PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/26/22 EST. NO. 002 TIME 05:14 PM R.E. NAME: JEFF ROTHGERY 02-4H4404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/26/22 EST. NO. 002 TIME 05:14 PM R.E. NAME: JEFF ROTHGERY 02-4H4404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/26/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-4H4404 TIME 05:14 PM ESTIMATE NO. 002 BID OPENING 11/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: JEFF ROTHGERY DATE OF THIS ESTIMATE 07/26/22 LOCATION PROGRESS ESTIMATE 02-PLU-70-0.0/29.9 ----------------- Q&D CONSTRUCTION LLC IN PLUMAS COUNTY AT VARIOUS 1050 S. 21ST STREET; LOCATIONS FROM BUTTE COUNTY LINE TO SPARKS NV 89434 3.1 MILES WEST OF ROUTE 89. FED. AID NO. ACST-ER31-T(V00)4E REPAIR ROCK SLOPE PROTECTION AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 6,000.0000 6,000.00 0.000 0 003 TIME-RELATED OVERHEAD (LS) LS 350,000.0000 350,000.00 0.030 10,500.00 0.030 10,500 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 36,000.00 1.000 6,000.00 1.000 6,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 24,000.00 12.000 2,400.00 12.000 2,400 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 18,000.0000 18,000.00 1.000 18,000.00 1.000 18,000 007 CONSTRUCTION AREA SIGNS LS 8,890.0000 8,890.00 0.510 4,533.90 0.510 4,533 008 TRAFFIC CONTROL SYSTEM LS 300,000.0000 300,000.00 0.030 9,000.00 0.030 9,000 009 TEMPORARY PORTABLE TRAFFIC SIGNAL LS 68,000.0000 68,000.00 0.030 2,040.00 0.030 2,040 SYSTEM 010 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 10.0000 240.00 24.000 240.00 24.000 240 011 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.4000 2,256.00 2,663.000 1,065.20 2,663.000 1,065 012 PORTABLE RADAR SPEED FEEDBACK SIGN LS 9,000.0000 9,000.00 0.030 270.00 0.030 270 SYSTEM 013 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.030 600.00 0.030 600 014 TEMPORARY RAILING (TYPE K) LF 45.0000 105,300.00 2,380.000 107,100.00 2,380.000 107,100 015 ALTERNATIVE TEMPORARY CRASH CUSHION EA 6,000.0000 12,000.00 2.000 12,000.00 2.000 12,000 016 AUTOMATED FLAGGER ASSISTANCE DEVICE LS 24,000.0000 24,000.00 0.030 720.00 0.030 720 017 JOB SITE MANAGEMENT LS 31,000.0000 31,000.00 0.030 930.00 0.030 930 018 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.500 1,500 PLAN 019 RAIN EVENT ACTION PLAN EA 500.0000 13,000.00 0.000 0 020 STORM WATER SAMPLING AND ANALYSIS DAY EA 600.0000 15,600.00 0.000 0 021 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 022 MOVE-IN/MOVE-OUT EA 100.0000 200.00 0.000 0 (TEMPORARY EROSION CONTROL) PROGRAM CAS145 PAGE 2 DATE 07/26/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-4H4404 TIME 05:14 PM ESTIMATE NO. 002 BID OPENING 11/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: JEFF ROTHGERY DATE OF THIS ESTIMATE 07/26/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 2,100.00 0.000 0 024 STREET SWEEPING LS 45,000.0000 45,000.00 0.030 1,350.00 0.030 1,350 025 TEMPORARY CONCRETE WASHOUT LS 15,000.0000 15,000.00 0.030 450.00 0.030 450 026 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 650.0000 2,600.00 0.000 0 027 WATER QUALITY MONITORING REPORT EA 200.0000 800.00 0.000 0 028 WATER QUALITY ANNUAL REPORT EA 700.0000 1,400.00 0.000 0 029 TEMPORARY CREEK DIVERSION SYSTEMS LS 30,000.0000 30,000.00 0.000 0 030 ASBESTOS COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.500 1,250.00 1.000 2,500 031 TREATED WOOD WASTE LB 1.0000 1,940.00 0.000 0 032 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 100,000.0000 100,000.00 0.030 3,000.00 0.030 3,000 033 INVASIVE SPECIES CONTROL LS 10,000.0000 10,000.00 0.030 300.00 0.030 300 034 DUST CONTROL PLAN LS 2,500.0000 2,500.00 1.000 2,500 (NATURALLY OCCURRING ASBESTOS) 035 SAMPLING AND ANALYSIS PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 (NATURALLY OCCURRING ASBESTOS) 036 CLEARING AND GRUBBING (LS) LS 15,000.0000 15,000.00 0.000 0 037 ROADWAY EXCAVATION CY 68.0000 754,800.00 0.000 0 (NATURALLY OCCURRING ASBESTOS) 038 SHOULDER BACKING TON 58.0000 14,500.00 0.000 0 039 STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 80.0000 222,720.00 0.000 0 (NATURALLY OCCURRING ASBESTOS) 040 STRUCTURE BACKFILL (SOLDIER PILE WALL) CY 200.0000 182,200.00 0.000 0 (F) 041 CONCRETE BACKFILL (SOLDIER PILE WALL) CY 725.0000 790,975.00 0.000 0 (F) 042 LEAN CONCRETE BACKFILL CY 850.0000 617,950.00 0.000 0 (F) 043 BIODEGRADABLE RESERVOIR PLANTING EA 45.0000 17,550.00 0.000 0 SYSTEM 044 ROADSIDE CLEARING LS 100,000.0000 100,000.00 0.000 0 045 ORGANIC FERTILIZER LB 1.0000 390.00 0.000 0 046 PLANT (GROUP H) EA 45.0000 116,550.00 0.000 0 047 PLANT (GROUP M) EA 72.0000 28,080.00 0.000 0 048 PLANT ESTABLISHMENT WORK LS 115,743.0000 115,743.00 0.000 0 049 IMPORTED TOPSOIL (CY) CY 115.0000 116,150.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/26/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-4H4404 TIME 05:14 PM ESTIMATE NO. 002 BID OPENING 11/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: JEFF ROTHGERY DATE OF THIS ESTIMATE 07/26/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 IMPORTED TOPSOIL (RSP) (CY) CY 120.0000 40,800.00 0.000 0 051 DRY SEED (SQFT) SQFT 0.3800 14,136.00 0.000 0 052 FIBER REINFORCED MATRIX SQFT 0.4800 8,784.00 0.000 0 053 COMPOST (CY) CY 87.0000 21,750.00 0.000 0 054 INCORPORATE MATERIALS SQFT 1.0000 21,100.00 0.000 0 055 FINISHING ROADWAY LS 30,000.0000 30,000.00 0.000 0 056 CLASS 2 AGGREGATE BASE (CY) CY 108.0000 125,280.00 0.000 0 057 HOT MIX ASPHALT (TYPE A) TON 185.0000 506,900.00 0.000 0 058 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 92.0000 4,600.00 0.000 0 059 PLACE HOT MIX ASPHALT SQYD 40.0000 4,400.00 0.000 0 (MISCELLANEOUS AREA) 060 TACK COAT TON 900.0000 2,970.00 0.000 0 061 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.5000 25,740.00 0.000 0 062 GROUND ANCHOR (SUBHORIZONTAL) EA 5,140.0000 1,074,260.00 0.000 0 063 RAIL ELEMENT WALL LF 150.0000 75,000.00 0.000 0 064 STEEL SOLDIER PILE (W 14 X 109) LF 135.0000 325,215.00 0.000 0 065 STEEL SOLDIER PILE (2 - C 15 X 50) LF 168.0000 1,374,240.00 0.000 0 066 30" DRILLED HOLE LF 410.0000 3,895,000.00 0.000 0 067 STRUCTURAL CONCRETE, WALL FACING CY 1,235.0000 1,764,815.00 0.000 0 (F) 068 STRUCTURAL CONCRETE, HEADWALL CY 3,900.0000 23,400.00 0.000 0 (F) 069 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,900.0000 78,000.00 0.000 0 (F) 070 CONCRETE SURFACE TEXTURE SQFT 2.0000 77,160.00 0.000 0 (F) (EMERALD BAY FLAGSTONE ROCK) 071 BAR REINFORCING STEEL (WALL FACING) LB 1.8300 141,270.51 0.000 0 (F) 072 BAR REINFORCING STEEL LB 3.2500 154,872.25 0.000 0 (F) (EPOXY COATED) (WALL FACING) 073 TIMBER LAGGING MFBM 4,790.0000 819,090.00 0.000 0 (F) 074 CLEAN AND PAINT STEEL SOLDIER PILING LS 440,000.0000 440,000.00 0.000 0 075 18" CORRUGATED STEEL PIPE (.109" THICK) LF 450.0000 5,850.00 0.000 0 076 24" CORRUGATED STEEL PIPE (.138" THICK) LF 365.0000 91,250.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 07/26/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-4H4404 TIME 05:14 PM ESTIMATE NO. 002 BID OPENING 11/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: JEFF ROTHGERY DATE OF THIS ESTIMATE 07/26/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 30" CORRUGATED STEEL PIPE (.138" THICK) LF 520.0000 6,240.00 0.000 0 078 18" SLOTTED CORRUGATED STEEL PIPE LF 310.0000 182,900.00 0.000 0 (.168" THICK) 079 REMOVE CULVERT (LF) LF 25.0000 7,750.00 0.000 0 080 REMOVE INLET EA 1,300.0000 7,800.00 0.000 0 081 REMOVE HEADWALL EA 2,100.0000 2,100.00 0.000 0 082 CONCRETE (EXISTING ROCK SLOPE CY 450.0000 873,000.00 0.000 0 PROTECTION) 083 RECONSTRUCT ROCK SLOPE PROTECTION CY 110.0000 25,300.00 0.000 0 084 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 2.0000 340.00 0.000 0 085 ROCK SLOPE PROTECTION FABRIC (CLASS 10) SQYD 2.0000 220.00 0.000 0 086 MISCELLANEOUS IRON AND STEEL LB 4.0000 14,444.00 0.000 0 (F) 087 PREPARE AND STAIN CONCRETE SQFT 3.4500 133,101.00 0.000 0 088 DELINEATOR (CLASS 1) EA 45.0000 3,240.00 0.000 0 089 TEMPORARY DELINEATOR (CLASS 1) EA 60.0000 1,140.00 0.000 0 090 PAVEMENT MARKER EA 18.0000 3,240.00 0.000 0 (RETROREFLECTIVE-RECESSED) 091 MILEPOST MARKER EA 45.0000 90.00 0.000 0 092 MARKER (CULVERT) EA 45.0000 720.00 0.000 0 093 OBJECT MARKER (TYPE L-1) EA 45.0000 45.00 0.000 0 094 RESET ROADSIDE SIGN (ONE POST) EA 250.0000 250.00 0.000 0 095 RECONSTRUCT TURNABLE ROADSIDE SIGN EA 925.0000 925.00 0.000 0 096 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 37.0000 117,290.00 0.000 0 097 VEGETATION CONTROL (MINOR CONCRETE) SQYD 70.0000 91,700.00 0.000 0 098 CABLE RAILING LF 54.0000 121,392.00 0.000 0 (F) 099 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,500.0000 14,000.00 0.000 0 100 REMOVE GUARDRAIL LF 3.0000 2,820.00 0.000 0 101 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 40.00 0.000 0 102 THERMOPLASTIC TRAFFIC STRIPE LF 0.5600 6,440.00 0.000 0 (SPRAYABLE) 103 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 4,110.00 464.000 348.00 464.000 348 PROGRAM CAS145 PAGE 5 DATE 07/26/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-4H4404 TIME 05:14 PM ESTIMATE NO. 002 BID OPENING 11/18/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/22 R.E. NAME: JEFF ROTHGERY DATE OF THIS ESTIMATE 07/26/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 184,597.10 192,847.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 7,858.91 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 184,597.10 200,706.01 104 MOBILIZATION LS 1,671,046.2400 1,671,046.24 0.000 0 ORIGINAL CONTRACT AMOUNT 18,800,000.00 TOTAL WORK COMPLETED 184,597.10 200,706.01 MATERIALS ON HAND ON SITE 226,024.70 226,024.70 DEDUCTIONS 0.00 0.00 TOTAL 410,621.80 426,730.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/02/22 175 07/11/22 04/26/22 03/29/24 6 54 0 0 1% 3% PROGRESS IS SATISFACTORY *** SUSPENDED ON 04/26/22. JEFF ROTHGERY RESIDENT ENGINEER