PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/17/11 EST. NO.01 TIME 01:19 PM R.E. NAME: SERRANO, MAURICIO 03-0F5904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/17/11 EST. NO.01 TIME 01:19 PM R.E. NAME: SERRANO, MAURICIO 03-0F5904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 LOCATION RERUN PROGRESS ESTIMATE 03-SAC-5-0.0/17.2 ----------------------- GRANITE CONSTRUCTION COMPANY IN SACRAMENTO COUNTY IN AND NEAR P O BOX 50085 ELK GROVE FROM THE SAN JOAQUIN WATSONVILLE CA 950775085 COUNTY LINE TO FLORIN ROAD OVERCROSSING FED. AID NO. NH-056(331)E PAVEMENT REHABILATION WITH PCC SLAB ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,500.0000 2,500.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 3,500.0000 980,000.00 0.000 0.00 03 TEMPORARY FENCE (TYPE ESA) LF 1.2500 293,750.00 361.000 451.25 361.000 451.25 04 CONSTRUCTION SITE MANAGEMENT LS 25,000.0000 25,000.00 0.050 1,250.00 0.050 1,250.00 05 PREPARE STORM WATER POLLUTION LS 2,500.0000 2,500.00 0.500 1,250.00 0.500 1,250.00 PREVENTION PLAN 06 TEMPORARY FIBER ROLL LF 2.2000 68,200.00 0.000 0.00 07 TEMPORARY CONSTRUCTION ENTRANCE EA 2,000.0000 32,000.00 0.000 0.00 08 MOVE-IN/MOVE-OUT EA 300.0000 1,800.00 0.000 0.00 (TEMPORARY EROSION CONTROL) 09 TEMPORARY DRAINAGE INLET PROTECTION EA 125.0000 1,500.00 13.000 1,625.00 13.000 1,625.00 10 TEMPORARY HYDRAULIC MULCH SQYD 0.6500 15,730.00 0.000 0.00 (BONDED FIBER MATRIX) 11 STREET SWEEPING LS 400,000.0000 400,000.00 0.000 0.00 12 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 16,000.0000 16,000.00 0.000 0.00 13 RAIN EVENT ACTION PLAN EA 5.0000 365.00 0.000 0.00 14 STORM WATER ANNUAL REPORT EA 25.0000 50.00 0.000 0.00 15 STORM WATER SAMPLING AND ANALYSIS DAY EA 10.0000 250.00 0.000 0.00 16 CONSTRUCTION AREA SIGNS LS 18,500.0000 18,500.00 0.200 3,700.00 0.200 3,700.00 17 TRAFFIC CONTROL SYSTEM LS 1000,000.0000 1,000,000.00 0.050 50,000.00 0.050 50,000.00 18 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.2000 30,800.00 27,607.000 5,521.40 27,607.000 5,521.40 19 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 5,250.00 9.000 225.00 9.000 225.00 20 TEMPORARY PAVEMENT MARKER EA 3.4000 111,520.00 5,687.000 19,335.80 5,687.000 19,335.80 21 PORTABLE CHANGEABLE MESSAGE SIGN LS 40,000.0000 40,000.00 0.050 2,000.00 0.050 2,000.00 22 TEMPORARY RAILING (TYPE K) LF 4.0000 378,000.00 13,200.000 52,800.00 13,200.000 52,800.00 PROGRAM CAS145 PAGE 2 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TEMPORARY CRASH CUSHION MODULE EA 50.0000 9,500.00 28.000 1,400.00 28.000 1,400.00 24 TEMPORARY TRAFFIC SCREEN LF 3.5000 241,150.00 6,315.000 22,102.50 6,315.000 22,102.50 25 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 13,040.00 0.000 0.00 STRIPE (HAZARDOUS WASTE) 26 ABANDON CULVERT EA 800.0000 5,600.00 0.000 0.00 27 REMOVE SINGLE THRIE BEAM BARRIER LF 3.5000 6,825.00 0.000 0.00 28 REMOVE DOUBLE THRIE BEAM BARRIER LF 3.5000 67,900.00 0.000 0.00 29 REMOVE METAL BEAM GUARD RAILING LF 8.0000 24,400.00 0.000 0.00 30 REMOVE DOUBLE METAL BEAM BARRIER LF 9.0000 7,110.00 0.000 0.00 31 REMOVE TRAFFIC STRIPE LF 0.3500 21,455.00 40,223.000 14,078.05 40,223.000 14,078.05 32 REMOVE ROADSIDE SIGN EA 75.0000 2,250.00 0.000 0.00 33 REMOVE SIGN STRUCTURE EA 1,700.0000 5,100.00 0.000 0.00 34 REMOVE BRIDGE MOUNTED SIGN EA 1,300.0000 7,800.00 0.000 0.00 35 REMOVE ASPHALT CONCRETE DIKE LF 0.2500 1,120.00 0.000 0.00 36 REMOVE INLET EA 800.0000 8,800.00 0.000 0.00 37 REMOVE CONCRETE PAVEMENT CY 40.0000 1,124,000.00 0.000 0.00 38 SALVAGE GRATE EA 40.0000 960.00 0.000 0.00 39 RECONSTRUCT METAL BEAM GUARD RAILING LF 17.0000 45,900.00 0.000 0.00 40 RESET ROADSIDE SIGN EA 175.0000 525.00 0.000 0.00 41 RELOCATE ROADSIDE SIGN EA 175.0000 2,800.00 0.000 0.00 42 MODIFY SIGN STRUCTURE EA 2,000.0000 2,000.00 0.000 0.00 (SAFETY CABLE RETROFIT) 43 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 0.7500 162,000.00 0.000 0.00 44 REMOVE CONCRETE CY 60.0000 3,720.00 0.000 0.00 45 REMOVE CONCRETE BARRIER LF 10.0000 12,500.00 0.000 0.00 46 CLEAN BRIDGE DECK SQFT 0.2500 4,071.50 0.000 0.00 47 CAP INLET EA 500.0000 6,500.00 0.000 0.00 48 CLEARING AND GRUBBING LS 1,000.0000 1,000.00 0.000 0.00 49 ROADWAY EXCAVATION CY 7.5000 2,497,500.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.750 1,875.00 0.750 1,875.00 51 SAND BACKFILL CY 100.0000 6,900.00 0.000 0.00 52 IMPORTED MATERIAL (SHOULDER BACKING) CY 38.0000 501,600.00 0.000 0.00 53 EROSION CONTROL (HYDROSEED) (ACRE) ACRE 2,395.0000 15,807.00 0.000 0.00 54 CLASS 2 AGGREGATE SUBBASE CY 28.0000 215,880.00 0.000 0.00 55 CLASS 2 AGGREGATE BASE CY 18.0000 5,256,000.00 0.000 0.00 56 AGGREGATE BASE (APPROACH SLAB) CY 85.0000 7,820.00 0.000 0.00 57 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 58 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 59 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 60 PAVING ASPHALT (BINDER, GEOSYNTHETIC TON 1.0000 410.00 0.000 0.00 PAVEMENT INTERLAYER) 61 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 1.5000 567,000.00 0.000 0.00 62 DATA CORE LS 2,500.0000 2,500.00 0.000 0.00 63 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 2.2500 8,842.50 0.000 0.00 64 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 2.2500 168.75 0.000 0.00 65 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 2.2500 56.25 0.000 0.00 66 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 2.2500 967.50 0.000 0.00 67 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 2.2500 56.25 0.000 0.00 68 TACK COAT TON 1.0000 2,150.00 0.000 0.00 69 JOINTED PLAIN CONCRETE PAVEMENT CY 140.0000 1,540,000.00 0.000 0.00 70 REPLACE CONCRETE PAVEMENT CY 390.0000 4,095,000.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 71 SEAL PAVEMENT JOINT LF 4.3000 124,700.00 0.000 0.00 72 DOWEL BAR RETROFIT EA 65.0000 1,313,000.00 0.000 0.00 73 CRACK EXISTING CONCRETE PAVEMENT SQYD 0.4000 126,400.00 0.000 0.00 74 GRIND EXISTING CONCRETE SQYD 5.5000 421,300.00 0.000 0.00 PAVEMENT 75 STRUCTURAL CONCRETE, APPROACH SLAB CY 775.0000 700,600.00 0.000 0.00 (TYPE R) 76 MINOR CONCRETE (MINOR STRUCTURE) CY 2,500.0000 92,500.00 0.000 0.00 F) PROGRAM CAS145 PAGE 4 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 MINOR CONCRETE (BACKFILL) CY 80.0000 33,600.00 0.000 0.00 78 PAVING NOTCH EXTENSION CF 80.0000 64,800.00 0.000 0.00 79 CLEAN EXPANSION JOINT LF 15.0000 6,300.00 0.000 0.00 80 JOINT SEAL (MR 1") LF 15.0000 13,980.00 0.000 0.00 81 JOINT SEAL (MR 2") LF 60.0000 31,200.00 0.000 0.00 82 TREAT BRIDGE DECK SQFT 0.2500 4,071.50 0.000 0.00 F) 83 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 55.0000 11,990.00 0.000 0.00 84 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 4.5000 106,519.50 0.000 0.00 F) WITH WALKWAY) 85 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 1.1000 26,038.10 0.000 0.00 F) WITH WALKWAY) 86 FURNISH SIGN STRUCTURE (TRUSS) LB 3.9500 524,378.30 0.000 0.00 F) 87 INSTALL SIGN STRUCTURE (TRUSS) LB 0.1500 19,828.20 0.000 0.00 F) 88 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 10.4000 7,238.40 0.000 0.00 F) WITHOUT WALKWAY) 89 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 3.0000 2,088.00 0.000 0.00 F) WITHOUT WALKWAY) 90 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 21.0000 45,990.00 0.000 0.00 91 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 19.0000 4,180.00 0.000 0.00 92 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.5000 133.00 0.000 0.00 (0.063"-UNFRAMED) 93 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.0000 7,200.00 0.000 0.00 (0.080"-UNFRAMED) 94 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 468.00 0.000 0.00 (0.080"-FRAMED) 95 54" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 950.0000 19,000.00 0.000 0.00 (SIGN FOUNDATION) 96 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 950.0000 152,000.00 0.000 0.00 (SIGN FOUNDATION) 97 ROADSIDE SIGN (BARRIER MOUNTED) EA 2,150.0000 6,450.00 0.000 0.00 98 ROADSIDE SIGN - ONE POST EA 190.0000 6,460.00 0.000 0.00 99 ROADSIDE SIGN - TWO POST EA 495.0000 495.00 0.000 0.00 00 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 100.0000 200.00 0.000 0.00 METHOD) 01 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 5.0000 800.00 0.000 0.00 02 INSTALL ROADSIDE SIGN EA 1,300.0000 3,900.00 0.000 0.00 (LAMINATED WOOD BOX POST) 03 18" REINFORCED CONCRETE PIPE LF 40.0000 78,000.00 0.000 0.00 PROGRAM CAS145 PAGE 5 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 24" REINFORCED CONCRETE PIPE LF 47.0000 15,510.00 0.000 0.00 05 MINOR CONCRETE (CURB) LF 22.0000 29,040.00 0.000 0.00 06 MINOR CONCRETE (MISCELLANEOUS CY 600.0000 23,400.00 0.000 0.00 CONSTRUCTION) 07 MINOR CONCRETE (TEXTURED PAVING) SQFT 7.0000 389,368.00 0.000 0.00 F) 08 MISCELLANEOUS IRON AND STEEL LB 1.2000 12,308.40 0.000 0.00 F) 09 DELINEATOR (CLASS 1) EA 28.0000 13,160.00 0.000 0.00 10 DELINEATOR (CLASS 1) (SURFACE MOUNTED) EA 35.0000 945.00 0.000 0.00 11 HIGHWAY POST MARKER EA 35.0000 2,100.00 0.000 0.00 12 OBJECT MARKER (TYPE L-1) EA 35.0000 910.00 0.000 0.00 13 METAL BEAM GUARD RAILING (STEEL POST) LF 25.0000 28,500.00 0.000 0.00 14 DOUBLE METAL BEAM GUARD RAILING LF 30.0000 68,400.00 0.000 0.00 (STEEL POST) 15 DOUBLE THRIE BEAM BARRIER (STEEL POST) LF 39.0000 59,670.00 0.000 0.00 16 TRANSITION RAILING (TYPE WB) EA 2,800.0000 50,400.00 0.000 0.00 17 TRANSITION RAILING (TYPE DTB) EA 3,300.0000 13,200.00 0.000 0.00 18 RAIL TENSIONING ASSEMBLY EA 600.0000 4,800.00 0.000 0.00 19 TERMINAL SYSTEM (TYPE CAT) EA 4,300.0000 73,100.00 0.000 0.00 20 TERMINAL SYSTEM (TYPE CAT) BACKUP EA 200.0000 3,400.00 0.000 0.00 21 END CAP (TYPE TC) EA 200.0000 1,400.00 0.000 0.00 22 END ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 10,800.00 0.000 0.00 23 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,100.0000 42,000.00 0.000 0.00 24 CONCRETE BARRIER (TYPE 60) LF 29.0000 397,300.00 0.000 0.00 25 CONCRETE BARRIER (TYPE 60 MOD-CT1) LF 36.0000 864.00 0.000 0.00 26 CONCRETE BARRIER (TYPE 60C) LF 33.0000 191,730.00 0.000 0.00 27 CONCRETE BARRIER (TYPE 60C MOD-CT1) LF 40.0000 1,760.00 0.000 0.00 28 CONCRETE BARRIER (TYPE 60E) LF 170.0000 71,400.00 0.000 0.00 29 CONCRETE BARRIER (TYPE 60E MOD-CT1) LF 202.0000 808.00 0.000 0.00 30 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 187,600.00 0.000 0.00 PROGRAM CAS145 PAGE 6 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 19,400.00 0.000 0.00 32 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,000.00 0.000 0.00 (BROKEN 12-3) 33 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 18,235.00 0.000 0.00 34 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 96,800.00 0.000 0.00 (BROKEN 36-12) 35 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 4,120.00 0.000 0.00 (BROKEN 17-7) 36 PAVEMENT MARKER (NON-REFLECTIVE) EA 5.0000 7,600.00 0.000 0.00 37 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 57,000.00 0.000 0.00 38 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,545.0000 1,545.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 39 MODIFY RAMP METERING SYSTEM LS 73,879.0000 73,879.00 0.000 0.00 40 MODIFY LIGHTING AND SIGN ILLUMINATION LS 215,334.0000 215,334.00 0.000 0.00 41 MODIFY TRAFFIC OPERATION SYSTEM LS 126,019.0000 126,019.00 0.000 0.00 42 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 43 HOT MIX ASPHALT USING WARM MIX ASPHALT TON 59.0000 16,048,000.00 0.000 0.00 TECHNOLOGIES 44 RUBBERIZED HOT MIX ASPHALT (OPEN GRADED) TON 59.0000 1,634,300.00 0.000 0.00 USING WARM MIX ASPHALT TECHNOLOGIES 45 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 90.0000 11,160,000.00 0.000 0.00 USING WARM MIX ASPHALT TECHNOLOGIES 46 GRIND AND GROOVE EXISTING CONCRETE SQYD 13.0000 328,900.00 0.000 0.00 PAVEMENT PROGRAM CAS145 PAGE 7 DATE 06/17/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0F5904 TIME 01:19 PM ESTIMATE NO. 01 BID OPENING 03/01/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/11 R.E. NAME: SERRANO, MAURICIO DATE OF THIS ESTIMATE 06/17/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 177,614.00 177,614.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 177,614.00 177,614.00 47 MOBILIZATION LS 3264,873.0000 3,264,873.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 58,639,586.15 TOTAL WORK COMPLETED 177,614.00 177,614.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 177,614.00 177,614.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/08/11 280 00/00/00 07/07/11 08/20/12 0 0 0 0 0% 0% PROGRESS IS SATISFACTORY SERRANO, MAURICIO RESIDENT ENGINEER PROGRAM CAS145 DATE 06/17/11