PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/13/19 EST. NO. 001 TIME 02:37 PM R.E. NAME: SCOTT, JEFF 03-1G0504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/13/19 EST. NO. 001 TIME 02:37 PM R.E. NAME: SCOTT, JEFF 03-1G0504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1G0504 TIME 02:37 PM ESTIMATE NO. 001 BID OPENING 04/23/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: SCOTT, JEFF DATE OF THIS ESTIMATE 08/13/19 LOCATION PROGRESS ESTIMATE 03-SAC-99-5.0/16.1 ----------------- T.P.A. CONSTRUCTION, INC. IN SACRAMENTO COUNTY AT VARIOUS 2406 CLUBHOUSE DRIVE; LOCATIONS ROCKLIN CA 95765 FED. AID NO. N O N E TREAT DECKS WITH METHACRYLATE OR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.167 1,503.00 0.167 1,503 003 TRAFFIC CONTROL SYSTEM LS 28,000.0000 28,000.00 0.167 4,676.00 0.167 4,676 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,000.0000 4,000.00 0.167 668.00 0.167 668 005 JOB SITE MANAGEMENT LS 2,000.0000 2,000.00 0.167 334.00 0.167 334 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000 007 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 600.00 3.000 300.00 3.000 300 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 25.0000 15,250.00 0.000 0 STRIPE (HAZARDOUS WASTE) 009 STRUCTURAL CONCRETE, BRIDGE (REPAIR) CY 3,000.0000 900.00 0.000 0 (F) 010 DRILL AND BOND DOWEL LF 500.0000 1,000.00 0.000 0 011 CLEAN EXPANSION JOINT LF 50.0000 5,050.00 0.000 0 012 JOINT SEAL (MR 1") LF 80.0000 8,080.00 0.000 0 013 BAR REINFORCING STEEL (BRIDGE) LB 100.0000 2,600.00 0.000 0 (F) 014 PUBLIC SAFETY PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000 015 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3600 16,690.68 0.000 0 016 TREAT BRIDGE DECK SQFT 0.5800 26,890.54 0.000 0 (F) 017 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 60.0000 35,460.00 0.000 0 018 REMOVE CHIP SEAL SQFT 1.2000 41,372.40 34,477.000 41,372.40 34,477.000 41,372 019 PAINT BRIDGE IDENTIFICATION EA 100.0000 100.00 0.000 0 020 BRIDGE REMOVAL (PORTION) LS 8,000.0000 8,000.00 0.000 0 021 SCOUR MONITORING SYSTEM (LOCATION A) LS 32,000.0000 32,000.00 0.000 0 022 SCOUR MONITORING SYSTEM (LOCATION B) LS 32,000.0000 32,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1G0504 TIME 02:37 PM ESTIMATE NO. 001 BID OPENING 04/23/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: SCOTT, JEFF DATE OF THIS ESTIMATE 08/13/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 SCOUR MONITORING SYSTEM (LOCATION C) LS 33,000.0000 33,000.00 0.000 0 024 SCOUR MONITORING SYSTEM (LOCATION D) LS 33,000.0000 33,000.00 0.000 0 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 1,100.00 0.000 0 026 METAL BRIDGE RAILING (MODIFIED) LF 1,000.0000 15,000.00 0.000 0 (F) 027 RECONSTRUCT METAL RAILING (BRIDGE) LF 1,000.0000 9,000.00 0.000 0 028 4" TRAFFIC STRIPE TAPE LF 12.0000 18,600.00 0.000 0 029 4" TRAFFIC STRIPE TAPE (BROKEN 17-7) LF 10.0000 5,300.00 0.000 0 030 4" TRAFFIC STRIPE TAPE (BROKEN 36-12) LF 10.0000 5,000.00 0.000 0 031 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 10.0000 4,000.00 0.000 0 032 6" TRAFFIC STRIPE TAPE LF 18.0000 1,332.00 0.000 0 033 6" TRAFFIC STRIPE TAPE (BROKEN 17-7) LF 14.0000 518.00 0.000 0 034 8" TRAFFIC STRIPE TAPE (BROKEN 12-3) LF 25.0000 6,750.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-1G0504 TIME 02:37 PM ESTIMATE NO. 001 BID OPENING 04/23/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/19 R.E. NAME: SCOTT, JEFF DATE OF THIS ESTIMATE 08/13/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 53,853.40 53,853.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 53,853.40 53,853.40 035 MOBILIZATION LS 30,000.0000 30,000.00 0.750 22,500.00 0.750 22,500 ORIGINAL CONTRACT AMOUNT 439,593.62 TOTAL WORK COMPLETED 76,353.40 76,353.40 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 76,353.40 76,353.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/20/19 60 07/05/19 07/05/19 09/30/19 10 1 0 0 17% 17% PROGRESS IS SATISFACTORY SCOTT, JEFF RESIDENT ENGINEER PROGRAM CAS145 DATE 08/13/19