PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/28/11 EST. NO.01 TIME 02:07 PM R.E. NAME: GRANDY, DWAYNE 03-1E1104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/28/11 EST. NO.01 TIME 02:07 PM R.E. NAME: GRANDY, DWAYNE 03-1E1104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1E1104 TIME 02:07 PM ESTIMATE NO. 01 BID OPENING 10/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/18/11 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 02/28/11 LOCATION PROGRESS ESTIMATE 03-BUT-70-14.8/ .0 ----------------- BUGLER CONSTRUCTION IN AND NEAR OROVILLE ON ROUTE 70 AT 4847 HOPYARD RD SUITE 4 NO 39 FEATHER RIVER BRIDGE #12-141R/L PLEASANTON CA 94588 AND ON ROUTE 162 AT THERMALITO AFTERBAY BRIDGE #12-0031 FED. AID NO. NHBH-X007(9)E INSTALL CABLE RESTRAINERS AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 0.050 150.00 0.050 150.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.250 250.00 0.250 250.00 PROGRAM 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,500.0000 3,000.00 0.000 0.00 04 MOVE-IN/MOVE-OUT EA 1,500.0000 3,000.00 0.000 0.00 (TEMPORARY EROSION CONTROL) 05 STREET SWEEPING LS 2,000.0000 2,000.00 0.000 0.00 06 TRAFFIC CONTROL SYSTEM LS 49,000.0000 49,000.00 0.000 0.00 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,000.0000 12,000.00 0.000 0.00 08 ACCESS OPENING, SOFFIT EA 2,000.0000 16,000.00 2.640 5,280.00 2.640 5,280.00 09 CLEARING AND GRUBBING ACRE 1,000.0000 1,000.00 0.000 0.00 10 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.000 0.00 11 FIBER ROLLS LF 5.0000 5,800.00 0.000 0.00 12 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.6000 21,180.00 0.000 0.00 13 STRUCTURAL CONCRETE, BRIDGE CY 1,500.0000 345,000.00 6.000 9,000.00 6.000 9,000.00 F) 14 DIAPHRAGM BOLSTER EA 1,500.0000 12,000.00 0.000 0.00 15 DRILL AND BOND DOWEL LF 40.0000 34,320.00 66.000 2,640.00 66.000 2,640.00 16 INSTALL HEADED ANCHORS EA 15.0000 12,240.00 0.000 0.00 17 CORE CONCRETE (6") LF 250.0000 30,500.00 0.000 0.00 18 STRUCTURAL STEEL (BRIDGE) LB 10.0000 57,200.00 0.000 0.00 19 WORK AREA MONITORING LS 1,000.0000 1,000.00 0.000 0.00 20 MISCELLANEOUS METAL LB 6.0000 87,960.00 0.000 0.00 F) (RESTRAINER - CABLE TYPE) PROGRAM CAS145 PAGE 2 DATE 02/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1E1104 TIME 02:07 PM ESTIMATE NO. 01 BID OPENING 10/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/18/11 R.E. NAME: GRANDY, DWAYNE DATE OF THIS ESTIMATE 02/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 17,320.00 17,320.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 17,320.00 17,320.00 21 MOBILIZATION LS 70,000.0000 70,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 768,200.00 TOTAL WORK COMPLETED 17,320.00 17,320.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 17,320.00 17,320.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/10/11 125 00/00/00 01/25/11 07/31/11 14 5 0 0 2% 11% PROGRESS IS SATISFACTORY GRANDY, DWAYNE RESIDENT ENGINEER PROGRAM CAS145 DATE 02/28/11