PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/19 EST. NO. 004 TIME 10:15 AM R.E. NAME: ELGHASSEIN, DEYA DEAN 03-1F2304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 1,100.00 E.W. @ F.A.(+) 010819 N 0002.0 004 0001 4,564.67 E.W. @ L.S.(+) 041519 N 0006.0 005 0001 5,394.82 E.W. @ L.S.(+) 013119 N 0001.0 11,059.49 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 11,059.49 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/19 EST. NO. 004 TIME 10:15 AM R.E. NAME: ELGHASSEIN, DEYA DEAN 03-1F2304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F2304 TIME 10:15 AM ESTIMATE NO. 004 BID OPENING 07/17/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: ELGHASSEIN, DEYA DEAN DATE OF THIS ESTIMATE 04/23/19 LOCATION PROGRESS ESTIMATE 03-VAR ----------------- GRANITE ROCK COMPANY IN SACRAMENTO AND YOLO COUNTIES AT 5225 HELLYER AVENUE VARIOUS LOCATIONS SAN JOSE CA 95138 FED. AID NO. ACIM- 080-3(245)E INSTALL RAMP METERS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.160 800.00 0.710 3,550 003 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 0.160 3,200.00 0.710 14,200 004 TRAFFIC CONTROL SYSTEM LS 387,000.0000 387,000.00 0.160 61,920.00 0.560 216,720 005 TYPE III BARRICADE EA 100.0000 2,000.00 8.000 800.00 11.000 1,100 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 3.0000 3,540.00 1,180.000 3,540 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.160 1,600.00 0.610 6,100 008 TEMPORARY RAILING (TYPE K) LF 48.0000 74,880.00 1,560.000 74,880 009 ALTERNATIVE TEMPORARY CRASH CUSHION EA 3,000.0000 6,000.00 2.000 6,000 010 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.160 800.00 0.560 2,800 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 012 MOVE-IN/MOVE-OUT EA 2,500.0000 2,500.00 1.000 2,500 (TEMPORARY EROSION CONTROL) 013 TEMPORARY HYDRAULIC MULCH SQYD 1.0000 1,170.00 0.000 0 (BONDED FIBER MATRIX) 014 TEMPORARY COVER SQYD 80.0000 47,200.00 737.500 59,000 015 TEMPORARY CHECK DAM LF 3.5000 280.00 0.000 0 016 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 900.00 1.000 150.00 3.000 450 017 TEMPORARY FIBER ROLL LF 3.0000 13,440.00 1,900.000 5,700 018 TEMPORARY LARGE SEDIMENT BARRIER LF 7.0000 7,700.00 0.000 0 019 TEMPORARY SILT FENCE LF 5.0000 2,550.00 0.000 0 020 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 16,000.00 2.000 8,000 021 STREET SWEEPING LS 5,000.0000 5,000.00 0.160 800.00 0.360 1,800 022 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.500 2,500.00 1.000 5,000 PROGRAM CAS145 PAGE 2 DATE 04/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F2304 TIME 10:15 AM ESTIMATE NO. 004 BID OPENING 07/17/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: ELGHASSEIN, DEYA DEAN DATE OF THIS ESTIMATE 04/23/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ASBESTOS COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.000 0 024 TREATED WOOD WASTE LB 0.5000 1,725.00 1,550.000 775 025 ROADWAY EXCAVATION CY 55.0000 264,550.00 1,147.000 63,085.00 2,453.000 134,915 026 SHOULDER BACKING T 90.0000 19,800.00 .000 03 027 STRUCTURE EXCAVATION (RETAINING WALL) CY 85.0000 62,900.00 740.000 62,90 (F) 028 STRUCTURE BACKFILL (RETAINING WALL) CY 55.0000 51,700.00 258.000 14,19 (F) 029 IMPORTED BORROW (CY) CY 4.0000 3,400.00 0.000 030 REMOVE TREE EA 2,500.0000 10,000.00 4.000 10,000.00 4.000 10,00 031 WOOD MULCH CY 43.0000 23,220.00 0.000 032 REMOVE IRRIGATION FACILITY LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,50 033 2" REMOTE CONTROL VALVE EA 750.0000 2,250.00 0.000 034 2" GATE VALVE EA 750.0000 750.00 0.000 035 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 11.0000 2,750.00 0.000 (F) LINE) 036 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 12.0000 3,000.00 0.000 (F) (SUPPLY LINE) 037 2" PLASTIC PIPE (SCHEDULE 40) LF 15.0000 180.00 0.000 (F) (SUPPLY LINE) 038 2" PLASTIC PIPE (CLASS 315) LF 15.0000 9,900.00 0.000 (F) (SUPPLY LINE) 039 3" PLASTIC PIPE (CLASS 315) LF 18.0000 8,640.00 0.000 (F) (SUPPLY LINE) 040 8" CORRUGATED HIGH DENSITY LF 67.0000 1,742.00 26.000 1,742.00 26.000 1,74 POLYETHYLENE PIPE CONDUIT 041 6" CORRUGATED STEEL PIPE CONDUIT LF 90.0000 1,350.00 0.000 (.064" THICK) 042 DRY SEED (SQFT) SQFT 0.0400 3,096.00 0.000 043 BONDED FIBER MATRIX (SQFT) SQFT 0.1500 11,085.00 0.000 044 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 7.5000 1,875.00 0.000 045 FIBER ROLLS LF 2.7000 3,105.00 0.000 046 CLASS 2 AGGREGATE BASE (CY) CY 125.0000 61,250.00 639.000 79,875.00 639.000 79,87 047 LIME TREATED SUB-BASE CY 100.0000 122,000.00 0.000 048 HIGH FRICTION SURFACE TREATMENT SQYD 44.0000 319,440.00 0.000 049 HOT MIX ASPHALT (TYPE A) T 155.0000 229,400.00 581.000 ,055.00 581.000 90,0553 1PROGRAM CAS145 PAGE DATE 04/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F230 TIME 10:15 AM ESTIMATE NO. 00 BID OPENING 07/17/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/1 R.E. NAME: ELGHASSEIN, DEYA DEAN DATE OF THIS ESTIMATE 04/23/1 ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- 050 HOT MIX ASPHALT-OPEN GRADED TON 250.0000 95,000.00 0.000 (OPEN GRADED FRICTION COURSE) 051 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.0000 450.00 0.000 052 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 3.0000 5,640.00 0.000 053 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.0000 1,920.00 0.000 054 TACK COAT T 1,000.0000 6,900.00 .000 03 055 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.0000 53,500.00 0.000 056 STRUCTURAL CONCRETE, RETAINING WALL CY 1,000.0000 300,000.00 90.000 90,000.00 300.000 300,00 (F) 057 STRUCTURAL CONCRETE, DRAINAGE INLET CY 2,800.0000 9,520.00 0.970 2,716.00 0.970 2,71 (F) 058 MINOR CONCRETE (MINOR STRUCTURE) CY 6,000.0000 11,400.00 1.360 8,160.00 1.360 8,16 (F) 059 BAR REINFORCING STEEL (RETAINING WALL) L 1.9000 9,470.00 15,650.000 29,735.00 31,300.000 59,4703 (F) 060 18" REINFORCED CONCRETE PIPE LF 500.0000 6,150.00 11.000 5,500.00 11.000 5,50 061 REMOVE CULVERT (LF) LF 200.0000 400.00 0.000 062 REMOVE INLET EA 1,200.0000 1,200.00 0.000 063 ADJUST INLET EA 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,50 064 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 065 MISCELLANEOUS IRON AND STEEL LB 3.0000 1,980.00 326.000 978.00 326.000 97 (F) 066 DELINEATOR (CLASS 1) EA 40.0000 1,720.00 0.000 067 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 2,400.00 0.000 068 RELOCATE ROADSIDE SIGN EA 220.0000 1,760.00 0.000 069 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 448.00 0.000 (0.063"-UNFRAMED) 070 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 1,100.00 0.000 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 071 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.0000 550.00 0.000 072 ROADSIDE SIGN - ONE POST EA 350.0000 350.00 0.000 073 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 150.0000 1,200.00 0.000 METHOD) 074 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 33.0000 21,120.00 0.000 075 VEGETATION CONTROL (MINOR CONCRETE) SQYD 140.0000 36,400.00 0.000 1PROGRAM CAS145 PAGE DATE 04/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F230 TIME 10:15 AM ESTIMATE NO. 00 BID OPENING 07/17/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/1 R.E. NAME: ELGHASSEIN, DEYA DEAN DATE OF THIS ESTIMATE 04/23/1 ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- 076 TRANSITION RAILING (TYPE WB-31) EA 5,000.0000 10,000.00 0.000 077 END ANCHOR ASSEMBLY (TYPE SFT) EA 885.0000 1,770.00 0.000 078 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,100.0000 20,400.00 0.000 079 REMOVE GUARDRAIL LF 15.0000 2,700.00 102.000 1,53 080 THERMOPLASTIC PAVEMENT MARKING SQFT 12.0000 4,800.00 0.000 081 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 3,960.00 0.000 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 082 6" THERMOPLASTIC TRAFFIC STRIPE LF 8.0000 320.00 0.000 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 083 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.5000 21,245.00 0.000 (ENHANCED WET NIGHT VISIBILITY) 084 8" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 4,300.00 0.000 (ENHANCED WET NIGHT VISIBILITY) 085 6" RUMBLE STRIP STA 3,000.0000 10,500.00 0.000 (ASPHALT CONCRETE PAVEMENT) 086 RAMP METERING SYSTEM LS 630,000.0000 630,000.00 0.320 201,600.00 0.440 277,20 087 CLOSED CIRCUIT TELEVISION SYSTEM LS 105,000.0000 105,000.00 0.300 31,500.00 0.300 31,50 088 MODIFYING EXISTING ELECTRICAL SYSTEM LS 280,000.0000 280,000.00 0.050 14,000.00 0.050 14,00 089 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 090 PLACE HOT MIX ASPHALT SQYD 70.0000 1,050.00 0.000 (MISCELLANEOUS AREA) 091 REMOVE OVERSIDE DRAIN EA 1,500.0000 3,000.00 1.000 1,50 1PROGRAM CAS145 PAGE DATE 04/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F230 TIME 10:15 AM ESTIMATE NO. 00 BID OPENING 07/17/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/1 R.E. NAME: ELGHASSEIN, DEYA DEAN DATE OF THIS ESTIMATE 04/23/1 ----------------------------------------------------------------------------------------------------------------------------------- ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMO ----------------------------------------------------------------------------------------------------------------------------------- SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 707,516.00 1,520,846.0 0 ADJUSTMENT OF COMPENSATION 0.00 0.0 0 EXTRA WORK 11,059.49 11,059.4 0 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 718,575.49 1,531,905.4 0092 MOBILIZATION LS 390,000.0000 390,000.00 0.950 370,50 0 ORIGINAL CONTRACT AMOUNT 3,961,391.00 0 TOTAL WORK COMPLETED 718,575.49 1,902,405.4 0 MATERIALS ON HAND ON SITE 111,194.1 0 DEDUCTIONS 0.00 0.0 0 TOTAL 718,575.49 2,013,599.6 0 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE 0 N O N E 0DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 0 10/08/18 45 01/07/19 01/07/19 05/28/19 22 49 3 0 49% 46% PROGRESS IS SATISFACTORY ELGHASSEIN, DEYA DEAN RESIDENT ENGINEER 1 PROGRAM CAS145 PAGE 1 DATE 04/23/19