PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/06 EST. NO.01 TIME 04:09 PM R.E. NAME: OULAD-DAOUD, BRAHIM 03-0E0204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/06 EST. NO.01 TIME 04:09 PM R.E. NAME: OULAD-DAOUD, BRAHIM 03-0E0204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0E0204 TIME 04:09 PM ESTIMATE NO. 01 BID OPENING 04/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/06 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 07/22/06 LOCATION PROGRESS ESTIMATE 03-PLA-80-R62.9/ .0 ----------------- HARVEYS EXCAVATING AND IN PLACER COUNTY NEAR CISCO GROVE HAULING INC AT 0.1 KM EAST OF SOUTH YUBA RIVER 4325 DOMINGUEZ ROAD SUITE C BRIDGE ROCKLIN CA 95677 FED. AID NO. N O N E ROCK SLOPE PROTECTION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 33.0000 990.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 1,212.0000 1,212.00 0.750 909.00 0.750 909.00 PROGRAM 03 WATER POLLUTION CONTROL LS 40,096.0000 40,096.00 0.000 0.00 04 TEMPORARY FIBER ROLL M 20.4000 2,040.00 0.000 0.00 05 STREET SWEEPING LS 15,842.0000 15,842.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 4,949.0000 4,949.00 0.000 0.00 S) 07 TRAFFIC CONTROL SYSTEM LS 29,784.0000 29,784.00 0.000 0.00 S) 08 CHANNELIZER (SURFACE MOUNTED) EA 90.0000 450.00 0.000 0.00 09 PORTABLE CHANGEABLE MESSAGE SIGN EA 5,048.0000 5,048.00 0.000 0.00 S) 10 TEMPORARY RAILING (TYPE K) M 137.0000 12,604.00 0.000 0.00 S) 11 RECONSTRUCT METAL BEAM GUARD RAILING M 149.0000 9,089.00 0.000 0.00 S) (WOOD POST) 12 PINE NEEDLE MULCH (EROSION CONTROL) M3 86.0000 5,418.00 0.000 0.00 S) 13 FIBER (EROSION CONTROL) KG 6.5000 1,300.00 0.000 0.00 S) 14 FIBER ROLLS M 17.6700 1,767.00 0.000 0.00 S) 15 WILLOW BUNDLES EA 151.5000 3,030.00 0.000 0.00 S) 16 LOG AND ROCK STOP LS 10,017.0000 10,017.00 0.000 0.00 S) 17 COMPOST (EROSION CONTROL) M3 1,245.0000 1,245.00 0.000 0.00 S) 18 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,737.0000 3,474.00 0.000 0.00 S) 19 PURE LIVE SEED (EROSION CONTROL) KG 114.0000 1,596.00 0.000 0.00 S) 20 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 2.8700 1,148.00 0.000 0.00 S) 21 STABILIZING EMULSION (EROSION CONTROL) KG 17.0000 850.00 0.000 0.00 S) 22 ROCK SLOPE PROTECTION (2T, METHOD A) M3 128.5000 75,815.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 07/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0E0204 TIME 04:09 PM ESTIMATE NO. 01 BID OPENING 04/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/06 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 07/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK SLOPE PROTECTION (1/2T, METHOD A) M3 179.5000 23,335.00 0.000 0.00 24 ROCK SLOPE PROTECTION (CRUSHED ROCK BACK M3 173.5000 7,287.00 0.000 0.00 FILL MATERIAL, METHOD B) 25 ROCK SLOPE PROTECTION FABRIC M2 6.1000 4,392.00 0.000 0.00 (HEAVY DUTY) PROGRAM CAS145 PAGE 3 DATE 07/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0E0204 TIME 04:09 PM ESTIMATE NO. 01 BID OPENING 04/11/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/06 R.E. NAME: OULAD-DAOUD, BRAHIM DATE OF THIS ESTIMATE 07/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 909.00 909.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 909.00 909.00 ORIGINAL CONTRACT AMOUNT 262,778.00 TOTAL WORK COMPLETED 909.00 909.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 909.00 909.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/03/06 70 00/00/00 05/18/06 10/15/06 22 22 0 0 0% 31% PROGRESS UNSATISFACTORY *** SUSPENDED ON 06/20/06. OULAD-DAOUD, BRAHIM RESIDENT ENGINEER PROGRAM CAS145 DATE 07/22/06