PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/24/08 EST. NO.06 TIME 09:17 AM R.E. NAME: CROSBY, TIM 03-2A9214 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0079 789.09 E.W. @ F.A.(+) 091508 N 0137.0 0080 809.61 091508 N 0138.0 0081 807.98 091608 N 0139.0 0082 809.24 091608 N 0141.0 0083 789.09 091708 N 0143.0 0084 811.67 091708 N 0145.0 0085 807.98 091808 N 0146.0 0086 810.25 091808 N 0147.0 0087 893.91 091908 N 0150.0 0088 809.32 092208 N 0151.0 0089 809.32 092308 N 0154.0 0090 809.32 092408 N 0158.0 0091 809.32 092508 N 0159.0 0092 789.09 092208 N 0160.0 0093 789.09 092308 N 0161.0 0094 789.09 092408 N 0162.0 0095 789.09 092508 N 0163.0 0096 522.41 092608 N 0164.0 0097 809.32 092908 N 0165.0 0098 789.09 092908 N 0166.0 0099 809.32 093008 N 0167.0 0100 789.09 093008 N 0168.0 0101 809.32 100108 N 0169.0 0102 789.09 100108 N 0170.0 0103 789.09 100208 N 0171.0 0104 809.32 100608 N 0172.0 0105 809.32 100708 N 0173.0 0106 123.76 100708 N 0174.0 0107 809.32 100808 N 0175.0 0108 727.82 090808 N 0176.0 0109 686.84 090908 N 0177.0 0110 686.84 091008 N 0178.0 0111 522.90 091108 N 0179.0 25,005.31 TOTAL THIS ESTIMATE 53,878.86 TOTAL PREVIOUS ESTIMATE 78,884.17 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/24/08 EST. NO.06 TIME 09:17 AM R.E. NAME: CROSBY, TIM 03-2A9214 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CPM DEDUCTION -7,247.50 01 RETURN CPM DEDUCT 7,247.50 02 CPM SCHEDULE -96,579.36 03 SWPPP DEFICIENCY -96,579.36 03 RETURN SWPPP DEDUCT 96,579.36 04 RETURN SWPPP DEDUCT 96,579.36 04 CPM RETENTION -116,929.21 05 RETURN CPM RETENTION 116,929.21 06 116,929.21 0.00 LABOR COMPLIANCE VIOLATION PER LTR DATED 7/08 -10,000.00 03 PER LTR DATED 8/08 -10,000.00 04 0.00 -20,000.00 TOTAL DEDUCTIONS 116,929.21 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 LOCATION PROGRESS ESTIMATE 03-PLA-89-T8.6/13.7 ----------------- MARTIN BROTHERS CONSTRUCTION IN PLACER COUNTY NEAR TAHOE CITY 20 LIGHT SKY COURT FROM ROUTE 89/28 JUNCTION TO SQUAW SACRAMENTO CA 95828 VALLEY ROAD FED. AID NO. ACST-P089(90)E ,P-P089(90)E ASPHALT CONCRETE SURFACING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 12,500.0000 12,500.00 0.250 3,125.00 0.250 3,125.00 02 TIME-RELATED OVERHEAD WDAY 1,950.0000 585,000.00 20.000 39,000.00 118.000 230,100.00 03 TEMPORARY FENCE (TYPE ESA) M 10.2500 9,020.00 102.000 1,045.50 04 PROTECTION OF MIGRATORY BIRDS LS 75,000.0000 75,000.00 0.350 26,250.00 05 CONSTRUCTION SITE MANAGEMENT LS 195,000.0000 195,000.00 0.166 32,370.00 0.393 76,635.00 06 PREPARE STORM WATER POLLUTION LS 3,250.0000 3,250.00 1.000 3,250.00 PREVENTION PLAN 07 DEWATERING (WATER POLLUTION CONTROL) LS 125,000.0000 125,000.00 0.166 20,750.00 0.393 49,125.00 08 TEMPORARY FIBER ROLL M 4.6500 40,548.00 80.000 372.00 494.000 2,297.10 09 TEMPORARY SILT FENCE M 3.0000 26,160.00 277.000 831.00 10 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,100.0000 13,200.00 3.000 3,300.00 11 TEMPORARY CONSTRUCTION ENTRANCE EA 1,200.0000 7,200.00 0.000 0.00 12 TEMPORARY COVER M2 2.5000 6,750.00 285.000 712.50 2,197.000 5,492.50 13 TEMPORARY DRAINAGE INLET PROTECTION EA 103.0000 23,690.00 22.000 2,266.00 14 TEMPORARY HYDRAULIC MULCH M2 0.9900 8,910.00 0.000 0.00 (POLYMER STABILIZED FIBER MATRIX) 15 STREET SWEEPING LS 240,000.0000 240,000.00 0.096 23,040.00 0.393 94,320.00 16 TEMPORARY CREEK DIVERSION SYSTEM LS 110,000.0000 110,000.00 0.066 7,260.00 0.393 43,230.00 17 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.310 1,240.00 S) 18 TRAFFIC CONTROL SYSTEM LS 405,000.0000 405,000.00 0.096 38,880.00 0.393 159,165.00 S) 19 TEMPORARY PAVEMENT MARKING M2 5.0000 900.00 0.000 0.00 S) (PAINT-2 COAT) 20 TEMPORARY TRAFFIC STRIPE (TAPE) M 3.5000 5,250.00 375.000 1,312.50 S) 21 TEMPORARY TRAFFIC STRIPE (PAINT-2 COAT) M 0.8000 56,560.00 0.000 0.00 S) 22 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 855.00 5.000 225.00 S) PROGRAM CAS145 PAGE 2 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PORTABLE CHANGEABLE MESSAGE SIGN LS 50,000.0000 50,000.00 0.096 4,800.00 0.393 19,650.00 S) 24 TEMPORARY RAILING (TYPE K) M 132.0000 72,600.00 147.000 19,404.00 S) 25 TEMPORARY CRASH CUSHION MODULE EA 185.0000 2,035.00 1.000 185.00 S) 26 ABANDON CULVERT EA 1,500.0000 9,000.00 2.000 3,000.00 5.000 7,500.00 27 REMOVE METAL BEAM GUARD RAILING M 22.0000 26,620.00 0.000 0.00 28 REMOVE FLARED END SECTION EA 350.0000 700.00 2.000 700.00 29 REMOVE PAINTED TRAFFIC STRIPE M 3.0000 106,200.00 0.000 0.00 S) (TEMPORARY) 30 REMOVE PAINTED TRAFFIC STRIPE M 6.0000 9,180.00 368.000 2,208.00 S) 31 REMOVE PAINTED PAVEMENT MARKING M2 12.0000 1,080.00 2.000 24.00 S) (TEMPORARY) 32 REMOVE ROADSIDE SIGN EA 100.0000 7,500.00 0.000 0.00 33 REMOVE ROADSIDE SIGN PANEL EA 150.0000 150.00 0.000 0.00 34 REMOVE ASPHALT CONCRETE DIKE M 15.0000 3,900.00 0.000 0.00 35 REMOVE OVERSIDE DRAIN EA 1,200.0000 1,200.00 0.000 0.00 36 REMOVE CULVERT M 160.0000 35,200.00 103.000 16,480.00 37 REMOVE INLET EA 750.0000 17,250.00 10.000 7,500.00 38 REMOVE HEADWALL EA 1,500.0000 12,000.00 1.000 1,500.00 2.000 3,000.00 39 REMOVE DOWNDRAIN EA 1,250.0000 6,250.00 0.000 0.00 40 REMOVE CONCRETE PAVEMENT M2 45.0000 3,600.00 0.000 0.00 41 REMOVE ASPHALT CONCRETE SURFACING M2 45.0000 2,700.00 0.000 0.00 42 REMOVE BASE AND SURFACING M3 125.0000 13,750.00 0.000 0.00 43 RESET ROADSIDE SIGN EA 350.0000 700.00 0.000 0.00 S) 44 ADJUST INLET EA 750.0000 16,500.00 0.000 0.00 45 ADJUST SLOTTED CORRUGATED STEEL PIPE M 290.0000 124,700.00 0.000 0.00 BEARING BAR TO GRADE 46 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 8.3000 45,318.00 275.000 2,282.50 275.000 2,282.50 S) 47 REMOVE CONCRETE (CURB AND GUTTER) M 20.0000 1,900.00 0.000 0.00 48 REMOVE CONCRETE SIDEWALK M2 9.0000 1,980.00 0.000 0.00 49 CAP INLET EA 750.0000 2,250.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CLEARING AND GRUBBING LS 150,000.0000 150,000.00 0.043 6,450.00 0.393 58,950.00 51 ROADWAY EXCAVATION M3 210.0000 1,295,700.00 1,411.500 296,415.00 52 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000.00 53 STRUCTURE EXCAVATION (TYPE DC) M3 700.0000 11,270.00 0.000 0.00 F) 54 STRUCTURE EXCAVATION (RETAINING WALL) M3 245.0000 303,800.00 696.000 170,520.00 F) 55 STRUCTURE BACKFILL (RETAINING WALL) M3 165.0000 130,845.00 261.750 43,188.75 315.750 52,098.75 F) 56 PERVIOUS BACKFILL MATERIAL (RETAINING M3 750.0000 22,500.00 20.100 15,075.00 20.100 15,075.00 F) WALL) 57 DITCH EXCAVATION M3 250.0000 40,000.00 75.000 18,750.00 58 EROSION CONTROL (TYPE D) M2 7.8000 140,400.00 4,000.000 31,200.00 4,000.000 31,200.00 S) 59 FIBER ROLLS M 7.8000 3,198.00 0.000 0.00 S) 60 EROSION CONTROL (SOD STRIP) M2 160.0000 9,600.00 0.000 0.00 S) 61 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 950.0000 8,550.00 1.000 950.00 1.000 950.00 S) 62 COIR MESH M2 4.5000 5,490.00 0.000 0.00 S) 63 EROSION CONTROL (TYPE I) M2 20.0000 82,400.00 0.000 0.00 S) 64 ROCK COLORATION LS 45,000.0000 45,000.00 0.000 0.00 S) 65 CONCRETE COLORATION LS 60,000.0000 60,000.00 0.000 0.00 S) 66 PLANT ESTABLISHMENT WORK LS 45,000.0000 45,000.00 0.000 0.00 S) 67 CAMCOUPLER ASSEMBLY EA 2,500.0000 7,500.00 0.000 0.00 S) 68 25 MM PLASTIC PIPE (PR 200) M 45.0000 4,590.00 0.000 0.00 SF)(SUPPLY LINE) 69 32 MM PLASTIC PIPE (PR 200) M 55.0000 1,485.00 0.000 0.00 SF)(SUPPLY LINE) 70 SPRINKLER (TYPE A-5) EA 110.0000 1,980.00 0.000 0.00 S) 71 CLASS 2 AGGREGATE BASE M3 97.7500 586,500.00 600.000 58,650.00 1,409.000 137,729.75 72 REPLACE ASPHALT CONCRETE SURFACING M3 367.0000 179,830.00 116.380 42,711.46 73 ASPHALT CONCRETE TONN 112.5000 3,183,750.00 2,640.810 297,091.13 2,747.210 309,061.13 74 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 95.0000 5,225.00 0.000 0.00 AREA) 75 STRUCTURAL CONCRETE, RETAINING WALL M3 975.0000 396,825.00 65.000 63,375.00 233.000 227,175.00 F) 76 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 385,500.00 1.630 2,445.00 43.330 64,995.00 F) PROGRAM CAS145 PAGE 4 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 MINOR CONCRETE (BACKFILL) M3 650.0000 13,000.00 0.000 0.00 78 ANTI-GRAFFITI COATING M2 20.0000 9,800.00 0.000 0.00 79 ARCHITECTURAL TEXTURE (RUBBLE MASONRY) M2 60.0000 29,400.00 86.000 5,160.00 215.000 12,900.00 80 BAR REINFORCING STEEL (EPOXY COATED) KG 4.0000 88,575.20 1,625.900 6,503.60 12,276.900 49,107.60 SF) 81 ROADSIDE SIGN - ONE POST EA 310.0000 20,460.00 0.000 0.00 82 ROADSIDE SIGN - TWO POST EA 650.0000 4,550.00 0.000 0.00 83 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 110.0000 110.00 0.000 0.00 METHOD) 84 PREPARE AND PAINT CONCRETE M2 40.0000 19,600.00 0.000 0.00 S) 85 200 MM PLASTIC PIPE (SCHEDULE 40) M 540.0000 27,540.00 2.000 1,080.00 86 300 MM PLASTIC PIPE (SCHEDULE 40) M 745.0000 3,725.00 0.000 0.00 87 300 MM CORRUGATED HIGH DENSITY M 490.0000 18,130.00 0.000 0.00 POLYETHYLENE PIPE (TYPE S) 88 450 MM CORRUGATED HIGH DENSITY M 500.0000 355,000.00 19.400 9,700.00 128.860 64,430.00 POLYETHYLENE PIPE (TYPE S) 89 600 MM CORRUGATED HIGH DENSITY M 515.0000 82,400.00 84.700 43,620.50 POLYETHYLENE PIPE (TYPE S) 90 750 MM CORRUGATED HIGH DENSITY M 650.0000 37,700.00 0.000 0.00 POLYETHYLENE PIPE (TYPE S) 91 300 MM CORRUGATED STEEL PIPE M 440.0000 1,320.00 0.000 0.00 (2.01 MM THICK) 92 450 MM CORRUGATED STEEL PIPE M 580.0000 4,640.00 1.700 986.00 (2.01 MM THICK) 93 600 MM CORRUGATED STEEL PIPE M 672.0000 8,064.00 0.000 0.00 (2.01 MM THICK) 94 450 MM SLOTTED CORRUGATED STEEL PIPE M 480.0000 105,600.00 0.000 0.00 (2.01 MM THICK) 95 PERMEABLE MATERIAL M3 365.0000 24,820.00 0.400 146.00 18.640 6,803.60 96 450 MM CORRUGATED STEEL PIPE DOWNDRAIN M 840.0000 11,760.00 0.000 0.00 (2.77 MM THICK) 97 900 MM CORRUGATED STEEL PIPE INLET M 1,780.0000 44,500.00 1.380 2,456.40 5.380 9,576.40 (2.77 MM THICK) 98 450 MM STEEL FLARED END SECTION EA 450.0000 11,700.00 6.000 2,700.00 99 600 MM STEEL FLARED END SECTION EA 650.0000 5,850.00 6.000 3,900.00 00 750 MM STEEL FLARED END SECTION EA 750.0000 3,000.00 0.000 0.00 01 200 MM GATE VALVE EA 6,500.0000 6,500.00 0.000 0.00 02 1200 MM PRECAST CONCRETE PIPE MANHOLE EA 12,500.0000 25,000.00 0.000 0.00 03 ROCK SLOPE PROTECTION (1/2T, METHOD A) M3 250.0000 10,750.00 0.000 0.00 PROGRAM CAS145 PAGE 5 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 ROCK SLOPE PROTECTION M3 260.0000 78,000.00 119.060 30,955.60 (FACING, METHOD B) 05 ROCK SLOPE PROTECTION FABRIC M2 10.0000 17,400.00 5.620 56.20 492.980 4,929.80 06 MINOR CONCRETE (CURB) M3 415.0000 377,650.00 130.000 53,950.00 312.500 129,687.50 07 MINOR CONCRETE (MISCELLANEOUS M3 650.0000 104,000.00 35.200 22,880.00 35.710 23,211.50 CONSTRUCTION) 08 MINOR CONCRETE (CURB AND GUTTER) M3 430.0000 94,600.00 0.000 0.00 09 MINOR CONCRETE (DRIVEWAY) M3 117.0000 1,170.00 0.000 0.00 10 MINOR CONCRETE (GUTTER) M 122.0000 37,820.00 0.000 0.00 11 MINOR CONCRETE (SIDEWALK) M3 108.0000 3,240.00 0.000 0.00 12 MISCELLANEOUS IRON AND STEEL KG 4.5000 92,155.50 3,513.000 15,808.50 SF) 13 CONCRETE BARRIER DELINEATOR (400 MM) EA 25.0000 375.00 0.000 0.00 14 DELINEATOR (CLASS 2) EA 40.0000 8,200.00 0.000 0.00 15 MARKER (CULVERT) EA 50.0000 7,000.00 0.000 0.00 16 HIGHWAY POST MARKER EA 56.0000 560.00 0.000 0.00 17 OBJECT MARKER (TYPE L-1) EA 56.0000 952.00 0.000 0.00 18 METAL BEAM GUARD RAILING M 100.0000 84,000.00 0.000 0.00 S) (2.1 M WOOD POST) 19 CABLE RAILING M 150.0000 31,500.00 0.000 0.00 S) 20 TRANSITION RAILING (TYPE WB) EA 7,250.0000 87,000.00 0.000 0.00 S) 21 END CAP (TYPE A) EA 100.0000 800.00 0.000 0.00 S) 22 END CAP (TYPE TA) EA 125.0000 750.00 0.000 0.00 S) 23 END ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 2,400.00 0.000 0.00 S) 24 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,000.0000 9,000.00 0.000 0.00 S) 25 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,850.0000 28,500.00 0.000 0.00 S) 26 CRASH CUSHION (ADIEM) EA 17,500.0000 17,500.00 0.000 0.00 S) 27 CONCRETE BARRIER (TYPE 60) M 425.0000 19,550.00 0.000 0.00 28 CONCRETE BARRIER (TYPE 60 MOD) M 700.0000 56,700.00 0.000 0.00 29 CONCRETE BARRIER (TYPE 60D) M 382.5000 87,975.00 0.000 0.00 30 THERMOPLASTIC PAVEMENT MARKING M2 180.0000 3,780.00 0.000 0.00 S) (RECESSED) PROGRAM CAS145 PAGE 6 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 200 MM THERMOPLASTIC TRAFFIC STRIPE M 12.0000 9,360.00 0.000 0.00 S) (RECESSED) 32 100 MM THERMOPLASTIC TRAFFIC STRIPE M 8.0000 1,200.00 0.000 0.00 S) (RECESSED) (BROKEN 5.18 M - 2.14 M) 33 100 MM THERMOPLASTIC TRAFFIC STRIPE M 12.0000 181,200.00 0.000 0.00 S) (RECESSED) 34 100 MM THERMOPLASTIC TRAFFIC STRIPE M 8.0000 22,800.00 0.000 0.00 S) (RECESSED, BROKEN 10.98 M - 3.66 M) 35 100 MM TWO-COMPONENT PAINT M 6.0000 97,200.00 0.000 0.00 S) TRAFFIC STRIPE 36 TWO-COMPONENT PAINT PAVEMENT MARKING M2 180.0000 13,140.00 0.000 0.00 S) 37 MODIFY ROADSIDE WEATHER INFORMATION LS 19,500.0000 19,500.00 0.000 0.00 S) SYSTEM (RWIS) 38 MODIFY TRAFFIC MONITORING STATION LS 3,000.0000 3,000.00 0.000 0.00 S) (COUNT) 39 MODIFY SIGNAL LS 11,000.0000 11,000.00 0.000 0.00 S) 40 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 41 EROSION CONTROL (BLANKET) M2 1.3500 1,539.00 0.000 0.00 S) PROGRAM CAS145 PAGE 7 DATE 10/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2A9214 TIME 09:17 AM ESTIMATE NO. 06 BID OPENING 12/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CROSBY, TIM DATE OF THIS ESTIMATE 10/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 796,369.08 2,611,471.19 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 25,005.31 78,884.17 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 821,374.39 2,690,355.36 42 MOBILIZATION LS 612,500.3000 612,500.30 0.200 122,500.06 0.950 581,875.29 ORIGINAL CONTRACT AMOUNT 12,837,505.00 TOTAL WORK COMPLETED 943,874.45 3,272,230.65 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 116,929.21 -20,000.00 TOTAL 1,060,803.66 3,252,230.65 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/06/08 460 05/22/08 05/01/08 07/14/09 117 2 0 0 23% 39% PROGRESS IS SATISFACTORY CROSBY, TIM RESIDENT ENGINEER PROGRAM CAS145 DATE 10/24/08