PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/05 EST. NO.05 TIME 09:39 AM R.E. NAME: PASCAL, TONY 02-387604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 006 0003 189.99 E.W. @ F.A.(+) 042705 N 003 0 0004 569.95 042605 N 004 0 0005 474.96 042505 N 005 0 007 0001 691.73 E.W. @ F.A.(+) 041405 N 001 0 1,926.63 TOTAL THIS ESTIMATE 42,134.85 TOTAL PREVIOUS ESTIMATE 44,061.48 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/05 EST. NO.05 TIME 09:39 AM R.E. NAME: PASCAL, TONY 02-387604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/25/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-387604 TIME 09:39 AM ESTIMATE NO. 05 BID OPENING 07/28/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: PASCAL, TONY DATE OF THIS ESTIMATE 05/25/05 LOCATION PROGRESS ESTIMATE 02-SIS-5-R16.0/R20.6 ----------------- J F SHEA CO INC IN SISKIYOU COUNTY AT VARIOUS P O BOX 494519 LOCATIONS REDDING CA 960494519 FED. AID NO. ACIM-005 -9(161)E ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 10,000.0000 10,000.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 500.0000 75,000.00 12.000 6,000.00 15.000 7,500.00 03 PREPARE STORM WATER POLLUTION LS 10,000.0000 10,000.00 0.750 7,500.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 6,000.0000 6,000.00 0.020 120.00 0.070 420.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,200.0000 6,000.00 0.030 36.00 0.530 636.00 06 PORTABLE RADAR TRAILER LS 23,000.0000 23,000.00 0.100 2,300.00 0.100 2,300.00 07 CONSTRUCTION AREA SIGNS LS 25,300.0000 25,300.00 0.030 759.00 0.530 13,409.00 08 TRAFFIC CONTROL SYSTEM LS 230,000.0000 230,000.00 0.080 18,400.00 0.100 23,000.00 S) 09 TRAFFIC CONTROL SURVEILLANCE LS 33,400.0000 33,400.00 0.000 0.00 10 TEMPORARY TRAFFIC STRIPE (TAPE) M 4.3000 111,800.00 0.000 0.00 S) 11 TEMPORARY PAVEMENT MARKING (TAPE) M2 69.3000 29,106.00 0.000 0.00 S) 12 CHANNELIZER (SURFACE MOUNTED) EA 56.1000 35,343.00 0.000 0.00 S) 13 CHANNELIZER EA 74.0000 7,400.00 0.000 0.00 S) 14 FLASHING BEACON (PORTABLE) EA 6,000.0000 84,000.00 0.000 0.00 15 TEMPORARY PAVEMENT MARKER EA 9.0000 9,450.00 0.000 0.00 S) 16 PORTABLE CHANGEABLE MESSAGE SIGN LS 55,440.0000 55,440.00 0.080 4,435.20 0.100 5,544.00 17 TEMPORARY RAILING (TYPE K) M 38.0000 135,660.00 0.000 0.00 18 TEMPORARY CRASH CUSHION MODULE EA 142.0000 44,020.00 0.000 0.00 S) 19 REMOVE METAL BEAM GUARD RAILING M 17.6000 15,840.00 0.000 0.00 S) 20 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 5.5000 94,050.00 0.000 0.00 S) STRIPE 21 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 2.2000 51,040.00 0.000 0.00 S) 22 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 93.5000 12,155.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 05/25/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-387604 TIME 09:39 AM ESTIMATE NO. 05 BID OPENING 07/28/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: PASCAL, TONY DATE OF THIS ESTIMATE 05/25/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE PAVEMENT MARKER EA 3.3000 9,471.00 0.000 0.00 S) 24 REMOVE ROADSIDE SIGN (WOOD POST) EA 275.0000 1,925.00 0.000 0.00 25 REMOVE ROADSIDE SIGN PANEL EA 550.0000 550.00 0.000 0.00 26 REMOVE INLET EA 450.0000 900.00 0.000 0.00 27 REMOVE ASPHALT CONCRETE SURFACING M2 31.0000 128,805.00 0.000 0.00 28 ADJUST INLET EA 1,200.0000 24,000.00 8.000 9,600.00 12.000 14,400.00 29 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.0000 80,500.00 0.000 0.00 S) 30 PREPARE CONCRETE BRIDGE DECK SURFACE M2 4.4000 18,282.00 0.000 0.00 31 ROADWAY EXCAVATION M3 43.0000 87,720.00 368.400 15,841.20 32 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 0.750 1,350.00 33 IMPORTED MATERIAL (SHOULDER BACKING) TONN 27.0000 153,900.00 0.000 0.00 34 EROSION CONTROL (MULCH) M3 28.0000 5,600.00 0.000 0.00 S) 35 CLASS 2 AGGREGATE BASE M3 132.0000 77,880.00 207.600 27,403.20 36 AGGREGATE BASE (APPROACH SLAB) M3 380.0000 22,800.00 0.000 0.00 37 REPLACE ASPHALT CONCRETE SURFACING M3 428.0000 107,000.00 247.510 105,934.28 38 ASPHALT CONCRETE (TYPE A) TONN 87.0000 68,730.00 0.000 0.00 39 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 81.0000 2,008,800.00 0.000 0.00 40 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 3.4500 34,293.00 0.000 0.00 AREA) 41 SHOULDER RUMBLE STRIP STA 104.5000 27,170.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 42 CONCRETE PAVEMENT M3 616.0000 819,280.00 0.000 0.00 43 SEAL PAVEMENT JOINT M 110.0000 123,200.00 0.000 0.00 44 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,100.0000 660,000.00 0.000 0.00 (TYPE R) 45 MINOR CONCRETE (MINOR STRUCTURE) M3 3,400.0000 6,800.00 2.000 6,800.00 F) 46 PAVING NOTCH EXTENSION M3 2,750.0000 46,750.00 0.000 0.00 47 FURNISH POLYESTER CONCRETE OVERLAY M3 1,900.0000 237,500.00 0.000 0.00 48 PLACE POLYESTER CONCRETE OVERLAY M2 44.0000 182,820.00 0.000 0.00 F) 49 JOINT SEAL (MR 30 MM) M 138.0000 21,942.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 05/25/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-387604 TIME 09:39 AM ESTIMATE NO. 05 BID OPENING 07/28/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: PASCAL, TONY DATE OF THIS ESTIMATE 05/25/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 JOINT SEAL (MR 15 MM) M 110.0000 9,020.00 0.000 0.00 S) 51 ROADSIDE SIGN - TWO POST EA 550.0000 2,200.00 0.000 0.00 52 INSTALL ROADSIDE SIGN PANEL ON EA 550.0000 550.00 0.000 0.00 EXISTING POST 53 INSTALL ROADSIDE SIGN EA 2,800.0000 8,400.00 0.000 0.00 (LAMINATED WOOD BOX POST) 54 600 MM CORRUGATED PLASTIC PIPE M 300.0000 600.00 0.000 0.00 55 MINOR CONCRETE (MISCELLANEOUS M3 1,650.0000 1,980.00 0.000 0.00 CONSTRUCTION) 56 MISCELLANEOUS IRON AND STEEL KG 3.0000 648.00 0.000 0.00 F) 57 OBJECT MARKER (TYPE P) EA 55.0000 1,210.00 0.000 0.00 58 METAL BEAM GUARD RAILING M 97.0000 87,300.00 0.000 0.00 S) 59 TERMINAL SECTION (TYPE B) EA 110.0000 2,970.00 0.000 0.00 S) 60 TERMINAL SYSTEM (TYPE SRT) EA 2,000.0000 22,000.00 0.000 0.00 S) 61 TERMINAL SYSTEM (TYPE CAT) EA 6,600.0000 59,400.00 0.000 0.00 S) 62 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 660.0000 7,920.00 0.000 0.00 S) 63 THERMOPLASTIC PAVEMENT MARKING M2 64.0000 8,320.00 0.000 0.00 S) 64 THERMOPLASTIC TRAFFIC STRIPE M 0.6000 32,040.00 0.000 0.00 S) (SPRAYABLE) 65 PAVEMENT MARKER (TYPE A) EA 44.0000 2,728.00 0.000 0.00 66 PAVEMENT MARKER EA 9.0000 25,830.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) 67 TRAFFIC MONITORING STATION LS 26,400.0000 26,400.00 0.000 0.00 S) 68 CLOSED CIRCUIT TELEVISION SYSTEM LS 44,000.0000 44,000.00 0.538 23,672.00 0.538 23,672.00 S) 69 MODIFY LIGHTING LS 6,600.0000 6,600.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 05/25/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-387604 TIME 09:39 AM ESTIMATE NO. 05 BID OPENING 07/28/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/05 R.E. NAME: PASCAL, TONY DATE OF THIS ESTIMATE 05/25/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 65,322.20 255,709.68 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 1,926.63 44,061.48 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 67,248.83 299,771.16 70 MOBILIZATION LS 241,000.0000 241,000.00 0.500 120,500.00 ORIGINAL CONTRACT AMOUNT 6,653,538.00 TOTAL WORK COMPLETED 67,248.83 420,271.16 MATERIALS ON HAND ON SITE 67,273.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 67,248.83 487,544.16 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/31/04 150 10/14/04 09/15/04 12/01/05 15 157 -3 0 6% 10% PROGRESS IS SATISFACTORY PASCAL, TONY RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/05