PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/11 EST. NO.02 TIME 08:44 AM R.E. NAME: MILLER, BRANDON 03-1A6804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/11 EST. NO.02 TIME 08:44 AM R.E. NAME: MILLER, BRANDON 03-1A6804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A6804 TIME 08:44 AM ESTIMATE NO. 02 BID OPENING 10/12/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/18/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 03/21/11 LOCATION PROGRESS ESTIMATE 03-ED-50-R28.8/39.6 ----------------- TEICHERT CONSTRUCTION IN EL DORADO COUNTY FROM SAWMILL P.O. BOX 1890 UNDERCROSSING TO SOUTH FORK DAVIS, CA 95617-1890 AMERICAN RIVER BRIDGE FED. AID NO. NH-P050(124)E APPLY HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) LF 6.2500 1,875.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 8,400.0000 8,400.00 0.000 0.00 03 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 0.750 600.00 PROGRAM 04 TEMPORARY DRAINAGE INLET PROTECTION EA 140.0000 8,400.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 5,600.0000 5,600.00 0.000 0.00 06 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 0.000 0.00 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,200.0000 12,200.00 0.000 0.00 08 REMOVE ASPHALT CONCRETE DIKE LF 0.6000 51,810.00 0.000 0.00 09 SALVAGE METAL BEAM GUARD RAILING LF 5.6000 55,328.00 0.000 0.00 10 RECONSTRUCT METAL BEAM GUARD RAILING LF 15.0000 27,000.00 0.000 0.00 (WOOD POST) 11 ADJUST INLET EA 840.0000 11,760.00 0.000 0.00 12 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.4500 216,775.00 0.000 0.00 13 LEAD COMPLIANCE PLAN LS 1,900.0000 1,900.00 1.000 1,900.00 1.000 1,900.00 14 IMPORTED MATERIAL (SHOULDER BACKING) TON 8.6000 74,734.00 0.000 0.00 15 HOT MIX ASPHALT-W (TYPE A) TON 60.0000 7,755,000.00 0.000 0.00 16 RUMBLE STRIP STA 17.5000 12,250.00 0.000 0.00 17 MEDIAN RUMBLE STRIP STA 18.0000 14,580.00 0.000 0.00 18 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 0.8500 39,567.50 0.000 0.00 19 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 0.8500 1,955.00 0.000 0.00 20 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 0.8500 23,587.50 0.000 0.00 21 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 0.8500 8,330.00 0.000 0.00 22 TACK COAT TON 100.0000 91,000.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A6804 TIME 08:44 AM ESTIMATE NO. 02 BID OPENING 10/12/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/18/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 03/21/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 DELINEATOR (CLASS 2) EA 36.0000 47,160.00 0.000 0.00 24 MILEPOST MARKER EA 39.0000 897.00 0.000 0.00 25 OBJECT MARKER (TYPE L-1) EA 39.0000 975.00 0.000 0.00 26 METAL BEAM GUARD RAILING (STEEL POST) LF 18.0000 177,840.00 0.000 0.00 27 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,805.00 0.000 0.00 (RECESSED, BROKEN 12-3) 28 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.4000 245,000.00 0.000 0.00 (RECESSED) 29 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.5000 28,000.00 0.000 0.00 (RECESSED) 30 12" THERMOPLASTIC PAVEMENT MARKING SQFT 32.0000 13,440.00 0.000 0.00 (RECESSED) 31 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0500 102,900.00 0.000 0.00 (RECESSED, BROKEN 36-12) 32 4" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 0.2500 59,000.00 0.000 0.00 33 TWO-COMPONENT PAINT PAVEMENT MARKING SQFT 5.5000 25,685.00 0.000 0.00 34 MODIFY TRAFFIC MONITORING STATION LS 8,100.0000 8,100.00 0.000 0.00 (COUNT) PROGRAM CAS145 PAGE 3 DATE 03/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A6804 TIME 08:44 AM ESTIMATE NO. 02 BID OPENING 10/12/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/18/11 R.E. NAME: MILLER, BRANDON DATE OF THIS ESTIMATE 03/21/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,900.00 2,500.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,900.00 2,500.00 35 MOBILIZATION LS 610,146.0000 610,146.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 9,993,800.00 TOTAL WORK COMPLETED 1,900.00 2,500.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,900.00 2,500.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/16/10 65 00/00/00 12/31/10 06/20/11 0 54 0 0 0% 0% PROGRESS IS SATISFACTORY *** SUSPENDED ON 01/31/11. MILLER, BRANDON RESIDENT ENGINEER PROGRAM CAS145 DATE 03/21/11