PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/24/07 EST. NO.08 TIME 10:02 AM R.E. NAME: FEUSI, ROBERT 03-1E7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 123,508.39 E.W. @ L.S.(+) 041007 N 0001 0 003 0001 96,512.12 A.C. @ U.P.(+) 091707 N 0001 0 220,020.51 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 220,020.51 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/24/07 EST. NO.08 TIME 10:02 AM R.E. NAME: FEUSI, ROBERT 03-1E7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 04/07 -5,000.00 02 PER LTR DATED 5/07 -6,000.00 03 RETURN 4/07 DEDUCT 5,000.00 04 PER LTR DATED 7/07 -10,000.00 05 PER LTR DATED 9/07 -10,000.00 07 RETURN 5/07 DEDUCT 6,000.00 07 0.00 -20,000.00 TOTAL DEDUCTIONS 0.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 10/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1E7204 TIME 10:02 AM ESTIMATE NO. 08 BID OPENING 11/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: FEUSI, ROBERT DATE OF THIS ESTIMATE 10/24/07 LOCATION RERUN PROGRESS ESTIMATE 03-SAC-5-25.4/34.3 ----------------------- GRANITE CONSTRUCTION COMPANY IN SACRAMENTO COUNTY IN AND NEAR P O BOX 50085 SACRAMENTO FROM THE AMERICAN RIVER WATSONVILLE CA 950775085 BRIDGE TO THE SACRAMENTO RIVER BRIDGE FED. AID NO. MTCE- ( ) RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,750.0000 3,750.00 0.100 375.00 1.000 3,750.00 02 TIME-RELATED OVERHEAD WDAY 4,000.0000 340,000.00 17.000 68,000.00 85.000 340,000.00 03 PREPARE WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 1.000 3,000.00 PROGRAM 04 WATER POLLUTION CONTROL LS 10,000.0000 10,000.00 0.100 1,000.00 1.000 10,000.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) EA 1,000.0000 2,000.00 1.000 1,000.00 06 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.750 7,500.00 S) 07 TRAFFIC CONTROL SYSTEM LS 357,500.0000 357,500.00 0.100 35,750.00 1.000 357,500.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 75,000.0000 75,000.00 0.100 7,500.00 1.000 75,000.00 S) 09 REMOVE METAL BEAM GUARD RAILING M 18.0000 14,580.00 509.700 9,174.60 810.000 14,580.00 10 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 3.5000 40,950.00 13,106.140 45,871.49 11 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 10.0000 4,600.00 417.140 4,171.40 12 REMOVE ASPHALT CONCRETE DIKE M 25.0000 52,000.00 1,898.300 47,457.50 13 SALVAGE TERMINAL SYSTEM EA 350.0000 7,000.00 20.000 7,000.00 20.000 7,000.00 14 RECONSTRUCT METAL BEAM GUARD RAILING M 110.0000 1,320.00 0.000 0.00 S) (STEEL POST) 15 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 14.0000 88,480.00 6,184.000 86,576.00 S) (30 MM MAXIMUM) 16 IMPORTED MATERIAL (SHOULDER BACKING) TONN 50.0000 418,500.00 7,007.730 350,386.50 17 WEED CONTROL MAT (RUBBER) M2 125.0000 141,250.00 859.700 107,462.50 1,130.000 141,250.00 18 ASPHALT CONCRETE (TYPE A) TONN 95.0000 13,300.00 130.720 12,418.40 130.720 12,418.40 19 RUBBERIZED ASPHALT CONCRETE (TYPE O) TONN 102.0000 3,498,600.00 30,043.590 3,064,446.18 20 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 3.8500 242.55 388.410 1,495.38 388.410 1,495.38 21 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 3.8500 5,390.00 1,378.350 5,306.65 1,378.350 5,306.65 22 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 3.8500 2,387.00 321.650 1,238.35 321.650 1,238.35 PROGRAM CAS145 PAGE 2 DATE 10/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1E7204 TIME 10:02 AM ESTIMATE NO. 08 BID OPENING 11/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: FEUSI, ROBERT DATE OF THIS ESTIMATE 10/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 SHOULDER RUMBLE STRIP STA 130.0000 39,000.00 286.000 37,180.00 300.000 39,000.00 (AC, GROUND-IN INDENTATIONS) 24 REPLACE CONCRETE PAVEMENT M3 1,150.0000 138,000.00 144.180 165,807.00 (RAPID STRENGTH CONCRETE) 25 GRIND EXISTING CONCRETE M2 52.0000 83,200.00 1,487.400 77,344.80 S) PAVEMENT 26 GRIND RAPID STRENGTH CONCRETE PAVEMENT M2 35.0000 21,000.00 0.000 0.00 S) 27 MINOR CONCRETE (MINOR STRUCTURE) M3 14,400.0000 7,200.00 0.500 7,200.00 28 METAL BEAM GUARD RAILING (WOOD POST) M 96.5000 78,165.00 509.700 49,186.05 810.000 78,165.00 S) 29 END CAP (TYPE A) EA 100.0000 100.00 1.000 100.00 S) 30 END ANCHOR ASSEMBLY (TYPE SFT) EA 900.0000 17,100.00 18.000 16,200.00 19.000 17,100.00 S) 31 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,700.0000 8,100.00 3.000 8,100.00 3.000 8,100.00 S) 32 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,100.0000 35,700.00 17.000 35,700.00 17.000 35,700.00 S) 33 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 20,500.00 267.220 13,361.00 267.220 13,361.00 S) 34 THERMOPLASTIC TRAFFIC STRIPE M 0.8000 55,440.00 27,338.000 21,870.40 70,237.000 56,189.60 S) (SPRAYABLE) 35 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 12,925.00 5,952.000 14,880.00 7,096.500 17,741.25 S) 36 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 16,800.00 2,693.000 6,732.50 5,510.000 13,775.00 S) (BROKEN 3.66 M - 0.92 M) 37 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7000 35,000.00 244,446.000 171,112.20 270,000.000 189,000.00 S) (BROKEN 10.98 M - 3.66 M) 38 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7000 1,232.00 1,551.000 1,085.70 1,551.000 1,085.70 S) (BROKEN 5.18 M - 2.14 M) 39 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.5000 575.00 0.000 0.00 S) 40 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 25,980.00 1,726.000 5,178.00 4,161.000 12,483.00 S) PROGRAM CAS145 PAGE 3 DATE 10/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1E7204 TIME 10:02 AM ESTIMATE NO. 08 BID OPENING 11/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: FEUSI, ROBERT DATE OF THIS ESTIMATE 10/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 637,306.73 5,312,100.20 ADJUSTMENT OF COMPENSATION 96,512.12 96,512.12 EXTRA WORK 123,508.39 123,508.39 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 857,327.24 5,532,120.71 41 MOBILIZATION LS 400,000.0000 400,000.00 1.000 400,000.00 ORIGINAL CONTRACT AMOUNT 6,085,866.55 TOTAL WORK COMPLETED 857,327.24 5,932,120.71 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -20,000.00 TOTAL 857,327.24 5,912,120.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/27/06 85 03/26/07 01/11/07 10/30/07 85 109 0 0 91% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PER RE REQUEST FEUSI, ROBERT RESIDENT ENGINEER PROGRAM CAS145 DATE 10/24/07