PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/07/18 EST. NO. 008 TIME 11:12 AM R.E. NAME: BENNER, HENRY 02-3H1204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/07/18 EST. NO. 008 TIME 11:12 AM R.E. NAME: BENNER, HENRY 02-3H1204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 5/18 -10,000.00 002 RELEASE DEDUCT 10,000.00 004 PER LTTR DATED 10/18 -4,000.00 006 PER LTTR DATED 11/20 -1,000.00 007 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 12/07/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1204 TIME 11:12 AM ESTIMATE NO. 008 BID OPENING 12/14/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: BENNER, HENRY DATE OF THIS ESTIMATE 12/07/18 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 02-TEH-5-0.0/R22.4 ------------------------------ TULLIS, INC. IN TEHAMA COUNTY AT AND NEAR P.O. BOX 493416 CORNING FROM GLENN COUNTY LINE TO REDDING CA 960019604 0.3 MILE NORTH OF BRANCH COYOTE CREEK BRIDGE. FED. AID NO. N O N E AC OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000 002 CONSTRUCTION AREA SIGNS LS 13,995.0000 13,995.00 0.900 12,595 003 TRAFFIC CONTROL SYSTEM LS 694,000.0000 694,000.00 0.980 680,120 004 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 2.0000 5,400.00 871.000 1,742 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 23,000.0000 23,000.00 0.980 22,540 006 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.980 3,920 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 750.0000 750.00 0.750 562 008 TREATED WOOD WASTE LB 0.1000 14,700.00 0.000 0 009 ROADWAY EXCAVATION CY 130.0000 6,760.00 0.000 0 010 SHOULDER BACKING TON 28.0000 464,800.00 29,683.940 831,150 011 CLASS 2 AGGREGATE BASE (CY) CY 85.0000 3,400.00 30.000 2,550 012 ASPHALTIC EMULSION (FOG SEAL COAT) TON 800.0000 4,800.00 8.010 6,408 013 REPLACE ASPHALT CONCRETE SURFACING CY 375.0000 573,750.00 1,552.960 582,360.00 1,552.960 582,360 014 HOT MIX ASPHALT (TYPE A) TON 200.0000 17,200.00 5.000 1,000 015 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 88.0000 6,256,800.00 70,886.530 6,238,014 (OPEN GRADED FRICTION COURSE) 016 DATA CORE LS 10,000.0000 10,000.00 0.000 0 017 TACK COAT TON 250.0000 122,500.00 267.380 66,845 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.5000 1,260,000.00 847,066.000 1,270,599 019 24" REINFORCED CONCRETE PIPE LF 95.0000 1,520.00 18.000 1,710 020 3" PLASTIC PIPE (EDGE DRAIN OUTLET) LF 15.0000 480.00 46.000 690 021 24" CONCRETE FLARED END SECTION EA 1,100.0000 1,100.00 1.000 1,100 022 ROCK SLOPE PROTECTION CY 200.0000 620.00 3.100 620 (NO. 3, METHOD B) (CY) PROGRAM CAS145 PAGE 2 DATE 12/07/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1204 TIME 11:12 AM ESTIMATE NO. 008 BID OPENING 12/14/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: BENNER, HENRY DATE OF THIS ESTIMATE 12/07/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MINOR CONCRETE (MISCELLANEOUS CY 1,150.0000 1,495.00 0.000 0 CONSTRUCTION) 024 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.2000 47,040.00 298.000 1,251.60 11,241.000 47,212 025 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 21.0000 80,220.00 962.500 20,212.50 3,725.000 78,225 026 ASYMMETRICAL REPLACEMENT ASSEMBLY EA 795.0000 30,210.00 8.000 6,360.00 36.000 28,620 027 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,875.0000 77,625.00 7.000 20,125.00 34.000 97,750 028 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,100.0000 25,200.00 3.000 6,300.00 4.000 8,400 029 REMOVE GUARDRAIL LF 3.0000 15,780.00 1,250.000 3,750.00 5,150.000 15,450 030 ADJUST GUARDRAIL LF 10.0000 750.00 75.000 750 031 RECONSTRUCT TERMINAL SYSTEM (TYPE FLEAT) EA 800.0000 800.00 1.000 800 032 RECONSTRUCT END ANCHOR ASSEMBLY EA 475.0000 475.00 1.000 475 (TYPE SFT) 033 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 27,420.00 1,284.000 7,704.00 4,591.000 27,546 034 THERMOPLASTIC TRAFFIC STRIPE LF 0.3100 237,150.00 802,574.630 248,798.14 803,378.008 249,047 (SPRAYABLE) 035 12" RUMBLE STRIP STA 35.0000 165,200.00 4,198.000 146,930 (ASPHALT CONCRETE PAVEMENT) 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.980 980 SYSTEM ELEMENTS DURING CONSTRUCTION 037 TRAFFIC MONITORING STATION SYSTEM LS 73,005.0000 73,005.00 1.000 73,005 038 MODIFYING EXISTING ELECTRICAL SYSTEM LS 78,500.0000 78,500.00 1.000 78,500 PROGRAM CAS145 PAGE 3 DATE 12/07/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1204 TIME 11:12 AM ESTIMATE NO. 008 BID OPENING 12/14/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: BENNER, HENRY DATE OF THIS ESTIMATE 12/07/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 896,861.24 10,579,217.34 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 175,236.98 SUBTOTAL AMOUNT EARNED 896,861.24 10,754,454.32 ORIGINAL CONTRACT AMOUNT 10,342,445.00 TOTAL WORK COMPLETED 896,861.24 10,754,454.32 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL 896,861.24 10,749,454.32 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/22/18 60 03/09/18 03/09/18 11/26/18 77 101 19 0 96% 97% PROGRESS IS SATISFACTORY BENNER, HENRY RESIDENT ENGINEER PROGRAM CAS145 DATE 12/07/18