PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/21/07 EST. NO.02 TIME 10:30 AM R.E. NAME: ABU-MARKHIEH, OSAMA 03-1A97W4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/21/07 EST. NO.02 TIME 10:30 AM R.E. NAME: ABU-MARKHIEH, OSAMA 03-1A97W4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 LOCATION PROGRESS ESTIMATE 03-COL-20-33.1/R39.4 ----------------- TEICHERT CONSTRUCTION IN COLUSA AND SUTTER COUNTIES NEAR P O BOX 1890 COLUSA FROM 0.1 KM WEST OF MOON DAVIS CA 956171890 BEND ROAD TO 0.2 KM WEST OF HAGEMAN ROAD NEAR MERIDIAN FED. AID NO. ACNH-P020(143)E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,025.0000 2,025.00 1.000 2,025.00 1.000 2,025.00 02 TIME-RELATED OVERHEAD WDAY 800.0000 200,000.00 19.000 15,200.00 24.000 19,200.00 03 TEMPORARY FENCE (TYPE ESA) M 6.0000 54,000.00 828.000 4,968.00 828.000 4,968.00 S) 04 PREPARE STORM WATER POLLUTION LS 10,000.0000 10,000.00 1.000 10,000.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 50,000.0000 50,000.00 0.000 0.00 06 TEMPORARY FIBER ROLL M 6.0000 3,720.00 273.000 1,638.00 273.000 1,638.00 07 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,200.0000 4,800.00 0.000 0.00 08 TEMPORARY CONSTRUCTION ENTRANCE EA 2,800.0000 50,400.00 1.000 2,800.00 2.000 5,600.00 09 TEMPORARY COVER M2 2.4000 48,000.00 0.000 0.00 10 TEMPORARY CHECK DAM M 10.0000 3,000.00 0.000 0.00 11 TEMPORARY DRAINAGE INLET PROTECTION EA 600.0000 16,800.00 0.000 0.00 12 STREET SWEEPING LS 125,000.0000 125,000.00 0.000 0.00 13 CONSTRUCTION AREA SIGNS LS 6,600.0000 6,600.00 0.700 4,620.00 S) 14 TRAFFIC CONTROL SYSTEM LS 442,000.0000 442,000.00 0.000 0.00 S) 15 TEMPORARY PAVEMENT MARKING (PAINT) M2 57.2000 2,802.80 0.000 0.00 S) 16 TEMPORARY TRAFFIC STRIPE (PAINT) M 1.7000 13,804.00 0.000 0.00 S) 17 CHANNELIZER (SURFACE MOUNTED) EA 26.0000 3,640.00 0.000 0.00 S) 18 TEMPORARY PAVEMENT MARKER EA 5.5000 4,345.00 0.000 0.00 S) 19 PORTABLE CHANGEABLE MESSAGE SIGN LS 50,000.0000 50,000.00 0.100 5,000.00 0.100 5,000.00 S) 20 ABANDON CULVERT M 225.0000 7,425.00 0.000 0.00 21 REMOVE METAL BEAM GUARD RAILING M 23.0000 10,580.00 0.000 0.00 S) 22 REMOVE FLARED END SECTION EA 150.0000 1,950.00 6.000 900.00 6.000 900.00 S) PROGRAM CAS145 PAGE 2 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE YELLOW TRAFFIC STRIPE M 9.5000 5,890.00 0.000 0.00 S) 24 REMOVE WHITE TRAFFIC STRIPE M 3.3000 2,970.00 0.000 0.00 S) 25 REMOVE PAVEMENT MARKING M2 57.0000 684.00 0.000 0.00 S) 26 REMOVE ROADSIDE SIGN EA 62.0000 3,348.00 0.000 0.00 27 REMOVE ASPHALT CONCRETE DIKE M 9.0000 3,420.00 0.000 0.00 28 REMOVE CULVERT M 150.0000 64,500.00 38.440 5,766.00 38.440 5,766.00 29 REMOVE INLET EA 800.0000 800.00 0.000 0.00 30 REMOVE HEADWALL EA 800.0000 3,200.00 0.000 0.00 31 REMOVE REINFORCED CONCRETE BOX CULVERT M3 500.0000 1,500.00 0.000 0.00 32 REMOVE MANHOLE EA 900.0000 900.00 0.000 0.00 33 REMOVE BASE AND SURFACING M3 20.0000 14,600.00 0.000 0.00 34 RESET ROADSIDE SIGN EA 125.0000 2,875.00 0.000 0.00 35 RELOCATE ROADSIDE SIGN EA 146.0000 584.00 0.000 0.00 36 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 146.0000 306,600.00 0.000 0.00 S) 37 REMOVE CONCRETE BARRIER M 150.0000 4,200.00 0.000 0.00 38 CLEARING AND GRUBBING LS 270,000.0000 270,000.00 0.500 135,000.00 0.700 189,000.00 39 ROADWAY EXCAVATION M3 30.0000 321,000.00 10,800.000 324,000.00 10,800.000 324,000.00 40 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 1.000 1,800.00 41 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 42 IMPORTED BORROW M3 25.0000 1,075,000.00 0.000 0.00 43 IMPORTED MATERIAL (SHOULDER BACKING) TONN 28.0000 62,720.00 0.000 0.00 44 STRAW (EROSION CONTROL) TONN 538.0000 12,374.00 0.000 0.00 S) 45 FIBER (EROSION CONTROL) KG 1.2000 4,800.00 0.000 0.00 S) 46 COMPOST (EROSION CONTROL) M3 325.0000 11,375.00 0.000 0.00 S) 47 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,875.0000 22,500.00 0.000 0.00 S) 48 PURE LIVE SEED (EROSION CONTROL) KG 156.0000 35,880.00 0.000 0.00 S) 49 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 1.8000 7,200.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 STABILIZING EMULSION (EROSION CONTROL) KG 4.7000 4,136.00 0.000 0.00 S) 51 FINISHING ROADWAY LS 40,000.0000 40,000.00 0.000 0.00 52 CLASS 2 AGGREGATE BASE M3 40.0000 1,556,000.00 0.000 0.00 53 ASPHALT CONCRETE (TYPE A) TONN 70.0000 5,656,000.00 0.000 0.00 54 RUBBERIZED ASPHALT CONCRETE (TYPE O) TONN 100.0000 1,210,000.00 0.000 0.00 55 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 5.0000 650.00 0.000 0.00 56 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 5.0000 1,100.00 0.000 0.00 57 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 5.0000 2,400.00 0.000 0.00 58 CLASS 2 CONCRETE (WINGWALLS) M3 1,900.0000 28,500.00 0.000 0.00 F) 59 CLASS 1 CONCRETE (BOX CULVERT) M3 2,000.0000 218,000.00 0.000 0.00 F) 60 MINOR CONCRETE (MINOR STRUCTURE) M3 1,800.0000 66,600.00 0.000 0.00 F) 61 MINOR CONCRETE (BACKFILL) M3 140.0000 840.00 0.000 0.00 62 BAR REINFORCING STEEL KG 3.0000 1,800.00 0.000 0.00 SF) 63 BAR REINFORCING STEEL (BOX CULVERT) KG 2.0000 21,600.00 0.000 0.00 SF) 64 ROADSIDE SIGN - ONE POST EA 135.0000 11,070.00 0.000 0.00 65 ROADSIDE SIGN - TWO POST EA 416.0000 2,080.00 0.000 0.00 66 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 94.0000 94.00 0.000 0.00 METHOD) 67 375 MM ALTERNATIVE PIPE CULVERT M 360.0000 75,600.00 0.000 0.00 68 450 MM ALTERNATIVE PIPE CULVERT M 360.0000 237,600.00 20.000 7,200.00 20.000 7,200.00 69 600 MM ALTERNATIVE PIPE CULVERT M 540.0000 75,600.00 0.000 0.00 70 750 MM ALTERNATIVE PIPE CULVERT M 560.0000 20,160.00 0.000 0.00 71 900 MM ALTERNATIVE PIPE CULVERT M 590.0000 45,430.00 0.000 0.00 72 450 MM REINFORCED CONCRETE PIPE M 370.0000 8,880.00 23.000 8,510.00 23.000 8,510.00 73 600 MM REINFORCED CONCRETE PIPE M 580.0000 5,800.00 0.000 0.00 74 750 MM REINFORCED CONCRETE PIPE M 600.0000 12,600.00 15.000 9,000.00 15.000 9,000.00 75 900 MM REINFORCED CONCRETE PIPE M 650.0000 9,100.00 12.000 7,800.00 12.000 7,800.00 76 450 MM CONCRETE FLARED END SECTION EA 650.0000 1,950.00 2.000 1,300.00 2.000 1,300.00 PROGRAM CAS145 PAGE 4 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 600 MM CONCRETE FLARED END SECTION EA 750.0000 1,500.00 0.000 0.00 78 750 MM CONCRETE FLARED END SECTION EA 750.0000 750.00 1.000 750.00 1.000 750.00 79 450 MM ALTERNATIVE FLARED END SECTION EA 300.0000 3,300.00 1.000 300.00 1.000 300.00 80 600 MM ALTERNATIVE FLARED END SECTION EA 350.0000 1,050.00 0.000 0.00 81 750 MM ALTERNATIVE FLARED END SECTION EA 500.0000 1,000.00 0.000 0.00 82 900 MM ALTERNATIVE FLARED END SECTION EA 700.0000 4,200.00 0.000 0.00 83 MANHOLE EA 1,600.0000 1,600.00 0.000 0.00 84 MINOR CONCRETE (CHANNEL LINING) M3 330.0000 488,400.00 0.000 0.00 85 MINOR CONCRETE (MISCELLANEOUS M3 800.0000 1,600.00 0.000 0.00 CONSTRUCTION) 86 MINOR CONCRETE (CURB, GUTTER, SIDEWALK M3 350.0000 315,000.00 0.000 0.00 AND DRIVEWAY) 87 MISCELLANEOUS IRON AND STEEL KG 3.5000 9,922.50 0.000 0.00 SF) 88 FENCE (TYPE WM, METAL POST) M 13.0000 47,580.00 2,200.000 28,600.00 S) 89 3.0 M WIRE MESH GATE EA 755.0000 3,020.00 0.000 0.00 S) 90 DELINEATOR (CLASS 1) EA 42.0000 3,150.00 0.000 0.00 91 MARKER (CULVERT) EA 42.0000 1,344.00 0.000 0.00 92 HIGHWAY POST MARKER EA 42.0000 882.00 0.000 0.00 93 OBJECT MARKER (TYPE L-1) EA 42.0000 126.00 0.000 0.00 94 METAL BEAM GUARD RAILING (WOOD POST) M 70.0000 22,400.00 0.000 0.00 S) 95 DOUBLE METAL BEAM GUARD RAILING M 106.0000 16,960.00 0.000 0.00 S) (WOOD POST) 96 CABLE RAILING M 140.0000 6,440.00 0.000 0.00 S) 97 TRANSITION RAILING (TYPE WB) EA 3,120.0000 18,720.00 0.000 0.00 S) 98 RETURN CAP (TYPE A) EA 182.0000 182.00 0.000 0.00 S) 99 END ANCHOR ASSEMBLY (TYPE SFT) EA 712.0000 3,560.00 0.000 0.00 S) 00 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,120.0000 3,120.00 0.000 0.00 S) 01 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,350.0000 16,450.00 0.000 0.00 S) 02 THERMOPLASTIC PAVEMENT MARKING M2 52.0000 12,480.00 0.000 0.00 S) 03 THERMOPLASTIC TRAFFIC STRIPE M 0.6400 17,856.00 0.000 0.00 S) (SPRAYABLE) PROGRAM CAS145 PAGE 5 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.6000 45,440.00 0.000 0.00 S) 05 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.2000 4,578.00 0.000 0.00 S) 06 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0500 13,650.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 07 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0500 30.45 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 08 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.4000 20,900.00 0.000 0.00 S) PROGRAM CAS145 PAGE 6 DATE 05/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1A97W4 TIME 10:30 AM ESTIMATE NO. 02 BID OPENING 11/14/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/07 R.E. NAME: ABU-MARKHIEH, OSAMA DATE OF THIS ESTIMATE 05/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 532,157.00 637,977.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 532,157.00 637,977.00 09 MOBILIZATION LS 630,000.0000 630,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 14,382,392.75 TOTAL WORK COMPLETED 532,157.00 637,977.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 532,157.00 637,977.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/19/06 250 04/16/07 01/03/07 04/17/08 94 1 0 0 4% 38% PROGRESS IS SATISFACTORY ABU-MARKHIEH, OSAMA RESIDENT ENGINEER PROGRAM CAS145 DATE 05/21/07