PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/16/16 EST. NO. 002 TIME 10:56 AM R.E. NAME: JOHNSON, RYAN 03-1F9904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 26,515.04 E.W. @ L.S.(+) 091416 N 0001 0 004 0001 -2,000.00 A.C. @ L.S.(-) 091416 N 0001 0 24,515.04 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 24,515.04 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/16/16 EST. NO. 002 TIME 10:56 AM R.E. NAME: JOHNSON, RYAN 03-1F9904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/16/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F9904 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 03/16/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/16 R.E. NAME: JOHNSON, RYAN DATE OF THIS ESTIMATE 09/16/16 LOCATION PROGRESS ESTIMATE 03-BUT-32-6.0/10.2 ----------------- FRANKLIN CONSTRUCTION, INC. IN BUTTE COUNTY NEAR CHICO FROM 217 FLUME STREET, SUITE 200 POPLAR STREET TO ROUTE 99/32 CHICO CA 95928 SEPARATION FED. AID NO. NHP-P032(44) ADA COMPLIANCE CURB RAMPS, SIGNAL, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600 002 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 0.050 300.00 0.770 4,620 003 TRAFFIC CONTROL SYSTEM LS 136,000.0000 136,000.00 0.220 29,920.00 0.340 46,240 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,000.0000 11,000.00 0.220 2,420.00 0.340 3,740 005 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.220 550.00 0.340 850 006 PREPARE STORM WATER POLLUTION PREVENTION LS 1,600.0000 1,600.00 0.750 1,200 PLAN 007 RAIN EVENT ACTION PLAN EA 500.0000 4,000.00 0.000 0 008 STORM WATER SAMPLING AND ANALYSIS DAY EA 100.0000 1,400.00 0.000 0 009 STORM WATER ANNUAL REPORT EA 100.0000 200.00 0.000 0 010 MOVE-IN/MOVE-OUT EA 450.0000 2,700.00 0.000 0 (TEMPORARY EROSION CONTROL) 011 TEMPORARY HYDRAULIC MULCH SQYD 2.5000 4,350.00 0.000 0 (BONDED FIBER MATRIX) 012 TEMPORARY COVER SQYD 1.3500 2,349.00 0.000 0 013 TEMPORARY CHECK DAM LF 8.5000 1,700.00 0.000 0 014 TEMPORARY DRAINAGE INLET PROTECTION EA 220.0000 6,380.00 0.000 0 015 TEMPORARY FIBER ROLL LF 4.0000 4,800.00 0.000 0 016 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 0.000 0 017 ASBESTOS COMPLIANCE PLAN LS 1,350.0000 1,350.00 0.000 0 018 TREATED WOOD WASTE LB 1.0000 480.00 0.000 0 019 REMOVE CULVERT (ASBESTOS CEMENT PIPE) LF 189.0000 3,591.00 19.000 3,591.00 19.000 3,591 020 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 2,370.00 0.000 0 021 REMOVE ROADSIDE SIGN EA 84.0000 756.00 0.000 0 022 REMOVE CULVERT (LF) LF 17.0000 1,343.00 79.000 1,343.00 79.000 1,343 PROGRAM CAS145 PAGE 2 DATE 09/16/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F9904 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 03/16/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/16 R.E. NAME: JOHNSON, RYAN DATE OF THIS ESTIMATE 09/16/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE INLET EA 1,800.0000 23,400.00 4.000 7,200.00 11.000 19,800 024 RESET ROADSIDE SIGN EA 205.0000 2,665.00 0.000 0 025 REMOVE CONCRETE (CY) CY 152.0000 49,552.00 123.000 18,696.00 180.000 27,360 (F) 026 CLEARING AND GRUBBING (LS) LS 30,000.0000 30,000.00 0.250 7,500 027 DEVELOP WATER SUPPLY LS 1,000.0000 1,000.00 0.400 400 028 ROADWAY EXCAVATION CY 186.0000 219,480.00 634.000 117,924.00 891.000 165,726 029 ROADSIDE CLEARING LS 2,000.0000 2,000.00 0.120 240 030 WOOD MULCH CY 68.0000 18,360.00 0.000 0 031 REPLACE ASPHALT CONCRETE SURFACING CY 1,060.0000 21,200.00 0.000 0 032 HOT MIX ASPHALT (TYPE A) TON 176.0000 86,240.00 0.000 0 033 PLACE HOT MIX ASPHALT SQYD 25.0000 1,150.00 0.000 0 (MISCELLANEOUS AREA) 034 TACK COAT TON 1,300.0000 650.00 0.000 0 035 MINOR CONCRETE (MINOR STRUCTURE) CY 1,870.0000 37,400.00 9.100 17,017.00 12.470 23,318 (F) 036 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 182.00 0.000 0 (0.063"-UNFRAMED) 037 ROADSIDE SIGN - ONE POST EA 280.0000 2,240.00 0.000 0 038 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.5000 297.00 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 039 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.5000 121.00 0.000 0 040 CONCRETE BACKFILL (PIPE TRENCH) CY 340.0000 2,040.00 5.320 1,808.80 6.000 2,040 (F) 041 8" REINFORCED CONCRETE PIPE LF 480.0000 1,776.00 5.500 2,640.00 5.500 2,640 042 12" REINFORCED CONCRETE PIPE LF 157.0000 23,550.00 132.800 20,849.60 141.100 22,152 043 36" REINFORCED CONCRETE PIPE LF 2,100.0000 6,930.00 0.000 0 044 PERMEABLE MATERIAL (BLANKET) CY 1,360.0000 2,040.00 0.000 0 (F) 045 DRAINAGE INLET MARKER EA 72.0000 1,080.00 0.000 0 046 GRATED LINE DRAIN LF 197.0000 6,501.00 0.000 0 047 36" PRECAST CONCRETE PIPE MANHOLE LF 1,900.0000 6,840.00 3.300 6,270 048 MINOR CONCRETE (MISCELLANEOUS CY 583.0000 12,243.00 0.000 0 CONSTRUCTION) PROGRAM CAS145 PAGE 3 DATE 09/16/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F9904 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 03/16/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/16 R.E. NAME: JOHNSON, RYAN DATE OF THIS ESTIMATE 09/16/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 MINOR CONCRETE (DRIVEWAY) CY 545.0000 137,340.00 0.000 0 050 MINOR CONCRETE (CURB, SIDEWALK AND CY 468.0000 365,040.00 116.000 54,288.00 116.000 54,288 CURB RAMP) 051 PRE/POST CONSTRUCTION SURVEYS EA 380.0000 34,200.00 0.000 0 052 MISCELLANEOUS IRON AND STEEL LB 2.0000 9,890.00 2,556.000 5,112.00 2,556.000 5,112 (F) 053 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 3,950.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 054 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 0.220 770.00 0.340 1,190 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 09/16/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1F9904 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 03/16/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/16 R.E. NAME: JOHNSON, RYAN DATE OF THIS ESTIMATE 09/16/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 284,429.40 401,221.60 ADJUSTMENT OF COMPENSATION -2,000.00 -2,000.00 EXTRA WORK 26,515.04 26,515.04 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 308,944.44 425,736.64 055 MOBILIZATION LS 26,000.0000 26,000.00 0.450 11,700.00 0.950 24,700 ORIGINAL CONTRACT AMOUNT 1,337,326.00 TOTAL WORK COMPLETED 320,644.44 450,436.64 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 320,644.44 450,436.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/14/16 85 08/08/16 08/08/16 01/03/17 29 2 13 0 31% 30% PROGRESS IS SATISFACTORY JOHNSON, RYAN RESIDENT ENGINEER PROGRAM CAS145 DATE 09/16/16