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/06/04 455 07/26/04 07/21/04 10/13/06 231 183 0 0 81% 70% PROGRESS IS SATISFACTORY *** SUSPENDED ON 11/28/05. GREENE, DAVE RESIDENT ENGINEER PROGRAM CAS145 DATE 03/23/06