PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/19/08 EST. NO.01 TIME 02:27 PM R.E. NAME: HINTON, JOHN 02-3C8604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 770.37 E.W. @ U.P (+) 062305 N 0001 0 0002 1,176.96 062405 N 0002 0 0003 1,496.08 062508 N 0003 0 0004 1,106.68 062608 N 0004 0 0005 477.12 062708 N 0005 0 0006 477.12 063008 N 0006 0 0007 516.22 070108 N 0007 0 0008 516.22 070208 N 0008 0 0009 417.48 070308 N 0009 0 0010 477.12 070808 N 0010 0 0011 555.32 070908 N 0011 0 0012 417.48 071008 N 0012 0 0013 417.48 071108 N 0013 0 0014 477.12 070908 N 0014 0 0015 555.32 071008 N 0015 0 0016 516.22 071108 N 0016 0 0017 1,188.84 071408 N 0017 0 0018 1,149.74 071508 N 0018 0 0019 803.16 071608 N 0019 0 13,512.05 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 13,512.05 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/19/08 EST. NO.01 TIME 02:27 PM R.E. NAME: HINTON, JOHN 02-3C8604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3C8604 TIME 02:27 PM ESTIMATE NO. 01 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: HINTON, JOHN DATE OF THIS ESTIMATE 07/19/08 LOCATION PROGRESS ESTIMATE 02-SIS-263-52.6/57.1 ----------------- STEWART ENGINEERING INC IN SISKIYOU COUNTY AT VARIOUS P O BOX 990010 LOCATIONS REDDING CA 96099 FED. AID NO. N O N E REHABILITATE BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 6,800.0000 6,800.00 0.190 1,292.00 0.190 1,292.00 02 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.750 1,500.00 0.750 1,500.00 PROGRAM 03 TEMPORARY MULCH CY 60.0000 2,100.00 0.000 0.00 04 TEMPORARY FIBER ROLL LF 3.5000 1,750.00 0.000 0.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,750.0000 2,750.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 9,400.0000 9,400.00 0.779 7,322.60 0.779 7,322.60 S) 07 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.190 19,000.00 0.190 19,000.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN EA 8,600.0000 25,800.00 1.000 8,600.00 1.000 8,600.00 S) 09 REMOVE METAL BEAM GUARD RAILING LF 9.2000 11,224.00 0.000 0.00 S) 10 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.5000 84,133.50 56,089.000 84,133.50 56,089.000 84,133.50 11 RECONSTRUCT DRAINAGE FACILITY EA 1,080.0000 1,080.00 0.000 0.00 12 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 13.2000 37,092.00 0.000 0.00 S) 13 REMOVE UNSOUND CONCRETE CF 70.0000 9,940.00 76.000 5,320.00 76.000 5,320.00 14 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.9000 60,592.50 0.000 0.00 15 BRIDGE REMOVAL (PORTION), LOCATION A LS 6,600.0000 6,600.00 0.000 0.00 16 BRIDGE REMOVAL (PORTION), LOCATION B LS 3,800.0000 3,800.00 0.000 0.00 17 BRIDGE REMOVAL (PORTION), LOCATION C LS 43,000.0000 43,000.00 0.000 0.00 18 BRIDGE REMOVAL (PORTION), LOCATION D LS 5,950.0000 5,950.00 0.000 0.00 19 BRIDGE REMOVAL (PORTION), LOCATION E LS 7,400.0000 7,400.00 0.000 0.00 20 STRUCTURE EXCAVATION (BRIDGE) CY 176.0000 1,408.00 0.000 0.00 F) 21 STRUCTURE BACKFILL (BRIDGE) CY 309.0000 1,854.00 0.000 0.00 F) 22 HOT MIX ASPHALT (TYPE A) TON 165.0000 92,400.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 07/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3C8604 TIME 02:27 PM ESTIMATE NO. 01 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: HINTON, JOHN DATE OF THIS ESTIMATE 07/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE F) LF 60.0000 600.00 0.000 0.00 24 STRUCTURAL CONCRETE, BRIDGE CY 520.0000 68,640.00 0.000 0.00 25 DRILL AND BOND DOWEL LF 48.5000 40,255.00 0.000 0.00 26 CLEAN EXPANSION JOINT LF 28.0000 17,556.00 0.000 0.00 27 RAPID SETTING CONCRETE (PATCH) CF 120.0000 17,040.00 68.000 8,160.00 68.000 8,160.00 28 FURNISH ANTI-ICING POLYMER OVERLAY SQFT 7.0000 471,275.00 0.000 0.00 29 PLACE ANTI-ICING POLYMER OVERLAY SQFT 1.4800 99,641.00 0.000 0.00 30 JOINT SEAL (MR 1/2") LF 47.0000 13,771.00 0.000 0.00 S) 31 JOINT SEAL (MR 1") LF 47.0000 12,361.00 0.000 0.00 S) 32 JOINT SEAL ASSEMBLY (MR 3") LF 216.0000 10,584.00 0.000 0.00 S) 33 JOINT SEAL (MR 2") LF 115.0000 2,875.00 0.000 0.00 S) 34 BAR REINFORCING STEEL (EPOXY COATED) LB 1.7000 25,913.10 0.000 0.00 S) (BRIDGE) 35 METAL BEAM GUARD RAILING (WOOD POST) LF 68.0000 46,240.00 0.000 0.00 S) 36 CONCRETE BARRIER (TYPE 25 MODIFIED) LF 456.0000 40,584.00 0.000 0.00 F) 37 BURIED POST ANCHOR EA 3,560.0000 3,560.00 0.000 0.00 S) 38 TRANSITION RAILING (TYPE WB) EA 9,500.0000 180,500.00 0.000 0.00 S) 39 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,560.0000 32,040.00 0.000 0.00 S) 40 CONCRETE BARRIER (TYPE 9-11 MODIFIED) LF 220.0000 3,520.00 0.000 0.00 F) 41 THERMOPLASTIC PAVEMENT MARKING SQFT 9.8000 1,372.00 0.000 0.00 S) 42 THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 10,637.00 0.000 0.00 S) (SPRAYABLE) 43 PAVEMENT MARKER EA 27.0000 7,560.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 3 DATE 07/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3C8604 TIME 02:27 PM ESTIMATE NO. 01 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/18/08 R.E. NAME: HINTON, JOHN DATE OF THIS ESTIMATE 07/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 135,328.10 135,328.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 13,512.05 13,512.05 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 148,840.15 148,840.15 44 MOBILIZATION LS 130,000.0000 130,000.00 0.500 65,000.00 0.500 65,000.00 ORIGINAL CONTRACT AMOUNT 1,753,598.10 TOTAL WORK COMPLETED 213,840.15 213,840.15 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 213,840.15 213,840.15 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/20/08 100 00/00/00 07/07/08 11/28/08 10 0 0 0 12% 10% PROGRESS IS SATISFACTORY HINTON, JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 07/19/08