PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/11/25 EST. NO. 004 TIME 05:24 PM R.E. NAME: ZDENEK MIKE 02-3J7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 6,978.82 A.C. @ L.S.(+) 022025 N RE0001 6,978.82 TOTAL THIS ESTIMATE -21,722.14 TOTAL PREVIOUS ESTIMATE -14,743.32 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/11/25 EST. NO. 004 TIME 05:24 PM R.E. NAME: ZDENEK MIKE 02-3J7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING CEM 4401 -10,000.00 003 RTN MISSING CEM 4401 10,000.00 004 10,000.00 0.00 EQUAL EMPLOYMENT OPPORTUNITY MISIING CEM 2402 -10,000.00 003 RTN MISSING CEM 2402 10,000.00 004 10,000.00 0.00 LABOR COMPLIANCE VIOLATION DEDUCT LTTR 11/24 -5,000.00 001 DEDUCT LTTR 12/24 -5,000.00 002 RTN DEDUCT LTR 11/24 5,000.00 003 RTN DEDUCT LTR 12/24 5,000.00 003 0.00 0.00 TOTAL DEDUCTIONS 20,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 03/11/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3J7104 TIME 05:24 PM ESTIMATE NO. 004 BID OPENING 11/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/07/25 R.E. NAME: ZDENEK MIKE DATE OF THIS ESTIMATE 03/11/25 LOCATION FINAL ESTIMATE 02-PLU-89-8.7/12.9 -------------- DIG IT CONSTRUCTION, INC. PLUMAS COUNTY NEAR CRESCENT MILLS FROM 803 LORRAINE DRIVE ROUTE 70 TO 0.7 MILE SOUTH OF DIXIE CANYON CHESTER CA 96020 ROAD FED. AID NO. N O N E PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600 002 TIME-RELATED OVERHEAD (WDAY) WDAY 800.0000 16,000.00 20.000 16,000 003 CONSTRUCTION AREA SIGNS LS 5,950.0000 5,950.00 1.000 5,950 004 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 1.000 125,000 005 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 5.0000 850.00 166.000 830 006 PORTABLE RADAR SPEED FEEDBACK SIGN LS 6,500.0000 6,500.00 1.000 6,500 SYSTEMS (LS) 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,800.0000 5,800.00 1.000 5,800 008 JOB SITE MANAGEMENT LS 5,500.0000 5,500.00 1.000 5,500 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 850.0000 850.00 1.000 850 010 SHOULDER BACKING TON 44.0000 65,560.00 1,867.830 82,184 011 REPLACE ASPHALT CONCRETE SURFACING CY 465.0000 139,500.00 303.960 141,341 012 HOT MIX ASPHALT (TYPE A) TON 149.0000 740,530.00 5,098.720 759,709 013 DATA CORE LS 6,000.0000 6,000.00 1.000 6,000 014 TACK COAT TON 950.0000 20,900.00 23.410 22,239 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 7.0000 113,400.00 16,280.000 113,960 016 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 150.0000 1,500.00 9.300 1,395 (0.063"-UNFRAMED) 017 ROADSIDE SIGN - ONE POST EA 500.0000 500.00 1.000 500 018 THERMOPLASTIC PAVEMENT MARKING SQFT 17.0000 5,270.00 267.000 4,539 019 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 880.00 212.000 848 020 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.4500 304,980.00 88,639.000 305,804 (ENHANCED WET NIGHT VISIBILITY) (RECESSED) 021 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.6500 17,251.50 3,821.000 17,767 (ENHANCED WET NIGHT VISIBILITY) (RECESSED) PROGRAM CAS145 PAGE 2 DATE 03/11/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3J7104 TIME 05:24 PM ESTIMATE NO. 004 BID OPENING 11/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/07/25 R.E. NAME: ZDENEK MIKE DATE OF THIS ESTIMATE 03/11/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 023 MODIFYING TRAFFIC MONITORING STATIONS LS 13,750.0000 13,750.00 1.000 13,750 PROGRAM CAS145 PAGE 3 DATE 03/11/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-3J7104 TIME 05:24 PM ESTIMATE NO. 004 BID OPENING 11/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/07/25 R.E. NAME: ZDENEK MIKE DATE OF THIS ESTIMATE 03/11/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 1,639,068.90 ADJUSTMENT OF COMPENSATION 6,978.82 -14,743.32 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 6,978.82 1,624,325.58 ORIGINAL CONTRACT AMOUNT 1,599,071.50 TOTAL WORK COMPLETED 6,978.82 1,624,325.58 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 20,000.00 0.00 TOTAL 26,978.82 1,624,325.58 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/21/22 20 11/04/24 11/04/24 01/07/25 16 317 0 0 100% 100% ZDENEK MIKE RESIDENT ENGINEER