PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/25/19 EST. NO. 004 TIME 01:53 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/25/19 EST. NO. 004 TIME 01:53 PM R.E. NAME: GRANDY, DWAYNE 03-0G6204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/25/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 01:53 PM ESTIMATE NO. 004 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 03/25/19 LOCATION RERUN PROGRESS ESTIMATE 03-GLE-162-82.0/81.6 ----------------------- F.D. THOMAS, INC IN GLENN COUNTY NEAR BUTTE CITY AT 217 BATEMAN DRIVE THE SACRAMENTO RIVER OVERFLOW AND CENTRAL POINT OR 97502 AT CAMPBELL SLOUGH BRIDGE. FED. AID NO. N O N E PAINT TWO BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 800.0000 800.00 1.000 800 002 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.020 106.00 0.740 3,922 003 TRAFFIC CONTROL SYSTEM LS 36,000.0000 36,000.00 0.050 1,800.00 0.850 30,600 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,683.0000 6,683.00 0.050 334.15 0.850 5,680 005 JOB SITE MANAGEMENT LS 8,400.0000 8,400.00 0.100 840.00 0.800 6,720 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 0.750 600 007 WORK AREA MONITORING (BRIDGE) LS 3,425.0000 3,425.00 0.060 205.50 0.627 2,147 008 TEMPORARY HIGH-VISIBILITY FENCE LF 31.0000 2,170.00 296.500 9,191 009 CLEAN EXPANSION JOINT LF 35.0000 36,890.00 868.000 30,380 010 JOINT SEAL (MR 1") LF 83.0000 87,482.00 868.000 72,044 011 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 183,000.0000 183,000.00 0.060 10,980.00 0.627 114,741 012 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 235,000.0000 235,000.00 0.567 133,245 013 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 17.0000 101,830.00 0.240 4.08 320.240 5,444 014 REPAIR SPALLED SURFACE AREA SQFT 4,400.0000 10,120.00 9.780 43,032 PROGRAM CAS145 PAGE 2 DATE 03/25/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-0G6204 TIME 01:53 PM ESTIMATE NO. 004 BID OPENING 03/07/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 03/25/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 14,269.73 458,547.61 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 14,269.73 458,547.61 015 MOBILIZATION LS 79,000.0000 79,000.00 1.000 79,000 ORIGINAL CONTRACT AMOUNT 796,900.00 TOTAL WORK COMPLETED 14,269.73 537,547.61 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 14,269.73 537,547.61 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/16/18 70 07/05/18 07/05/18 04/24/19 43 132 0 0 63% 61% PROGRESS IS SATISFACTORY GRANDY, DWAYNE RESIDENT ENGINEER PROGRAM CAS145 DATE 03/25/19