PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/23/18 EST. NO. 001 TIME 03:46 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/23/18 EST. NO. 001 TIME 03:46 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 03:46 PM ESTIMATE NO. 001 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 10/23/18 LOCATION RERUN PROGRESS ESTIMATE 03-GLE-162-82.0/81.6 ----------------------- F.D. THOMAS, INC IN GLENN COUNTY NEAR BUTTE CITY AT 217 BATEMAN DRIVE THE SACRAMENTO RIVER OVERFLOW AND CENTRAL POINT OR 97502 AT CAMPBELL SLOUGH BRIDGE. FED. AID NO. N O N E PAINT TWO BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.500 400.00 0.500 400 002 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.600 3,180.00 0.600 3,180 003 TRAFFIC CONTROL SYSTEM LS 36,000.0000 36,000.00 0.000 0 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,683.0000 6,683.00 0.000 0 005 JOB SITE MANAGEMENT LS 8,400.0000 8,400.00 0.050 420.00 0.050 420 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 0.750 600.00 0.750 600 007 WORK AREA MONITORING (BRIDGE) LS 3,425.0000 3,425.00 0.000 0 008 TEMPORARY HIGH-VISIBILITY FENCE LF 31.0000 2,170.00 70.000 2,170.00 70.000 2,170 009 CLEAN EXPANSION JOINT LF 35.0000 36,890.00 0.000 0 010 JOINT SEAL (MR 1") LF 83.0000 87,482.00 0.000 0 011 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 183,000.0000 183,000.00 0.081 14,823.00 0.081 14,823 012 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 235,000.0000 235,000.00 0.000 0 013 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 17.0000 101,830.00 0.000 0 014 REPAIR SPALLED SURFACE AREA SQFT 4,400.0000 10,120.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 03:46 PM ESTIMATE NO. 001 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 10/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 21,593.00 21,593.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 21,593.00 21,593.00 015 MOBILIZATION LS 79,000.0000 79,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 796,900.00 TOTAL WORK COMPLETED 21,593.00 21,593.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 21,593.00 21,593.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/16/18 70 07/05/18 07/05/18 01/22/19 9 66 0 0 3% 13% PROGRESS IS SATISFACTORY GRANDY, DWAYNE RESIDENT ENGINEER PROGRAM CAS145 DATE 10/23/18