PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/21/08 EST. NO.05 TIME 03:35 PM R.E. NAME: PASCAL, ANTHONY 02-381104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0001 23,814.14 A.C. @ U.P.(+) 071708 N 0001 0 0002 27,417.78 071708 N 2 0 014 0001 2,752.30 E.W. @ F.A.(+) 061608 N 001 0 0002 3,360.83 061708 N 002 0 0003 1,102.90 061808 N 003 0 0004 1,102.90 061908 N 004 0 59,550.85 TOTAL THIS ESTIMATE 484.30 TOTAL PREVIOUS ESTIMATE 60,035.15 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/21/08 EST. NO.05 TIME 03:35 PM R.E. NAME: PASCAL, ANTHONY 02-381104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 LOCATION PROGRESS ESTIMATE 02-SIS-5-R11.4/R16.0 ----------------- TULLIS INC IN SISKIYOU COUNTY NEAR MOUNT P O BOX 493416 SHASTA FROM 0.4 KM NORTH OF REDDING CA 96049 LASSEN LANE OVERCROSSING TO 0.1 KM NORTH OF BLACK BUTTE OVERHEAD FED. AID NO. ACIM-005 -9(167)E ,ACBH-005 -9(167)E ,IM-005 -9(167)E REHABILITATE ROADWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 MIGRATORY BIRD PROTECTION PLAN LS 5,000.0000 5,000.00 0.540 2,700.00 02 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,500.0000 3,500.00 0.250 875.00 0.500 1,750.00 03 TIME-RELATED OVERHEAD WDAY 100.0000 12,000.00 19.000 1,900.00 50.000 5,000.00 04 TEMPORARY FENCE (TYPE ESA) M 15.0000 3,450.00 75.000 1,125.00 05 CONSTRUCTION SITE MANAGEMENT LS 5,500.0000 5,500.00 0.158 869.00 0.425 2,337.50 06 PREPARE STORM WATER POLLUTION LS 3,500.0000 3,500.00 0.750 2,625.00 PREVENTION PLAN 07 TEMPORARY FIBER ROLL M 8.0000 8,000.00 0.000 0.00 08 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,250.0000 1,250.00 1.000 1,250.00 1.000 1,250.00 09 TEMPORARY CONSTRUCTION ENTRANCE EA 1,500.0000 9,000.00 0.000 0.00 10 TEMPORARY COVER M2 2.2000 55,000.00 0.000 0.00 11 TEMPORARY CHECK DAM M 45.0000 16,650.00 122.000 5,490.00 12 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 4,800.00 12.000 4,800.00 13 CONSTRUCTION AREA SIGNS LS 29,490.0000 29,490.00 0.100 2,949.00 0.600 17,694.00 S) 14 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.158 31,600.00 0.518 103,600.00 S) 15 TRAFFIC CONTROL SURVEILLANCE LS 15,000.0000 15,000.00 0.500 7,500.00 0.500 7,500.00 S) 16 TEMPORARY TRAFFIC STRIPE (TAPE) M 3.8500 23,947.00 1,965.000 7,565.25 6,300.000 24,255.00 S) 17 TEMPORARY PAVEMENT MARKING (TAPE) M2 145.0000 6,815.00 11.700 1,696.50 35.100 5,089.50 S) 18 CHANNELIZER (SURFACE MOUNTED) EA 42.0000 18,480.00 90.000 3,780.00 304.000 12,768.00 S) 19 PORTABLE CHANGEABLE MESSAGE SIGN LS 35,000.0000 35,000.00 0.158 5,530.00 0.518 18,130.00 S) 20 TEMPORARY RAILING (TYPE K) M 60.0000 76,800.00 507.000 30,420.00 1,620.000 97,200.00 S) 21 REMOVE METAL BEAM GUARD RAILING M 30.0000 11,400.00 0.000 0.00 S) 22 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 9.3500 14,773.00 1,423.000 13,305.05 S) PROGRAM CAS145 PAGE 2 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE TRAFFIC STRIPE M 1.0500 6,447.00 489.000 513.45 1,912.000 2,007.60 S) 24 REMOVE ROADSIDE SIGN EA 125.0000 6,125.00 0.000 0.00 25 REMOVE ASPHALT CONCRETE DIKE M 10.0000 10,300.00 0.000 0.00 26 REMOVE CULVERT M 134.5000 9,011.50 29.800 4,008.10 29.800 4,008.10 27 REMOVE INLET EA 2,000.0000 10,000.00 4.000 8,000.00 4.000 8,000.00 28 REMOVE ASPHALT CONCRETE SURFACING M2 20.0000 74,080.00 434.352 8,687.04 2,844.252 56,885.04 29 RECONSTRUCT DRAINAGE FACILITY EA 1,800.0000 5,400.00 0.000 0.00 30 RECONSTRUCT METAL BEAM GUARD RAILING M 59.0000 28,910.00 0.000 0.00 S) 31 FLUSH EXISTING EDGE DRAIN M 15.0000 17,700.00 0.000 0.00 32 ADJUST FRAME AND GRATE TO GRADE EA 1,500.0000 1,500.00 0.000 0.00 33 ADJUST METAL BEAM GUARD RAILING M 56.0000 3,360.00 0.000 0.00 S) 34 MODIFY DOWNDRAIN ENTRANCE TAPER EA 1,000.0000 2,000.00 0.000 0.00 35 MODIFY EDGE DRAIN CLEANOUT EA 950.0000 11,400.00 0.000 0.00 36 REPLACE SIGN PANEL (ROADSIDE SIGN) EA 125.0000 625.00 0.000 0.00 37 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 10.0000 85,300.00 774.700 7,747.00 4,714.420 47,144.20 S) 38 REMOVE UNSOUND CONCRETE M3 2,900.0000 84,100.00 0.000 0.00 39 PREPARE CONCRETE BRIDGE DECK SURFACE M2 35.0000 129,640.00 -889.460 -31,131.10 1,520.440 53,215.40 40 CLEARING AND GRUBBING LS 80,000.0000 80,000.00 0.610 48,800.00 41 DEVELOP WATER SUPPLY LS 6,000.0000 6,000.00 1.000 6,000.00 42 ROADWAY EXCAVATION M3 55.0000 465,850.00 338.184 18,600.12 4,496.956 247,332.58 43 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.000 0.00 44 IMPORTED MATERIAL (SHOULDER BACKING) TONN 55.0000 12,100.00 0.000 0.00 45 EROSION CONTROL (TYPE D) HA 8,345.0000 91,795.00 0.000 0.00 S) 46 CLASS 2 AGGREGATE BASE M3 60.0000 152,400.00 2,305.221 138,313.26 47 AGGREGATE BASE (APPROACH SLAB) M3 500.0000 15,500.00 38.630 19,315.00 63.630 31,815.00 48 SEAL RANDOM CRACKS LNKM 6,670.0000 10,005.00 0.000 0.00 49 REPLACE ASPHALT CONCRETE SURFACING M3 500.0000 200,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 ASPHALT CONCRETE (TYPE A) TONN 100.0000 3,450,000.00 796.380 79,638.00 1,595.370 159,537.00 51 ASPHALT CONCRETE (TYPE A, 37.5-MM TONN 110.0000 319,000.00 630.070 69,307.70 2,080.070 228,807.70 MAXIMUM GRADING) 52 PAVEMENT REINFORCING FABRIC M2 8.5500 5,728.50 308.000 2,633.40 672.000 5,745.60 53 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 13.0000 137,800.00 0.000 0.00 AREA) 54 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 4.9500 3,069.00 0.000 0.00 55 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 4.9500 490.05 0.000 0.00 56 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 4.9500 13,117.50 0.000 0.00 57 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 4.9500 1,188.00 0.000 0.00 58 SHOULDER RUMBLE STRIP STA 110.0000 16,500.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 59 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,400.0000 404,600.00 -51.850 -72,590.00 183.150 256,410.00 (TYPE R) 60 MINOR CONCRETE (MINOR STRUCTURE) M3 3,000.0000 28,800.00 4.630 13,890.00 4.630 13,890.00 F) 61 PAVING NOTCH EXTENSION M3 7,750.0000 50,375.00 1.792 13,888.00 1.792 13,888.00 62 CLEAN EXPANSION JOINT M 125.0000 7,625.00 0.000 0.00 63 RAPID SETTING CONCRETE (PATCH) M3 3,000.0000 87,000.00 0.000 0.00 64 FURNISH POLYESTER CONCRETE OVERLAY M3 2,900.0000 252,300.00 -27.316 -79,216.40 22.484 65,203.60 65 PLACE POLYESTER CONCRETE OVERLAY M2 38.0000 140,752.00 -889.460 -33,799.48 1,520.440 57,776.72 F) 66 POLYESTER CONCRETE EXPANSION DAM M3 10,500.0000 25,200.00 0.944 9,912.00 2.144 22,512.00 67 JOINT SEAL (MR 30 MM) M 95.0000 14,250.00 0.000 0.00 S) 68 JOINT SEAL (MR 15 MM) M 95.0000 4,845.00 0.000 0.00 S) 69 JOINT SEAL (MR 50 MM) M 380.0000 2,660.00 0.000 0.00 S) 70 FURNISH SINGLE SHEET ALUMINUM SIGN M2 101.1500 2,832.20 0.000 0.00 (1.6 MM-UNFRAMED) 71 FURNISH SINGLE SHEET ALUMINUM SIGN M2 101.1500 2,629.90 0.000 0.00 (2.0 MM-UNFRAMED) 72 FURNISH SINGLE SHEET ALUMINUM SIGN M2 115.6000 2,196.40 0.000 0.00 (1.6 MM-FRAMED) 73 FURNISH SINGLE SHEET ALUMINUM SIGN M2 130.0500 1,040.40 0.000 0.00 (2.0 MM-FRAMED) 74 ROADSIDE SIGN - ONE POST EA 295.0000 10,915.00 0.000 0.00 75 ROADSIDE SIGN - TWO POST EA 615.0000 7,380.00 0.000 0.00 76 ROADSIDE SIGN - TWO POST EA 2,150.0000 2,150.00 0.000 0.00 (LAMINATED WOOD BOX POST) PROGRAM CAS145 PAGE 4 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 450 MM REINFORCED CONCRETE PIPE M 500.0000 3,000.00 6.100 3,050.00 6.100 3,050.00 (CLASS II) 78 600 MM REINFORCED CONCRETE PIPE M 740.0000 22,200.00 29.800 22,052.00 29.800 22,052.00 (CLASS II) 79 900 MM REINFORCED CONCRETE PIPE M 1,000.0000 6,000.00 0.000 0.00 (CLASS II) 80 600 MM CORRUGATED STEEL PIPE M 700.0000 3,080.00 4.400 3,080.00 4.400 3,080.00 (2.77 MM THICK) 81 CLEANOUT ASSEMBLY (EDGE DRAIN) EA 550.0000 7,700.00 0.000 0.00 82 80 MM PLASTIC PIPE (EDGE DRAIN) M 150.0000 7,200.00 0.000 0.00 83 100 MM PLASTIC PIPE (EDGE DRAIN) M 125.0000 106,250.00 0.000 0.00 84 80 MM PLASTIC PIPE (EDGE DRAIN OUTLET) M 125.0000 20,000.00 71.900 8,987.50 71.900 8,987.50 85 100 MM PLASTIC PIPE M 155.0000 5,115.00 0.000 0.00 (EDGE DRAIN OUTLET) 86 900 MM CORRUGATED STEEL PIPE INLET M 3,000.0000 3,000.00 0.000 0.00 (2.77 MM THICK) 87 ROCK SLOPE PROTECTION M3 300.0000 11,700.00 0.000 0.00 (FACING, METHOD B) 88 ROCK SLOPE PROTECTION M3 250.0000 90,000.00 0.000 0.00 (BACKING NO. 1, METHOD B) 89 ROCK SLOPE PROTECTION FABRIC M2 3.0000 2,010.00 0.000 0.00 90 MINOR CONCRETE (MISCELLANEOUS M3 900.0000 10,800.00 0.000 0.00 CONSTRUCTION) 91 MISCELLANEOUS IRON AND STEEL KG 6.0000 4,692.00 702.000 4,212.00 702.000 4,212.00 SF) 92 DELINEATOR (CLASS 2) EA 35.0000 1,645.00 0.000 0.00 93 HIGHWAY POST MARKER EA 35.0000 350.00 0.000 0.00 94 MARKER (CULVERT) EA 35.0000 455.00 0.000 0.00 95 OBJECT MARKER (TYPE L-1) EA 35.0000 245.00 0.000 0.00 96 METAL BEAM GUARD RAILING M 111.0000 27,750.00 0.000 0.00 S) 97 VEGETATION CONTROL (MINOR CONCRETE) M2 85.0000 192,100.00 0.000 0.00 98 DOUBLE METAL BEAM GUARD RAILING M 109.0000 15,260.00 0.000 0.00 S) (WOOD POST) 99 TRANSITION RAILING (TYPE WB) EA 5,000.0000 60,000.00 0.000 0.00 S) 00 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 1,200.0000 7,200.00 0.000 0.00 S) 01 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,400.0000 3,400.00 0.000 0.00 S) 02 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,400.0000 19,200.00 0.000 0.00 S) 03 CRASH CUSHION (TYPE CAT) EA 6,000.0000 18,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 CRASH CUSHION (TYPE CAT) BACKUP EA 1,000.0000 3,000.00 0.000 0.00 S) 05 CONCRETE BARRIER (TYPE 60) M 850.0000 16,150.00 0.000 0.00 S) 06 THERMOPLASTIC PAVEMENT MARKING M2 76.0000 6,536.00 0.000 0.00 S) 07 THERMOPLASTIC TRAFFIC STRIPE M 1.2000 43,200.00 0.000 0.00 S) (SPRAYABLE) 08 PAVEMENT MARKER (TYPE A) EA 9.5000 722.00 0.000 0.00 S) 09 PAVEMENT MARKER EA 9.5000 23,750.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 10 LIGHTING LS 205,246.0000 205,246.00 0.000 0.00 S) 11 HIGHWAY ADVISORY RADIO (MODIFY) LS 23,797.0000 23,797.00 0.000 0.00 S) 12 FLASHING BEACON LS 30,773.0000 30,773.00 0.000 0.00 S) 13 CLOSED CIRCUIT TELEVISION SYSTEM LS 68,196.0000 68,196.00 0.000 0.00 S) 14 ROADSIDE WEATHER INFORMATION SYSTEM LS 13,662.0000 13,662.00 0.000 0.00 S) (MODIFY) PROGRAM CAS145 PAGE 6 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-381104 TIME 03:35 PM ESTIMATE NO. 05 BID OPENING 08/29/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: PASCAL, ANTHONY DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 176,719.08 1,835,292.35 ADJUSTMENT OF COMPENSATION 51,231.92 51,716.22 EXTRA WORK 8,318.93 8,318.93 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 236,269.93 1,895,327.50 15 MOBILIZATION LS 585,000.0000 585,000.00 0.200 117,000.00 0.950 555,750.00 ORIGINAL CONTRACT AMOUNT 8,746,731.45 TOTAL WORK COMPLETED 353,269.93 2,451,077.50 MATERIALS ON HAND ON SITE 27,745.63 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 353,269.93 2,478,823.13 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/03/07 120 11/14/07 11/27/07 10/28/08 51 110 0 0 27% 43% PROGRESS IS SATISFACTORY PASCAL, ANTHONY RESIDENT ENGINEER PROGRAM CAS145 DATE 07/21/08