PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/23/14 EST. NO.01 TIME 12:11 PM R.E. NAME: TOLLISON, RON 03-2F0004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/23/14 EST. NO.01 TIME 12:11 PM R.E. NAME: TOLLISON, RON 03-2F0004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/23/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2F0004 TIME 12:11 PM ESTIMATE NO. 01 BID OPENING 07/23/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/18/14 R.E. NAME: TOLLISON, RON DATE OF THIS ESTIMATE 09/23/14 LOCATION PROGRESS ESTIMATE 03-VAR ----------------- DIRT AND AGGREGATE IN BUTTE,COLUSA,GLENN,SACRAMENTO, INTERCHANGE, INC. SUTTER, YOLO, AND YUBA COUNTIES AT 20905 NE SANDY BLVD. VARIOUS LOCATIONS FAIRVIEW OR 97024 FED. AID NO. HSST-000C(373) UPGRADE GUARDRAIL END TREATMENTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,870.0000 1,870.00 1.000 1,870.00 1.000 1,870 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 6,500.0000 6,500.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 150.0000 33,750.00 5.000 750.00 5.000 750 004 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.000 0 005 TRAFFIC CONTROL SYSTEM LS 377,800.0000 377,800.00 0.022 8,311.60 0.022 8,311 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.000 0 007 TEMPORARY RAILING (TYPE K) LF 45.0000 21,600.00 0.000 0 008 ALTERNATIVE TEMPORARY CRASH CUSHION EA 1,375.0000 11,000.00 0.000 0 009 JOB SITE MANAGEMENT LS 28,440.0000 28,440.00 0.022 625.68 0.022 625 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 880.0000 880.00 0.750 660.00 0.750 660 011 TEMPORARY CONCRETE WASHOUT LS 5,500.0000 5,500.00 0.000 0 012 ASBESTOS COMPLIANCE PLAN LS 1,870.0000 1,870.00 1.000 1,870.00 1.000 1,870 013 TREATED WOOD WASTE LB 0.1000 90,000.00 0.000 0 014 REMOVE GUARDRAIL LF 3.3500 425,450.00 1,150.000 3,852.50 1,150.000 3,852 015 REMOVE ASPHALT CONCRETE DIKE LF 20.0000 3,000.00 0.000 0 016 ADJUST GUARDRAIL LF 25.0000 1,250.00 0.000 0 017 REMOVE CONCRETE (CY) CY 1,000.0000 1,000.00 0.000 0 018 REMOVE BRIDGE APPROACH RAILING(TYPE 8) LF 40.0000 7,200.00 0.000 0 019 CONCRETE BACKFILL CY 250.0000 2,250.00 0.000 0 (F) 020 IMPORTED BORROW (CY) CY 250.0000 1,750.00 0.000 0 021 MINOR HOT MIX ASPHALT TON 500.0000 19,000.00 0.000 0 022 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 25.0000 6,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/23/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2F0004 TIME 12:11 PM ESTIMATE NO. 01 BID OPENING 07/23/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/18/14 R.E. NAME: TOLLISON, RON DATE OF THIS ESTIMATE 09/23/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT SQYD 50.0000 3,800.00 0.000 0 (MISCELLANEOUS AREA) 024 MINOR CONCRETE (MINOR STRUCTURE) CY 2,000.0000 602,000.00 0.000 0 (F) 025 BAR REINFORCING STEEL (EPOXY COATED) LB 22.5000 16,470.00 0.000 0 (F) 026 ROCK SLOPE PROTECTION (NO. 2, METHOD B) CY 200.0000 4,400.00 0.000 0 (F) (CY) 027 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 25.0000 1,375.00 0.000 0 028 MISCELLANEOUS IRON AND STEEL LB 5.0000 1,530.00 0.000 0 (F) 029 OBJECT MARKER (TYPE L-1) EA 50.0000 11,000.00 1.000 50.00 1.000 50 030 MIDWEST GUARDRAIL SYSTEM LF 19.0000 788,500.00 1,062.500 20,187.50 1,062.500 20,187 031 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 21.0000 856,800.00 0.000 0 032 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 24.0000 140,160.00 0.000 0 033 MIDWEST GUARDRAIL SYSTEM(8'STEEL POST) LF 31.0000 539,400.00 0.000 0 034 VEGETATION CONTROL (MINOR CONCRETE) SQYD 64.5000 279,930.00 0.000 0 035 SINGLE THRIE BEAM BARRIER (STEEL POST) LF 50.0000 7,000.00 0.000 0 036 REDUCER ELEMENT(TYPE C) EA 750.0000 3,000.00 0.000 0 037 TRANSITION RAILING (TYPE WB-31) EA 3,500.0000 840,000.00 0.000 0 038 END CAP(3/4 WRAP END SECTION) EA 75.0000 11,250.00 0.000 0 039 END ANCHOR ASSEMBLY (TYPE SFT) EA 750.0000 127,500.00 0.000 0 040 END ANCHOR ASSEMBLY (TYPE CA) EA 3,500.0000 7,000.00 0.000 0 041 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,350.0000 258,500.00 1.000 2,350.00 1.000 2,350 042 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,200.0000 594,000.00 1.000 2,200.00 1.000 2,200 043 ALTERNATIVE CRASH CUSHION EA 21,000.0000 21,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/23/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 03-2F0004 TIME 12:11 PM ESTIMATE NO. 01 BID OPENING 07/23/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/18/14 R.E. NAME: TOLLISON, RON DATE OF THIS ESTIMATE 09/23/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 42,727.28 42,727.28 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 42,727.28 42,727.28 044 MOBILIZATION LS 615,997.0000 615,997.00 0.000 0 ORIGINAL CONTRACT AMOUNT 6,792,222.00 TOTAL WORK COMPLETED 42,727.28 42,727.28 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 42,727.28 42,727.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/21/14 225 09/16/14 09/16/14 08/03/15 3 0 0 0 1% 1% PROGRESS IS SATISFACTORY TOLLISON, RON RESIDENT ENGINEER PROGRAM CAS145 DATE 09/23/14