PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/27/05 EST. NO.01 TIME 09:31 AM R.E. NAME: KEVIN MCKECHNIE 03-1C8204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/27/05 EST. NO.01 TIME 09:31 AM R.E. NAME: KEVIN MCKECHNIE 03-1C8204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 001 -375.00 01 -375.00 -375.00 TOTAL DEDUCTIONS -375.00 -375.00 PROGRAM CAS145 PAGE 1 DATE 10/27/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1C8204 TIME 09:31 AM ESTIMATE NO. 01 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/05 R.E. NAME: KEVIN MCKECHNIE DATE OF THIS ESTIMATE 10/27/05 LOCATION PROGRESS ESTIMATE 03-PLA-28-7.8/8.4 ----------------- PRISM ENGINEERING INC IN PLACER COUNTY IN TAHOE VISTA AT 630 REED STREET NATIONAL AVENUE SANTA CLARA CA 95050 FED. AID NO. N O N E INSTALL SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.750 1,125.00 0.750 1,125.00 PROGRAM 02 WATER POLLUTION CONTROL LS 10,000.0000 10,000.00 0.333 3,330.00 0.333 3,330.00 03 CONSTRUCTION AREA SIGNS LS 3,630.0000 3,630.00 0.750 2,722.50 0.750 2,722.50 S) 04 TRAFFIC CONTROL SYSTEM LS 70,000.0000 70,000.00 0.350 24,500.00 0.350 24,500.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 15,000.0000 15,000.00 0.350 5,250.00 0.350 5,250.00 S) 06 REMOVE YELLOW TRAFFIC STRIPE M 25.0000 50,250.00 0.000 0.00 07 REMOVE TRAFFIC STRIPE M 20.0000 1,100.00 0.000 0.00 08 REMOVE PAVEMENT MARKING M2 60.0000 960.00 0.000 0.00 09 REMOVE ROADSIDE SIGN EA 250.0000 250.00 0.000 0.00 10 REMOVE ASPHALT CONCRETE DIKE M 250.0000 2,500.00 0.000 0.00 11 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 0.650 6,500.00 0.650 6,500.00 12 CLASS 2 AGGREGATE BASE M3 1,200.0000 4,320.00 0.000 0.00 13 REPLACE ASPHALT CONCRETE SURFACING M3 150.0000 7,800.00 0.000 0.00 14 ASPHALT CONCRETE (TYPE A) TONN 2,500.0000 9,000.00 0.000 0.00 15 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 250.0000 6,000.00 0.000 0.00 AREA) 16 ROADSIDE SIGN - ONE POST EA 350.0000 700.00 0.000 0.00 17 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 250.0000 1,500.00 0.000 0.00 METHOD) 18 100 MM THERMOPLASTIC TRAFFIC STRIPE M 5.0000 10,150.00 0.000 0.00 S) (RECESSED) 19 200 MM THERMOPLASTIC TRAFFIC STRIPE M 5.0000 460.00 0.000 0.00 S) (RECESSED) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 3.5000 4,970.00 0.000 0.00 S) (BROKEN - 10.98 M, 3.66 M RECESSED) 21 TWO-COMPONENT PAINT PAVEMENT MARKING M2 35.0000 3,290.00 0.000 0.00 S) 22 SIGNAL AND LIGHTING LS 210,259.0000 210,259.00 0.254 53,405.79 0.254 53,405.79 PROGRAM CAS145 PAGE 2 DATE 10/27/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1C8204 TIME 09:31 AM ESTIMATE NO. 01 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/05 R.E. NAME: KEVIN MCKECHNIE DATE OF THIS ESTIMATE 10/27/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 96,833.29 96,833.29 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 96,833.29 96,833.29 ORIGINAL CONTRACT AMOUNT 423,639.00 TOTAL WORK COMPLETED 96,833.29 96,833.29 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -375.00 -375.00 TOTAL 96,458.29 96,458.29 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 001 PREPARE WATER POLLUTION CONTROL 1,000.00 1,500.00 500.00 PROGRAM DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/25/05 75 10/05/05 09/26/05 01/13/06 18 0 0 0 23% 24% PROGRESS IS SATISFACTORY KEVIN MCKECHNIE RESIDENT ENGINEER PROGRAM CAS145 DATE 10/27/05