PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/15/13 EST. NO.08 TIME 02:07 PM R.E. NAME: WESTOVER, MARK 03-1F6004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 012 0001 577.48 E.W. @ F.A.(+) 032813 N 001 0 0002 1,392.41 032813 N 002 0 0003 4,618.57 A.C. @ L.S.(+) 040513 N 0003 0 6,588.46 TOTAL THIS ESTIMATE 179,207.83 TOTAL PREVIOUS ESTIMATE 185,796.29 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/15/13 EST. NO.08 TIME 02:07 PM R.E. NAME: WESTOVER, MARK 03-1F6004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ELEC REPAIR-CONDUIT -9,142.27 03 RTN ELEC REPAIR COND 9,142.27 04 MISSING FNL CEM4401 -10,000.00 08 -10,000.00 -10,000.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 10/12 -7,000.00 02 PER LTR DATED 12/12 -3,000.00 04 RETURN DEDUCT 10/12 7,000.00 04 RETURN DEDUCT 12/12 3,000.00 05 PER LTR DATED 3/13 -2,000.00 07 CERTIFIED PAYROLLS -10,000.00 08 -10,000.00 -12,000.00 TOTAL DEDUCTIONS -20,000.00 -22,000.00 PROGRAM CAS145 PAGE 1 DATE 05/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F6004 TIME 02:07 PM ESTIMATE NO. 08 BID OPENING 05/30/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/08/13 R.E. NAME: WESTOVER, MARK DATE OF THIS ESTIMATE 05/15/13 LOCATION RERUN PROGRESS ESTIMATE AFTER ACCEPTANCE 03-ED-193-23.4/ .0 ---------------------------------------- C W FOX CONSTRUCTION INC IN EL DORADO COUNTY NEAR 2701 SECRET LAKE TRAIL PLACERVILLE 2.0 MILES NORTH OF THE COOL CA 95614 SOUTH FORK AMERICAN RIVER BRIDGE FED. AID NO. STP-S193(9)E CONSTRUCT GABION, DRAINAGE, PAVE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 1,448.7000 1,448.70 1.000 1,448 002 PREPARE WATER POLLUTION CONTROL LS 987.0000 987.00 0.246 242.80 1.000 987 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 252.0000 1,512.00 6.000 1,512 004 CONSTRUCTION AREA SIGNS LS 4,503.0000 4,503.00 1.000 4,503 005 TRAFFIC CONTROL SYSTEM LS 24,560.0000 24,560.00 1.000 24,560 006 TEMPORARY TRAFFIC STRIPE (TAPE) LF 8.7000 2,610.00 300.000 2,610 007 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 15.0000 660.00 44.000 660 008 TEMPORARY TRAFFIC STRIPE (PAINT) LF 3.3000 1,617.00 0.000 0 009 CHANNELIZER (SURFACE MOUNTED) EA 41.0000 574.00 14.000 574 010 TEMPORARY SIGNAL SYSTEM LS 121,558.0000 121,558.00 1.000 121,558 011 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,552.0000 5,552.00 1.000 5,552 012 TEMPORARY RAILING (TYPE K) LF 27.8000 36,696.00 1,320.000 36,696 013 TEMPORARY CRASH CUSHION MODULE EA 258.0000 11,352.00 44.000 11,352 014 TEMPORARY TRAFFIC SCREEN LF 7.4500 9,834.00 1,320.000 9,834 015 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 17.1000 5,130.00 291.000 4,976 STRIPE (HAZARDOUS WASTE) 016 REMOVE CULVERT (LF) LF 32.0000 1,024.00 32.000 1,024 017 REMOVE INLET EA 683.0000 683.00 1.000 683 018 CLEARING AND GRUBBING (LS) LS 5,822.0000 5,822.00 1.000 5,822 019 ROADWAY EXCAVATION CY 76.0000 33,440.00 16.000 1,216.00 466.000 35,416 020 LEAD COMPLIANCE PLAN LS 2,413.0000 2,413.00 1.000 2,413 021 SHOULDER BACKING CY 104.2500 1,980.75 0.000 0 022 IMPORTED BORROW (CY) CY 56.2500 15,862.50 100.000 5,625 PROGRAM CAS145 PAGE 2 DATE 05/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F6004 TIME 02:07 PM ESTIMATE NO. 08 BID OPENING 05/30/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/08/13 R.E. NAME: WESTOVER, MARK DATE OF THIS ESTIMATE 05/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FIBER ROLLS LF 11.7000 877.50 75.000 877 024 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.4300 3,543.20 8,240.000 3,543 025 ROLLED EROSION CONTROL PRODUCT SQFT 2.6000 2,860.00 1,100.000 2,860 (NETTING) 026 GUARD RAILING WEED CONTROL MAT (FIBER) SQYD 7.4500 1,192.00 4.000 29.80 4.000 29 027 CLASS 2 AGGREGATE BASE (CY) CY 52.2500 18,287.50 10.000 522.50 350.000 18,287 028 HOT MIX ASPHALT (TYPE A) TON 120.5000 44,585.00 11.900 1,433.95 452.120 54,480 029 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 11.5000 1,035.00 0.000 0 030 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 7.7500 3,720.00 0.000 0 031 PLACE HOT MIX ASPHALT SQYD 25.5000 8,542.50 335.000 8,542 (MISCELLANEOUS AREA) 032 TACK COAT TON 1,585.0000 475.50 0.300 475 033 MINOR CONCRETE (MINOR STRUCTURE) CY 1,472.0000 8,390.40 5.660 8,331 (F) 034 18" CORRUGATED STEEL PIPE (.109" THICK) LF 171.5000 20,580.00 122.100 20,940 035 18" SLOTTED CORRUGATED STEEL PIPE LF 88.0000 36,080.00 393.000 34,584 (.079" THICK) 036 18" ANCHOR ASSEMBLY EA 1,608.5000 4,825.50 3.000 4,825 037 ROCK SLOPE PROTECTION CY 209.0000 2,926.00 14.000 2,926 (FACING, METHOD B) (CY) 038 GABION CY 211.0000 120,270.00 609.000 128,499 039 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 13.5500 1,002.70 74.000 1,002 040 MISCELLANEOUS IRON AND STEEL LB 3.5500 4,668.25 0.000 0 (F) 041 DELINEATOR (CLASS 2) EA 60.7500 1,032.75 0.000 0 042 MARKER (CULVERT) EA 49.2500 147.75 3.000 147.75 3.000 147 043 METAL BEAM GUARD RAILING (WOOD POST) LF 26.2500 12,600.00 0.000 0 044 IN-LINE TERMINAL SYSTEM EA 9,165.0000 18,330.00 2.000 18,330 (TYPE X-TENSION) 045 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5500 4,758.50 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F6004 TIME 02:07 PM ESTIMATE NO. 08 BID OPENING 05/30/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/08/13 R.E. NAME: WESTOVER, MARK DATE OF THIS ESTIMATE 05/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,592.80 586,488.88 ADJUSTMENT OF COMPENSATION 4,618.57 55,511.88 EXTRA WORK 1,969.89 130,284.41 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 10,181.26 772,285.17 046 MOBILIZATION LS 24,883.0000 24,883.00 1.000 24,883 ORIGINAL CONTRACT AMOUNT 635,432.00 TOTAL WORK COMPLETED 10,181.26 797,168.17 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -20,000.00 -22,000.00 TOTAL -9,818.74 775,168.17 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/16/12 65 08/27/12 07/31/12 04/08/13 118 51 57 0 100% 100% WESTOVER, MARK RESIDENT ENGINEER PROGRAM CAS145 DATE 05/15/13