PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/21/18 EST. NO. 002 TIME 02:58 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/21/18 EST. NO. 002 TIME 02:58 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 02:58 PM ESTIMATE NO. 002 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 11/21/18 LOCATION PROGRESS ESTIMATE 03-GLE-162-82.0/81.6 ----------------- F.D. THOMAS, INC IN GLENN COUNTY NEAR BUTTE CITY AT 217 BATEMAN DRIVE THE SACRAMENTO RIVER OVERFLOW AND CENTRAL POINT OR 97502 AT CAMPBELL SLOUGH BRIDGE. FED. AID NO. N O N E PAINT TWO BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.500 400.00 1.000 800 002 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.086 455.80 0.686 3,635 003 TRAFFIC CONTROL SYSTEM LS 36,000.0000 36,000.00 0.200 7,200.00 0.200 7,200 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,683.0000 6,683.00 0.200 1,336.60 0.200 1,336 005 JOB SITE MANAGEMENT LS 8,400.0000 8,400.00 0.380 3,192.00 0.430 3,612 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 0.750 600 007 WORK AREA MONITORING (BRIDGE) LS 3,425.0000 3,425.00 0.513 1,757.03 0.513 1,757 008 TEMPORARY HIGH-VISIBILITY FENCE LF 31.0000 2,170.00 226.500 7,021.50 296.500 9,191 009 CLEAN EXPANSION JOINT LF 35.0000 36,890.00 0.000 0 010 JOINT SEAL (MR 1") LF 83.0000 87,482.00 0.000 0 011 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 183,000.0000 183,000.00 0.432 79,056.00 0.513 93,879 012 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 235,000.0000 235,000.00 0.513 120,555.00 0.513 120,555 013 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 17.0000 101,830.00 304.000 5,168.00 304.000 5,168 014 REPAIR SPALLED SURFACE AREA SQFT 4,400.0000 10,120.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 02:58 PM ESTIMATE NO. 002 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 11/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 226,141.93 247,734.93 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 226,141.93 247,734.93 015 MOBILIZATION LS 79,000.0000 79,000.00 0.950 75,050.00 0.950 75,050 ORIGINAL CONTRACT AMOUNT 796,900.00 TOTAL WORK COMPLETED 301,191.93 322,784.93 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 301,191.93 322,784.93 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/16/18 70 07/05/18 07/05/18 01/22/19 30 66 0 0 40% 43% PROGRESS IS SATISFACTORY GRANDY, DWAYNE RESIDENT ENGINEER PROGRAM CAS145 DATE 11/21/18