PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/23/10 EST. NO.02 TIME 01:08 PM R.E. NAME: HENNEKE, LARRY 03-2C8444 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 3,473.25 E.W. @ L.S.(+) 092010 N 001 0 3,473.25 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 3,473.25 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/23/10 EST. NO.02 TIME 01:08 PM R.E. NAME: HENNEKE, LARRY 03-2C8444 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 9/2010 -10,000.00 02 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 09/23/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2C8444 TIME 01:08 PM ESTIMATE NO. 02 BID OPENING 04/20/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/16/10 R.E. NAME: HENNEKE, LARRY DATE OF THIS ESTIMATE 09/23/10 LOCATION PROGRESS ESTIMATE 03-SAC-5501 ----------------- D G GRANADE INC IN SACRAMENTO COUNTY IN 4420 BUSINESS DRIVE SACRAMENTO AT THE TRANSPORTATION SHINGLE SPRINGS CA 95682 LABORATORY AT 5900 FOLSOM BOULEVARD FED. AID NO. N O N E CONSTRUCT STORAGE BUILDING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1,680.0000 1,680.00 0.000 0.00 02 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 1,250.00 0.000 0.00 03 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 04 CONSTRUCTION SITE MANAGEMENT LS 1,680.0000 1,680.00 0.500 840.00 05 PREPARE WATER POLLUTION CONTROL LS 840.0000 840.00 1.000 840.00 PROGRAM 06 TEMPORARY CONSTRUCTION ENTRANCE EA 1,680.0000 1,680.00 0.000 0.00 07 TEMPORARY DRAINAGE INLET PROTECTION EA 168.0000 2,016.00 0.000 0.00 08 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,344.0000 1,344.00 0.000 0.00 09 ABANDON CULVERT EA 476.0000 2,856.00 4.000 1,904.00 10 ABANDON INLET EA 524.1600 5,241.60 7.000 3,669.12 11 ABANDON MANHOLE EA 739.2000 1,478.40 2.000 1,478.40 12 REMOVE CULVERT EA 633.9200 633.92 1.000 633.92 1.000 633.92 13 REMOVE INLET EA 576.8000 576.80 1.000 576.80 1.000 576.80 14 ROADWAY EXCAVATION CY 33.6000 55,776.00 1,245.000 41,832.00 15 CLASS 2 AGGREGATE BASE CY 38.7600 69,768.00 0.000 0.00 16 HOT MIX ASPHALT TON 73.7700 95,163.30 0.000 0.00 17 MINOR CONCRETE (MINOR STRUCTURE) CY 761.6000 22,848.00 0.000 0.00 F) 18 MINOR CONCRETE (BACKFILL) CY 215.0400 4,945.92 14.000 3,010.56 14.000 3,010.56 19 15" ALTERNATIVE PIPE CULVERT LF 44.8000 49,728.00 1,052.000 47,129.60 1,052.000 47,129.60 20 48" PRECAST CONCRETE PIPE MANHOLE LF 694.4000 27,776.00 0.000 0.00 21 MISCELLANEOUS IRON AND STEEL LB 1.6800 12,756.24 0.000 0.00 F) 22 PAINT TRAFFIC STRIPE (2-COAT) LF 0.9000 1,377.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 09/23/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2C8444 TIME 01:08 PM ESTIMATE NO. 02 BID OPENING 04/20/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/16/10 R.E. NAME: HENNEKE, LARRY DATE OF THIS ESTIMATE 09/23/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PARKING BUMPER (PRECAST CONCRETE) EA 29.1200 1,426.88 0.000 0.00 24 BUILDING WORK LS 2826,587.0000 2,826,587.00 0.065 183,728.16 0.102 288,311.87 25 LEAD COMPLIANCE PLAN LS 1,764.0000 1,764.00 0.000 0.00 26 TEMPORARY FENCE (TYPE CL-6) LF 1.7400 2,644.80 1,520.000 2,644.80 27 PHOTOVOLTAIC SYSTEM LS 672,000.0000 672,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 09/23/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2C8444 TIME 01:08 PM ESTIMATE NO. 02 BID OPENING 04/20/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/16/10 R.E. NAME: HENNEKE, LARRY DATE OF THIS ESTIMATE 09/23/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 235,079.04 392,871.07 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 3,473.25 3,473.25 SUBTOTAL AMOUNT EARNED 238,552.29 396,344.32 ORIGINAL CONTRACT AMOUNT 3,865,837.86 TOTAL WORK COMPLETED 238,552.29 396,344.32 MATERIALS ON HAND ON SITE 10,516.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 228,552.29 396,860.32 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/29/10 270 07/16/10 07/13/10 08/11/11 44 3 0 0 10% 16% PROGRESS IS SATISFACTORY HENNEKE, LARRY RESIDENT ENGINEER PROGRAM CAS145 DATE 09/23/10