PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/19 EST. NO. 002 TIME 11:39 AM R.E. NAME: JEFF STEPPAT 02-3H1904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/19 EST. NO. 002 TIME 11:39 AM R.E. NAME: JEFF STEPPAT 02-3H1904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1904 TIME 11:39 AM ESTIMATE NO. 002 BID OPENING 01/24/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: JEFF STEPPAT DATE OF THIS ESTIMATE 07/25/19 LOCATION RERUN PROGRESS ESTIMATE 02-SIS-263-49.3/56.4 ----------------------- J.F. SHEA CONSTRUCTION, INC. IN SISKIYOU COUNTY NEAR YREKA FROM P.O. BOX 494519 0.2 MILE NORTH OF ROUTE 3 TO SHASTA REDDING CA 96049 RIVER BRIDGE 02-0014. FED. AID NO. ACST-P263(1)E AC OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 0.500 900 002 DEVELOP WATER SUPPLY LS 2,350.0000 2,350.00 0.500 1,175 003 CONSTRUCTION AREA SIGNS LS 4,689.0000 4,689.00 0.400 1,875.60 0.400 1,875 004 TRAFFIC CONTROL SYSTEM LS 96,962.0000 96,962.00 0.400 38,784.80 0.400 38,784 005 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 26.0000 6,500.00 124.500 3,237.00 124.500 3,237 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,200.0000 3,200.00 0.400 1,280.00 0.400 1,280 007 JOB SITE MANAGEMENT LS 1,250.0000 1,250.00 0.400 500.00 0.400 500 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.500 350 009 TREATED WOOD WASTE LB 0.0600 2,736.00 0.000 0 010 SHOULDER BACKING TON 48.0000 118,080.00 0.000 0 011 REPLACE ASPHALT CONCRETE SURFACING CY 473.0000 189,200.00 399.400 188,916.20 399.400 188,916 012 HOT MIX ASPHALT (TYPE A) TON 103.0000 1,452,300.00 7,966.450 820,544.35 7,966.450 820,544 013 DATA CORE LS 5,000.0000 5,000.00 0.000 0 014 TACK COAT TON 515.0000 28,325.00 4.540 2,338.10 4.540 2,338 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.9500 196,950.00 102,521.000 199,915.95 102,521.000 199,915 016 MIDWEST GUARDRAIL SYSTEM LF 27.0000 40,230.00 0.000 0 017 MIDWEST GUARDRAIL SYSTEM LF 46.0000 4,600.00 0.000 0 (7' POST, 1/2 SPACING) 018 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 35.0000 27,300.00 0.000 0 019 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,500.0000 17,500.00 0.000 0 020 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,700.0000 8,100.00 0.000 0 021 REMOVE GUARDRAIL LF 2.0000 6,260.00 0.000 0 022 THERMOPLASTIC PAVEMENT MARKING SQFT 20.0000 6,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/25/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1904 TIME 11:39 AM ESTIMATE NO. 002 BID OPENING 01/24/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: JEFF STEPPAT DATE OF THIS ESTIMATE 07/25/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 45,200.00 0.000 0 (SPRAYABLE) 024 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.0000 2,640.00 235.000 2,585.00 235.000 2,585 025 MODIFYING EXISTING ELECTRICAL SYSTEM LS 11,000.0000 11,000.00 1.000 11,000.00 1.000 11,000 PROGRAM CAS145 PAGE 3 DATE 07/25/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3H1904 TIME 11:39 AM ESTIMATE NO. 002 BID OPENING 01/24/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: JEFF STEPPAT DATE OF THIS ESTIMATE 07/25/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,270,977.00 1,273,402.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 1,270,977.00 1,273,402.00 ORIGINAL CONTRACT AMOUNT 2,278,872.00 TOTAL WORK COMPLETED 1,270,977.00 1,273,402.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,270,977.00 1,273,402.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/12/18 35 09/04/18 00/00/00 08/19/19 14 203 0 0 56% 40% PROGRESS IS SATISFACTORY JEFF STEPPAT RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/19